Valid

GB/T 40616-2021Technical requirements for simulation test of control system functions of the rural photovoltaic power station cluster (English PDF)

村镇光伏发电站集群控制系统仿真测试技术要求

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for GB/T 40616-2021 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

October 11, 2021

Implementation date

May 1, 2022

Scope

GB/T 40616-2021 is the English-translated version of 村镇光伏发电站集群控制系统仿真测试技术要求.

GB/T 40616-2021 describes how the control system of a cluster of rural photovoltaic power stations is tested by simulation.

It defines the test items for the cluster monitoring master station and for the monitoring terminals, the general, functional and performance requirements of the simulation test system, and the test steps with the criteria for judging the results.

Tests are run with real-time simulation of the power and communication systems and the tested hardware in the loop, and informative annexes give the system architecture, a record form and a test report model.

It applies to village and town photovoltaic power station clusters connected to grids of 10 kV and below. It was issued on 11 October 2021 and has applied since 1 May 2022.

Found what you need?

Document preview — GB/T 40616-2021

National Standard of the People's Republic of China

ICS
27.160
Classification
F 12

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Foreword
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions
  • 4 Basic rules
  • 5 Test item
  • 5.1 Monitoring master station test item
  • 5.2 Monitoring terminal test item
  • 6 Test system
  • 6.1 General requirements
  • 6.2 Functional requirements of the simulation test system
  • 6.3 Performance requirements of simulation test system
  • 7 Test steps and result judgment
  • 7.1 Cluster monitoring master station function test
  • 7.2 Monitoring terminal function test
  • Appendix A (informative) The overall architecture of the simulation test system for the cluster control system of the village and town photovoltaic power station
  • Appendix B (Informative) Simulation Test Record Form of Village and Township Photovoltaic Power Station Cluster Control System
  • Appendix C (Informative) Village and Township Photovoltaic Power Station Cluster Control System Simulation Test Report

Foreword

This document is in accordance with GB/T 1.1-2020 "Guidelines for Standardization Part 1: Structure and Drafting Rules of Standardization Documents". To be drafted.

1 Scope

This document specifies the simulation test items, test systems, test procedures and result judgments of the cluster control system of village and town photovoltaic power stations.

This document is applicable to clusters of village and town photovoltaic power plants that are connected to the power grid of 10kV and below.

2 Normative references

The contents of the following documents constitute the indispensable clauses of this document through normative references in the text. Among them, dated quotations Only the version corresponding to that date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to this document.

GB/T 36116 Functional requirements for cluster control system of photovoltaic power stations in villages and towns

DL/T 634.5-101 Telecontrol Equipment and System Part 5-101.Transmission Protocol Basic Telecontrol Task Supporting Standard

DL/T 634.5-104 Telecontrol equipment system Part 5-104.Transmission protocol adopts IEC 60870-5- standard transmission protocol set 101 network access

3 Terms and definitions

The terms and definitions defined in GB/T 36116 apply to this document.

4 Basic regulations

4.1 The simulation test of the cluster control system of the village and town photovoltaic power station shall include the functions of monitoring the master station and the monitoring terminal of the cluster control system test.

4.2 The simulation test of the cluster control system of the village and town photovoltaic power station should be realized through real-time simulation and the tested hardware-in-the-loop test. The real-time simulation department The sub-should have the ability to simulate power systems and communication systems.

4.3 The simulation test should prepare a test outline, including test items, test steps, test results judgment analysis, etc., and develop safety precautions.

4.4 The simulation test equipment should not be connected to the test power supply from the tested object.

4.5 Before testing, the tested hardware such as the cluster monitoring master station or monitoring terminal, real-time simulation device, and communication simulation system should pass the test system. The system interface is interconnected, and the typical architecture is shown in Appendix A.

4.6 Data should be recorded during the test. See Appendix B for the record sheet.

4.7 After the test is completed, a simulation test report should be formed. See Appendix C for the simulation test report of the cluster control system of the village and town photovoltaic power station.

4.8 The function test results of the photovoltaic power station cluster control system of the tested villages and towns shall meet the relevant regulations of GB/T 36116.

5 Test items

5.1 Monitoring the main station test project

The test project of the cluster monitoring master station of the village and town photovoltaic power station should include the basic function test and the extended function test of the cluster monitoring master station.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download GB/T 40616-2021

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 40616-2021

$240.00