Valid

GB/T 36116-2018Requirements for the control system function of the rural photovoltaic power station cluster (English PDF)

村镇光伏发电站集群控制系统功能要求

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for GB/T 36116-2018 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

March 15, 2018

Implementation date

October 1, 2018

Scope

GB/T 36116-2018 is the English-translated version of 村镇光伏发电站集群控制系统功能要求.

GB/T 36116-2018 sets the functional requirements for the systems that control clusters of rural photovoltaic power stations: village PV plants of no more than 500 kW each, linked by distribution lines to the same 35 kV or 110 (66) kV substation.

It lays down basic provisions and the system architecture, made up of monitoring terminals at the plants, a cluster monitoring master station and the communication system.

It then specifies the functions of the master station and the plant terminals and the communication requirements, with references to the DL/T 634.5-101 and DL/T 634.5-104 telecontrol protocols.

Annexes give the cluster control architecture, function configuration tables and performance requirements for the master station. It applies to poverty-alleviation PV stations in grids of 10 kV and below, was issued on 15 March 2018 and has applied since 1 October 2018.

Found what you need?

Document preview — GB/T 36116-2018

National Standard of the People's Republic of China

ICS
27.160
Classification
F 12

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Preface
  • 1 Scope
  • 2 Normative references
  • 3 Terms and Definitions
  • 4 Basic regulations
  • 5 Village and town photovoltaic power station cluster control system architecture
  • 6 Photovoltaic power station cluster monitoring master station function configuration
  • 7 Photovoltaic power station monitoring terminal function configuration
  • 8 Communication
  • Appendix A (Informative Appendix) Cluster Control Architecture for Photovoltaic Power Plant Clusters
  • Appendix B (normative appendix) Table of function configuration of monitoring stations for photovoltaic power stations in towns and villages
  • Appendix C (normative appendix) Performance requirements for cluster monitoring primary station of town photovoltaic power station
  • Appendix D (Normative Appendix) Table of Functions of Monitoring Terminals for Photovoltaic Power Plants in Villages and Towns

Foreword

This standard was drafted in accordance with the rules given in GB/T 1.1-2009.

1 Scope

This standard specifies the technical requirements for the cluster control system architecture, function configuration, and communication of photovoltaic power stations in villages and towns.

This standard is applicable to the cluster control system of PV power-saving poverty alleviation power stations in power grids with voltage ratings of 10 kV and below.

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this document. For undated references, the latest version (including all amendments) applies to this document.

GB/T 29319 Photovoltaic Power Generation System Access Distribution Network Technical Regulations

DL/T 634.5-101 Telecontrol Equipment and Systems Part 5-101. Transmission Protocol Basic Remote Task Supporting Standards

DL/T 634.5-104 Telecontrol equipment and systems Part 5-104. Transmission protocols using the standard transmission protocol set IEC 60870-5-101 network access

NB/T 32016 Grid-connected photovoltaic power generation monitoring system specification

3 Terms and definitions

The following terms and definitions apply to this document.

3.1 Village photovoltaic power station

Photovoltaic power stations with a capacity of no more than 500kW built in rural areas.

3.2 Photovoltaic grid-connected inverter

The electrical equipment that converts the DC power generated by solar cells into AC power and feeds it into the power grid.

3.3 Point of internet connection

For photovoltaic power stations with boost stations, the bus or nodes on the high-pressure side of the booster station; for photovoltaic power stations without a boost station, photovoltaic generation Power station output summary point.

3.4 Village photovoltaic power station cluster

Adjoining geographically, and assembled via power distribution lines to multiple photovoltaic power stations at the same 35kV or 110(66)kV substation set.

3.5 Photovoltaic power station cluster control

With the principle of close electrical distance and centralized management and control, the integration and centralized control of multiple PV power plants can be realized.

4 Basic regulations

4.1 The photovoltaic power plant cluster control system in villages and towns should be monitored by photovoltaic power station, town photovoltaic power station cluster monitoring master station and communication system.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download GB/T 36116-2018

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 36116-2018

$145.00