GB/T 39834-2021Technical requirement of fully mechanized bag filling mining with paste (English PDF)
综合机械化膏体袋式充填采煤技术要求
This is a limited preview
Buy now to download the full PDF (22 pages)
Need quotation for your management?
Get a formal quotation for GB/T 39834-2021 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
March 9, 2021
Implementation date
October 1, 2021
Scope
GB/T 39834-2021 is the English-translated version of 综合机械化膏体袋式充填采煤技术要求.
GB/T 39834-2021 sets the technical requirements of fully mechanized paste bag filling in coal mining, the method that fills the goaf with bagged paste as the face advances.
It fixes the preparation of the paste, its transport, the filling process, the requirements on the filling hydraulic supports and on the bags, and the observation of the surface subsidence and of the underground pressure.
It applies to fully mechanized longwall faces in seams up to 5 m thick worked with the inclined mining method. Mining companies and design institutes use it. Issued on 9 March 2021, it has applied since 1 October 2021.
Found what you need?
Document preview — GB/T 39834-2021
National Standard of the People's Republic of China
- ICS
- 73.020
- Classification
- D 15
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Foreword
- 1 Scope
- 2 Normative references
- 3 Terms and definitions
- 4 Paste material preparation
- 4.1 Composition and requirements of raw materials
- 4.2 Basic performance requirements of paste
- 4.3 Paste preparation system
- 5 Paste material transportation
- 5.1 System composition
- 5.2 Process flow
- 5.3 Technical requirements
- 6 Paste filling process and requirements
- 6.1 Working surface layout
- 6.2 Time coordination of coal mining and filling
- 6.3 Filling process flow
- 6.4 Technical requirements for filling operation
- 6.5 Paste filling strength requirements
- 7 Filling hydraulic support and filling bag requirements
- 7.1 Filling the hydraulic support
- 7.2 Filling the bag
- 8 Surface deformation and underground mine pressure monitoring
- 8.1 Calculation of Equivalent Mining Height
- 8.2 Monitoring of surface deformation
- 8.3 Underground mine pressure monitoring
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1: Structure and Drafting Rules of Standardization Documents" Drafting.
1 Scope
This document specifies the preparation of paste material, paste material transportation, paste filling process and the process of integrated mechanized paste bag filling coal mining Requirements, requirements for filling hydraulic supports and filling bags, surface deformation and underground pressure observation.
This document is applicable to the comprehensive mechanized wall working face with coal seam thickness below 5m, and the inclined mining method should be adopted.
2 Normative references
The contents of the following documents constitute the indispensable clauses of this document through normative references in the text. Among them, dated quotations Only the version corresponding to that date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to this document.
GB/T 1596 Fly ash used in cement and concrete
GB/T 10171-2016 Construction Machinery and Equipment Concrete Mixing Plant (Building)
GB/T 14685 Pebble and gravel for construction
GB/T 20105 Air duct coated cloth
GB 50026 Engineering Survey Specification
GB/T 50080-2016 Standard for test methods of ordinary concrete mixture performance
GB/T 50081-2019 Standard for test methods of concrete physical and mechanical properties
HG/T 2580 Determination of tensile strength and elongation at break for rubber or plastic coated fabrics
3 Terms and definitions
The following terms and definitions apply to this document.
3.1 Pasteofcoalminegangue
Crush and process coal mine gangue into aggregate with a certain gradation, and mix and stir it with cement, fly ash, additives, etc. in proportion to water It is a paste-like slurry with no critical flow rate and no need for dehydration.
3.2 Filingstationwithpaste
Crush coal gangue, etc., weigh it with cement, fly ash, additives, water, etc., stir to make a paste-like slurry, and use a filling pump to remove the paste The process (equipment) system and supporting engineering for the continuous input of the body into the filling pipeline.
3.3 Masspercentageconcentration
The mass percentage of all gangue in the paste slurry.
3.4 Separationwal
The retaining wall used for grouping isolation and filling is erected between the two lanes and the filling bag by using single pillars, waste tracks, bamboo curtains, etc.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 22 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 1596Fly ash used for cement and concrete
- GB/T 10171-2016Building construction machinery and equipment - Concrete mixing plant(tower)
- GB/T 14685Pebble and crushed stone for construction
- GB/T 20105Coated fabrics for air ducts
- GB 50026Standard for engineering surveying
- GB/T 50080-2016Standard for test method of performance on ordinary fresh concrete
GB/T 50081-2019
Cited by
- NB/T 11432-2023Technical specification for coal mine gangue-based solid waste filling
- NB/T 11433-2023Technical specification for short wall interval filling mining in coal mine
- NB/T 11434.3-2023Paste filling in coal mine - Part 3: Effect evaluation method
- NB/T 11446-2023Technical requirements of mining roadway by roadway with continuous backfilling in coal mine
Similar standards
How to Download GB/T 39834-2021
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB 50026-2020 — Standard for engineering surveying
GB/T 10171-2016 — Building construction machinery and equipment - Concrete mixing plant(tower)
GB/T 14685-2022 — Pebble and crushed stone for construction
Secure payment via Stripe
Payments accepted
GB/T 39834-2021
$155.00