Valid

NB/T 11446-2023Technical requirements of mining roadway by roadway with continuous backfilling in coal mine (English PDF)

煤矿连采连充技术要求

Preview PDF

This is a limited preview

Buy now to download the full PDF (19 pages)

Need quotation for your management?

Get a formal quotation for NB/T 11446-2023 in 30 minutes.

Issued by

NEA

Level / Type

Industry · Recommended

Issue date

December 28, 2023

Implementation date

June 28, 2024

Scope

NB/T 11446-2023 is the English-translated version of 煤矿连采连充技术要求.

NB/T 11446-2023 is the Chinese energy industry standard for continuous mining and backfilling, in which coal is extracted roadway by roadway and each branch roadway is filled before the next is mined.

It sets requirements for filling materials and for the system layout: working face arrangement, the combined production system, preparation and transport of filling material, layout of mining and filling branch roadways, and ventilation.

It lists the coal mining, transfer, material preparation and filling equipment, describes the mining and filling processes, and specifies monitoring of mine pressure, filling quality, rock movement and surface deformation.

An informative annex explains how to calculate retaining wall strength. Issued on 28 December 2023, it has applied since 28 June 2024.

Found what you need?

Document preview — NB/T 11446-2023

National Standard of the People's Republic of China

ICS
73.020
Classification
D 15

Issued by: National Energy Administration of the People's Republic of China

Contents

  • Preface
  • 1 Scope
  • 2 Normative references
  • 3 Terms and Definitions
  • 4 Filling material requirements
  • 5 System Layout
  • 5.1 Working surface layout
  • 5.2 Continuous mining and filling production system
  • 5.3 Filling material preparation system
  • 5.4 Filling material transport system
  • 5.5 Layout of filling and coal mining branch tunnels
  • 5.6 Ventilation system
  • 6 Equipment composition
  • 6.1 Coal mining equipment
  • 6.2 Transfer equipment
  • 6.3 Filling material preparation equipment
  • 6.4 Filling equipment
  • 7 Technology
  • 7.1 Coal mining technology
  • 7.2 Filling process
  • 8 Monitoring content
  • 8.1 Mine pressure monitoring
  • 8.2 Filling quality monitoring
  • 8.3 Monitoring of rock movement and deformation
  • 8.4 Surface deformation monitoring
  • Appendix A (Informative) Calculation method of retaining wall strength
  • References

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1: Structure and drafting rules for standardization documents" Drafting.

1 Scope

This document specifies the general requirements, system layout, equipment composition, process flow, and monitoring content of continuous mining and filling technology in coal mines.

This document is applicable to coal mines that adopt continuous mining and filling technology.

2 Normative references

The contents of the following documents constitute the essential clauses of this document through normative references in this document.

For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to this document.

GB/T 10171 Construction machinery and equipment Concrete mixing station (building)

GB 22340 Safety specification for belt conveyors used in coal mines

GB/T 39834 Technical requirements for comprehensive mechanized paste bag filling coal mining

GB/T 50081 Test methods for physical and mechanical properties of concrete

GB/T 51169 Coal industry mine mining equipment standard

JB/T 13439 Piston filling pump for mining

NB/T 51023-2014 Technical requirements for self-weight feeding system of solid filling materials Coal Mine Surveying Procedures Specifications for the layout of coal pillars and compressed coal mining in buildings, water bodies, railways and main wells

3 Terms and definitions

The terms and definitions defined in NB/T 51023-2014 and the following apply to this document.

3.1 Headgate for continuous mining and backfilling

Continuous mining and charging transport lane headgate forming roadway by roadway with continuous backfilling.

A tunnel arranged at the lower end of the continuous mining and filling working face, used to transport coal out and introduce fresh air.

3.2 Tailgate for continuous mining and backfilling

It is arranged at the upper end of the continuous mining and filling working face and is used to transport filling materials and lead out polluted air.

3.3 Setup entry for continuous mining and backfilling

continuous backfilling setup entry forming roadway by roadway with continuous backfilling.

Before the continuous mining and filling working face is mined, it is arranged at the boundary of the working face, connecting the transport lane and the return air lane, and is used for ventilation, transportation and pedestrians. Alley.

3.4 Mining branch roadway

A tunnel arranged between the transport tunnel and the return air tunnel of the working face, where coal mining operations are carried out.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 19 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download NB/T 11446-2023

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
19 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

NB/T 11446-2023

$330.00