Valid

NB/T 51030-2015Construction and Acceptance Specifications of Grouting Engineering at Working Face in Coal Mine Shaft and Roadway (English PDF)

煤矿井巷工作面注浆工程施工与验收规范

Open the NB/T 51030-2015 preview as PDF

Preview — first pages of NB/T 51030-2015 (full document: 41 pages)

This is a limited preview

Buy now to download the full PDF (41 pages)

Issued by

NEA

Level / Type

Industry · Recommended

Issue date

April 2, 2015

Implementation date

September 1, 2015

Scope

NB/T 51030-2015 is the English-translated version of 煤矿井巷工作面注浆工程施工与验收规范.

NB/T 51030-2015 governs the construction and acceptance of pre-grouting from the working face in coal mine shafts and roadways. When a shaft is sunk or a roadway driven through water-bearing strata, the water has to be kept out before the ground is opened: holes are drilled ahead of the face, cement grout is injected under pressure to seal the fissures, and only then does excavation proceed through the treated ground. Done badly, the face floods or the grout curtain leaks for the life of the mine. The specification sets the general provisions and defined terms, then the basic requirements on hydrogeological data, the grouting design and the qualification of the crew. It covers the grouting plug wall that seals the face and resists the grouting pressure, with the calculation of its thickness, and the arrangement of grout holes - number, direction, depth and spacing - for vertical shafts, inclined shafts and roadways. Grouting materials and mix design follow, with water-cement ratios and additives, then drilling, the water pressure test, grouting pressure and flow limits, sequencing and the criteria for ending a hole. The testing that proves the treated zone is sealed, the records to be kept, and the acceptance of the grouting works close the specification. It applies to coal mine construction in China.

Document preview — NB/T 51030-2015

National Standard of the People's Republic of China

ICS
73.020
Classification
P00/09

Issued by: National Energy Administration of the PRC

Contents

  • 1 General Provisions1
  • 2 Terms2
  • 3 Basic Regulations4
  • 4 Acceptance Procedure of Grouting Engineering at Working Face6
  • 5 Construction and Acceptance of Mine Shaft Grouting Engineering7
  • 5.1 General Regulations7
  • 5.2 Design of Grouting Engineering7
  • 5.3 Grouting Drilling Construction in the Working Face14
  • 5.4 Construction of Grouting Boreholes in Mine Shaft Liners15
  • 5.5 Grouting Construction16
  • 5.6 Acceptance of Mine Shaft Grouting Borehole Engineering17
  • 5.7 Acceptance of Mine Shaft Grouting Engineering18
  • 6 Construction and Acceptance of Grouting Engineering in Mine Inclined Shaft and Roadway21
  • 6.1 General Regulations21
  • 6.2 Design of Grouting Engineering21
  • 6.3 Construction of Grouting Cushion Wall at Working Face in Mine Inclined Shaft and Roadway24
  • 6.4 Construction of Grouting Boreholes in Mine Shaft and Roadway25
  • 6.5 Grouting Construction at Working Face in Mine Inclined Shaft and Roadway25
  • 6.6 Construction of Backfill Grouting in Mine Inclined Shaft and Roadway26
  • 6.7 Acceptance of Grouting Cushion Wall26
  • 6.8 Acceptance of Grouting Boreholes Engineering26
  • 6.9 Acceptance of Grouting Engineering27
  • Appendix A Original Recording Sheets of Grouting Borehole Drilling in Underground Coal Mine28
  • Appendix B Original Recording Sheets of Grouting in Underground Coal Mine29
  • Appendix C Quality Inspection and Acceptance Recordings of Mine Shaft and Roadway Engineering30
  • Explanation of Words in Specification33
  • A List of Reference Standards34
  • Addition: Explanation of Provisions35

Foreword

This document was issued on 2 April 2015 by the National Energy Administration of the PRC and takes effect on 1 September 2015.

It is a NB/T standard: recommended rather than compulsory, but it is the text a Chinese reviewer applies when assessing a submission.

It is classified under ICS 73.020, Chinese classification P00/09.

This specification was prepared by the Zhongguo Meitan Jianshe Xiehui together with the relevant units in accordance with the Notice of the National Energy Administration on Issuing the First Batch of Energy Sector Industry Standard Formulation (Revision) Plans for 2012 (Guo Neng Ke Ji [2012] No. 83) and the requirements for drafting specifications. During drafting, the drafting group carried out extensive investigation, research and special studies, summarized the domestic construction experience of grouting engineering in coal mine shafts and roadways, widely solicited the opinions of relevant units and experts of the national coal industry in various forms and, after repeated study and revision, finalized this specification.

This specification consists of 6 chapters and 3 appendices. Its main contents include general provisions, terms, basic regulations, the acceptance procedure of grouting engineering at shaft and roadway working faces, the construction and acceptance of vertical shaft grouting engineering, and the construction and acceptance of grouting engineering in inclined shafts and roadways (adits).

This specification is under the administration of the National Energy Administration, its routine management is the responsibility of the Zhongguo Meitan Jianshe Xiehui, and the explanation of its technical contents is the responsibility of Henan Nengyuan Huagong Jianshe Jituan Co., Ltd. Comments and suggestions arising during implementation should be sent to Henan Nengyuan Huagong Jianshe Jituan Co., Ltd. (Building 1, Longcheng Plaza, Wenhua North Road, Huiji District, Zhengzhou, Henan Province; postcode 450000).

Chief drafting units: Henan Nengyuan Huagong Jianshe Jituan Co., Ltd.; Hunan Chuxiang Jianshe Gongcheng Co., Ltd.; Pingmei Shenma Jiangong Jituan Co., Ltd. Participating drafting units: Henan Guolong Kuangye Jianshe Co., Ltd.; Zhongding Guoji Gongcheng Co., Ltd.; Chongqing Juneng Jianshe (Jituan) Co., Ltd.; Shanxi Xishan Meidian Jianzhu Gongcheng Jituan Co., Ltd.

1 Scope

NB/T 51030-2015 governs the construction and acceptance of pre-grouting from the working face in coal mine shafts and roadways. When a shaft is sunk or a roadway driven through water-bearing strata, the water has to be kept out before the ground is opened: holes are drilled ahead of the face, cement grout is injected under pressure to seal the fissures, and only then does excavation proceed through the treated ground. Done badly, the face floods or the grout curtain leaks for the life of the mine. The specification sets the general provisions and defined terms, then the basic requirements on hydrogeological data, the grouting design and the qualification of the crew. It covers the grouting plug wall that seals the face and resists the grouting pressure, with the calculation of its thickness, and the arrangement of grout holes - number, direction, depth and spacing - for vertical shafts, inclined shafts and roadways. Grouting materials and mix design follow, with water-cement ratios and additives, then drilling, the water pressure test, grouting pressure and flow limits, sequencing and the criteria for ending a hole. The testing that proves the treated zone is sealed, the records to be kept, and the acceptance of the grouting works close the specification. It applies to coal mine construction in China.

1.0.1 This specification is formulated to strengthen the management of construction and acceptance of grouting engineering at working faces in coal mine shafts and roadways, to standardize the technical requirements for working face grouting design, construction and acceptance, and to ensure the construction quality and safety of coal mine shaft and roadway engineering.

1.0.2 This specification is applicable to the construction and acceptance of working face grouting engineering in coal mine vertical shafts, inclined shafts and roadways (adits).

1.0.3 The requirements for construction and acceptance of working face grouting engineering in coal mine shafts and roadways set out in the relevant contracts and engineering technical documents of coal mine shaft and roadway engineering shall not be lower than the provisions of this specification.

1.0.4 The construction of shaft and roadway engineering shall adhere to the water prevention and control principle of 'prediction and forecasting, exploration whenever in doubt, exploration before excavation, treatment before mining'.

1.0.5 Green construction shall be fully implemented in working face grouting engineering of coal mine shafts and roadways. Before the grouting engineering is carried out, an environmental protection plan for the construction shall be prepared, a sound environmental protection system shall be established, management responsibilities shall be defined, environmental factors shall be identified and evaluated, and management plans shall be prepared for significant environmental factors to achieve effective control.

1.0.6 In addition to complying with this specification, the construction and acceptance of working face grouting engineering in coal mine shafts and roadways shall also comply with the provisions of the current relevant national and industry standards.

2 Terms

2.0.1 Working face of underground mine roadway: the general term for heading faces, drilling and exploration faces, grouting faces and other working faces underground in all kinds of mines.

2.0.2 Pre-grouting at mine working face: grouting operations carried out from the working face into the underground rock strata during shaft sinking and roadway driving.

2.0.3 Backfill grouting between shaft liners: grouting operations performed on the voids between two layers of shaft liner, where the shaft is supported by a double-layer liner, to prevent or seal water leakage through the shaft liner.

2.0.4 Post grouting: grouting operations performed on the voids within or behind the shaft and roadway walls and on the rock mass after the shaft and roadway have been excavated.

2.0.5 Backfill grouting: grouting operations performed on the outside of the shaft liner and on the fissures and pores of the surrounding rock.

2.0.6 Upward grouting: grouting operations in which the grouting hole is drilled to the design depth in one pass and grouting is then carried out layer by layer or section by section from the bottom upwards.

2.0.7 Downward grouting: grouting operations in which borehole drilling and grouting alternate layer by layer or section by section from the top downwards.

2.0.8 Height of grouting section: the grouting length of each section when the rock strata to be grouted are divided into several sections that are grouted in sequence.

2.0.9 Grouting cushion; grouting pad: a concrete structure constructed in advance above the aquifer during working face grouting of a vertical shaft, capable of withstanding the maximum grouting pressure and preventing grout leakage and grout escape towards the heading face.

2.0.10 Grouting rock plug: a rock pillar temporarily left above (in front of) the aquifer during working face pre-grouting of shafts and roadways, capable of withstanding the maximum grouting pressure and preventing grout leakage and grout escape towards the heading face.

2.0.11 Grouting plug wall: a structure constructed in advance in the section of a roadway to be grouted, capable of withstanding the maximum grouting pressure and preventing grout leakage and grout escape into the roadway.

2.0.12 Grouting pressure: the pressure required during grouting to overcome the flow resistance of the grout and to make the grout spread over a certain range.

2.0.13 Final grouting pressure; grouting terminal pressure: the pressure of the grout fed in at the grouting hole collar at the end of grouting.

2.0.14 Final grouting volume: the flow rate of the grout fed in at the grouting hole collar at the end of grouting.

2.0.15 Effective diffusion distance of grout: the effective distance, measured radially outwards from the grouting hole as the centre, over which the grout spreads so as to meet the purposes of water sealing and reinforcement.

2.0.16 Mixing ratio of grouts: the proportions of the various materials that make up the grout.

2.0.17 Orifice tube: a steel pipe installed over a certain depth at the borehole collar, capable of withstanding the maximum grouting pressure, connectable to the collar grouting device, and serving to prevent collapse and to guide the borehole.

2.0.18 Steel pipes shield grouting: a support technique in which a group of steel pipes is driven in advance into the strata along the outside of the excavation contour and the strata are reinforced by grouting through the steel pipes, so that the steel pipes, the grout and the rock strata jointly bear the ground pressure.

2.0.19 Chemical grout: the general term for organic grouting materials and water glass (sodium silicate) type grouts used in grouting engineering.

3 Basic Regulations

3.0.1 Units engaged in the construction of working face grouting engineering in coal mine shafts and roadways shall possess the corresponding qualifications; the construction site shall meet the corresponding technical requirements; a sound quality management system shall be in place; and approved technical documents such as the construction organization design, construction operating rules or construction safety technical measures shall be available.

3.0.2 Personnel engaged in the construction of working face grouting engineering in coal mine shafts and roadways shall have received coal mine safety training and shall work with the relevant certificates.

3.0.3 Before construction of the grouting engineering, the relevant hydrogeological, engineering geological, design, construction and other technical data for the construction area shall be collected.

3.0.4 Before construction of the grouting engineering, the corresponding construction organization design, construction operating rules or construction safety technical measures shall be prepared according to the quantity of grouting work, the construction period, the technical complexity and other conditions, and shall be approved as required.

3.0.5 The construction organization design and the construction operating rules shall contain the following main contents: 1 project overview; 2 geological and hydrogeological conditions; 3 construction objectives and requirements; 4 construction scheme (including the main technical parameters); 5 construction technology; 6 inspection and evaluation of the grouting effect; 7 requirements for construction materials and forecast of their quantities; 8 production system and labour organization; 9 construction schedule; 10 technical measures for quality, safety and environmental protection; 11 main machinery and equipment and their operating procedures; 12 escape route map and emergency plan; 13 attached drawings (comprehensive result chart of the pumping test, geological columnar section, borehole layout plan, borehole cross-sections, etc.).

3.0.6 The construction safety technical measures shall contain the following main contents: 1 technical measures to ensure construction safety; 2 technical measures to ensure engineering quality; 3 emergency handling of special situations; 4 escape route map.

3.0.7 The construction equipment shall meet the needs of the construction, ensure continuous operation and comply with the relevant specifications and product quality standards.

3.0.8 The materials used in construction shall comply with the product quality standards and environmental protection requirements.

3.0.9 Before construction of grouting boreholes, the shaft and roadway support at the drilling and grouting work sites shall be strengthened, and drainage equipment and facilities of sufficient capacity shall be provided.

3.0.10 The construction period shall be strictly executed in accordance with the grouting construction organization design, and shall include a reasonable time for each process, including construction preparation, pouring and setting of the grouting cushion (wall), embedding and setting of the orifice tubes, reinforcement of the grouting cushion (wall) and the shaft liner (roadway), drilling and reaming of grouting holes, grouting and setting, and inspection of the grouting effect.

3.0.11 After completion of construction, a construction summary shall be prepared, covering the project overview, analysis of geological conditions, quantities of work, quantities of materials, construction period, effect inspection, engineering evaluation, and problems and suggestions.

4 Acceptance Procedure of Grouting Engineering at Working Face

4.0.1 Working face grouting engineering shall be accepted process by process, and quality acceptance records shall be produced.

4.0.2 The main materials, equipment and facilities used for working face grouting engineering shall be subject to on-site acceptance and shall be confirmed by the construction owner or the supervision unit.

4.0.3 The acceptance of working face grouting engineering shall be organized by the construction owner or the supervision unit with the participation of the relevant personnel, and all parties taking part in the quality acceptance shall possess the corresponding qualifications.

4.0.4 Working face grouting engineering shall pass completion quality acceptance when all of the following are met: 1 the quality of every process of the grouting engineering has passed acceptance; 2 the quality control documentation is complete; 3 the grouting effect meets the design or contract requirements.

4.0.5 Where a process of the grouting engineering fails acceptance, it shall be handled in accordance with the following provisions.

1 A failed process that can be remedied shall be remedied promptly, and construction of the next process may proceed only after it has passed acceptance.

2 A failed process that is difficult to remedy but has little influence on the construction of subsequent processes and on grouting safety and quality may proceed to the next process after confirmation by the construction owner or the supervision unit; the originally failed process shall be evaluated and handled after all the grouting engineering is completed.

3 A failed process that is difficult to remedy and seriously affects the construction of subsequent works shall be subject to expert review, and construction of the next process may proceed only after special treatment measures have been formulated.

Remaining clauses in the full document

  • 5 Construction and Acceptance of Mine Shaft Grouting Engineering
  • 5.1 Construction and Acceptance of Mine Shaft Grouting Engineering — General Regulations
  • 5.2 Design of Grouting Engineering
  • 5.3 Grouting Drilling Construction in the Working Face
  • 6 Construction and Acceptance of Grouting Engineering in Mine Inclined Shaft and Roadway

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 41 pages — is available in the English PDF.

How to Buy NB/T 51030-2015

  1. 1Add to cart. Click the "Buy NB/T 51030-2015" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
41 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

NB/T 51030-2015