Valid

NB/T 11536-2024Technical specification for underground grouting reinforcement and retrofitting of floor for mining above confined aquifer in coal mines (English PDF)

煤矿带压开采底板井下注浆加固改造技术规范

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for NB/T 11536-2024 in 30 minutes.

Issued by

NEA

Level / Type

Industry · Recommended

Issue date

May 24, 2024

Implementation date

November 24, 2024

Scope

NB/T 11536-2024 is the English-translated version of 煤矿带压开采底板井下注浆加固改造技术规范.

NB/T 11536-2024 is the Chinese energy industry specification for reinforcing and retrofitting the coal seam floor by underground grouting where coal is mined above a confined aquifer.

It covers scheme design, including borehole layout, borehole structure and the design of the grouting works, then drilling, grouting and hole sealing, followed by effect testing, completion acceptance and effect evaluation.

Terms such as final grouting pressure and final pumping rate are defined, and the water inrush coefficient of the working face decides whether full floor grouting or targeted exploration is required.

Coal mines apply it together with the Detailed Rules for Coal Mine Water Prevention and Control. Issued on 24 May 2024, it has applied since 24 November 2024.

Found what you need?

Document preview — NB/T 11536-2024

National Standard of the People's Republic of China

ICS
73.020
Classification
D 00

Issued by: National Energy Administration of the People's Republic of China

Contents

  • Preface
  • 1 Scope
  • 2 Normative references
  • 3 Terms and Definitions
  • 4 Grouting reinforcement renovation scheme design
  • 4.1 General Provisions
  • 4.2 Drilling arrangement principles
  • 4.3 Drilling layout design
  • 4.4 Drilling structure design
  • 4.5 Grouting treatment engineering design
  • 5 Drilling and grouting construction
  • 5.1 General Provisions
  • 5.2 Drilling
  • 5.3 Grouting
  • 5.4 Sealing
  • 6 Effect inspection and project acceptance
  • 6.1 Effect test
  • 6.2 Completion acceptance
  • 6.3 Effect Evaluation
  • Appendix A (Informative) Underground Drilling Single Hole Acceptance Form
  • References

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1: Structure and drafting rules for standardization documents" Drafting.

1 Scope

This document specifies the design of underground grouting reinforcement and reconstruction scheme for coal mine floor under pressure mining, drilling and grouting construction, effect inspection and engineering inspection. Technical requirements for collection, etc.

This document is applicable to underground grouting reinforcement and grouting transformation of the bottom plate of coal mines with pressure mining.

2 Normative references

The contents of the following documents constitute essential clauses of this document through normative references in this document.

For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to this document.

NB/T 51030-2015 Specification for construction and acceptance of grouting works in coal mine working faces Detailed Rules for Coal Mine Water Prevention and Control (National Coal Mine Safety Monitoring Bureau)

3 Terms and definitions

The following terms and definitions apply to this document.

3.1 Mining above confined aquifer

Coal mining in an aquifer with confined water pressure.

3.2 Final grouting pressure

The pressure of slurry input into the grouting hole at the end of grouting.

3.3 Side distance

The minimum safe distance between the controlled range of the outermost water exploration drilling hole and the tunnel wall.

3.4 Final pumping rate

Final grouting volume final pump volume.

The flow rate of the grouting pump at the end of grouting.

4 Grouting reinforcement renovation scheme design

4.1 General

4.1.1 When performing underground grouting reinforcement and reconstruction of the floor of a coal mine under pressure mining, the relevant provisions of the "Detailed Rules for Coal Mine Water Prevention and Control" should be implemented.

4.1.2 When the water inrush coefficient of the coal mining face is greater than 0.1 MPa/m, the face should be reinforced by full floor grouting.

When the water inrush coefficient is less than or equal to 0.1MPa/m and greater than 0.06MPa/m, the exploration of structural fracture zones and drilling and geophysical anomaly areas should be carried out.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download NB/T 11536-2024

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

NB/T 11536-2024

$195.00