Valid

GB/T 36119-2018Targeted poverty alleviation—Management and evaluation guide of village photovoltaic power station (English PDF)

精准扶贫 村级光伏电站管理与评价导则

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for GB/T 36119-2018 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

March 15, 2018

Implementation date

October 1, 2018

Scope

GB/T 36119-2018 is the English-translated version of 精准扶贫 村级光伏电站管理与评价导则.

GB/T 36119-2018 is a Chinese national guide to managing and evaluating the village-level photovoltaic power stations built under the targeted poverty alleviation programme in registered poor villages.

It covers the whole life of such a plant: planning and design, construction, acceptance, operation and maintenance, information monitoring, the distribution of the income the station earns, and the evaluation of the project.

It defines the village photovoltaic poverty alleviation power station, the photovoltaic module and the inverter, and refers to the national rules for photovoltaic plant design and construction, grid access to the distribution network and energy metering.

Local authorities, grid companies and the operators of these stations can use it to run and assess them in a consistent way. It was issued on 15 March 2018 and has applied since 1 October 2018.

Found what you need?

Document preview — GB/T 36119-2018

National Standard of the People's Republic of China

ICS
27.160
Classification
F 12

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Preface
  • 1 Scope
  • 2 Normative references
  • 3 Terms and Definitions
  • 4 General
  • 5 Planning and Design Management
  • 6 Construction Management
  • 7 Acceptance Management
  • 8 Operation and Maintenance Management
  • 9 Information Monitoring Management
  • 10 Income Distribution Management
  • 11 Project Evaluation

Foreword

This standard was drafted in accordance with the rules given in GB/T 1.1-2009.

1 Scope

This standard specifies the planning and design management, construction management, acceptance management, operation and maintenance management, and information monitoring Management, income distribution management and project evaluation requirements.

This standard is applicable to village-level photovoltaic poverty-relief power stations constructed in state-owned poor villages.

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this document. For undated references, the latest version (including all amendments) applies to this document.

GB/T 17215.322 Particular requirements for alternating current measuring equipment Part 22. Static active energy meters (0.2S class and 0.5S class)

GB/T 36115 Technical Guidelines for Accurate Poverty Alleviation of Village Photovoltaic Power Plants

GB 50794 photovoltaic power station construction specification

GB 50797 photovoltaic power station design specifications

GB/T 50865 Photovoltaic Generation Access Distribution Network Design Specification

DL/T 448 Electrical Metering Device Technical Management Procedures

DL/T 614 multi-function energy meter

DL/T 645 multi-function energy meter communication protocol

DL/T 5137 Electrical Measurement and Energy Metering Design Specification

3 Terms and definitions

The following terms and definitions apply to this document.

3.1 Village photovoltaic power station for poverty alleviation

Construction of poor villages with established lighting, funds, land, access to networks, consumption, and other conditions will be included in the national PV plan for poverty alleviation. Power station.

3.2 Photovoltaic module

With a package and internal connection, can be independently provided a direct current output, the smallest integral solar cell combination device. Sun The solar assembly.

3.3 Inverter

A device that converts DC power into AC power.

4 General

4.1 The construction of village-level photovoltaic poverty alleviation power stations should be based on local conditions, reasonable design, safe and reliable, and standardized management.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download GB/T 36119-2018

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 36119-2018

$145.00