GB/T 35974.4-2018Plastics and plastic lining pressure vessels—Part 4: Fabrication, inspection and testing for plastic pressure vessels (English PDF)
塑料及其衬里制压力容器 第4部分:塑料制压力容器的制造、检查与检验
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for GB/T 35974.4-2018 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
February 6, 2018
Implementation date
September 1, 2018
Scope
GB/T 35974.4-2018 is the English-translated version of 塑料及其衬里制压力容器 第4部分:塑料制压力容器的制造、检查与检验.
GB/T 35974.4-2018 is Part 4 of the Chinese series on plastics and plastic-lined pressure vessels, and covers the fabrication, technical requirements, inspection and exit-factory requirements of all-plastic pressure vessels.
On materials it sets the acceptance check of the quality certificate, appearance, dimensions and performance indexes, and when materials must be re-inspected. It describes the fabrication methods - rotational molding, dry and wet extrusion and extrusion winding - each with its procedure evaluation.
Inspection is split into exit-factory and type inspection, with the rules for judging products qualified and for re-fabrication, one allowed on welded joints and two on other parts.
The last clause lists the exit-factory documents and the vessel nameplate. It relies on GB/T 150.4 and on GB/T 33488 radiographic and ultrasonic examination. It was issued on 6 February 2018 and has applied since 1 September 2018.
Found what you need?
Document preview — GB/T 35974.4-2018
National Standard of the People's Republic of China
- ICS
- 71.120
- Classification
- G 94
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Foreword3
- 1 Scope4
- 2 Normative References4
- 3 Fabrication4
- 4 Technical Requirements10
- 5 Inspection11
- 6 Exit-factory Requirements14
1 Scope
This Part of GB/T 35974 specifies the fabrication, technical requirements, testing and exit-factory requirements of plastic pressure vessels.
2 Normative References
The following documents are indispensable to the application of this Standard. In terms of references with a specified date, only versions with a specified date are applicable to this Standard. In terms of references without a specified date, the latest version (including all the modifications) is applicable to this Standard.
GB/T 150.4 Pressure Vessels - Part 4: Fabrication, Inspection and Testing, and Acceptance
GB/T 33488.3 Test Method of Pressure Equipment of Thermoplastics Welded for Chemicals - Part 3: Radiographic Examination
GB/T 33488.4 Test Method of Pressure Equipment of Thermoplastics Welded for Chemicals - Part 4: Ultrasonic Examination
GB/T 35974.2 Plastics and Plastic Lining Pressure Vessels - Part 2: Materials
GB/T 35974.3 Plastics and Plastic Lining Pressure Vessels - Part 3: Design
HG/T 4280 Welding Procedure Qualification for Plastics
HG/T 4281 Welding Procedure Specification for Plastics
JB/T 4711 Coating and Packing for Pressure Vessels Transport
3 Fabrication
3.1 General Requirements
3.1.1 Plastics vessels shall be fabricated in accordance with the processing procedure stipulated in this Part.
3.2.2 Acceptance check
3.2.2.1 Items
Acceptance check items of materials are: quality certificate, appearance, dimensions and performance indexes.
3.2.2.2 Quality certificate
Materials shall have an exit-factory quality certificate. Items and indexes in the quality certificate shall comply with the stipulations in GB/T 35974.2.
3.2.2.3 Appearance
Materials' appearance shall receive full inspection. The indexes shall comply with the stipulations in GB/T 35974.2.
3.2.2.4 Dimensions
Materials' main dimensions shall receive 100% inspection. The indexes shall comply with the stipulations in GB/T 35974.2.
3.2.2.5 Performance indexes
Main materials' performance indexes shall comply with the stipulations in GB/T 35974.2.
3.2.3 Material re-inspection
3.2.3.1 Under one of the following circumstances, materials' performance indexes shall be re-inspected in accordance with GB/T 35974.2 and design requirements:
a) When there are doubts about the performance indexes in the quality certificate;
b) When re-inspection is requested in design documents.
3.2.3.2 Material re-inspection shall receive sampling inspection of the performance indexes. The sampling range shall cover every exit-factory batch of the materials.
Sampling inspection items shall at least include the content in Table 2. Materials shall be qualified in all the inspection items, then, they may be used in the fabrication of plastics vessels. […]
3.3.2.1.3 Cooling
Cool down the mold that is already heated. During the cooling process, the mold shall maintain the rotatory state. One of the following cooling modes, or a combination of several cooling modes may be adopted for cooling: natural cooling, water mist cooling or water spray cooling. During the cooling process, the difference between the air temperature in the mold and the external surface temperature of the mold is requested not to exceed 40 °C. When the external surface temperature of the shell decreases to 50 °C ~ 80 °C, stop the rotation of the shell.
3.3.2.1.4 Demolding and post-processing
After the cooling is completed, disassemble the plastics vessel. Adopt vibration method to eliminate the internal stress of the plastics vessel.
3.3.2.2 Procedure evaluation
Procedure evaluation shall at least include the items listed in Table 1. The various item indexes shall comply with the designed value and the stipulations in GB/T 35974.2.
3.3.3 Extrusion
3.3.3.1 Methods
3.3.3.1.1 Plasticization
Extrusion plasticization shall adopt the following methods:
a) Dry extrusion: through in-cylinder heating and heat generation by mechanical screw's rotary shearing, plastics that enter the extruder's cylinder would reach the plastics melt temperature. In accordance with the differences of materials, determine corresponding procedure parameters, such as plasticization temperature and shear torque force.
b) Wet extrusion: adopt an organic solvent to soften and dissolve plastics. In accordance with the solvent's technical parameters, determine procedure parameters, such as the matching ratio and plasticization time.
3.3.3.1.2 Molding
In accordance with plastics vessel's shape and dimensions, design a molding mold.
Under mechanical pressure, plasticized plastics enter the mold, fill up the mold cavity.
3.3.3.1.3 Cooling
Adopt the following methods for cooling, so that after cooling, the plastics vessel would reach relatively stable structure and dimensions:
a) Dry extrusion: adopt one of the following cooling modes, or a combination of several cooling modes: natural cooling, water mist cooling or water spray cooling;
b) Wet extrusion: adopt cooling modes like natural curing and heating curing.
3.3.3.1.4 Demolding and post-processing
When plastics vessel's structure and dimensions become relatively stable in the mold, disassemble the mold; take out the plastics vessel. In addition, cut off or remove redundant edges.
3.3.3.2 Procedure evaluation
Procedure evaluation shall at least include the items listed in Table 1. The various item indexes shall comply with the designed value and the stipulations in GB/T 35974.2.
3.3.4 Extrusion winding
3.3.4.1 Methods
Extrusion winding molding shall be conducted in accordance with the following three procedures:
a) Cylinder's extrusion winding molding: select the specifications of mold; determine the number of winding layers and the length of cylinder. After the cooling, demold it; make the head flat. It is requested that there shall be no gap among the layers. The minimum wall thickness shall be not less than the nominal thickness.
b) Bottom cover (head) installation: hemispherical, ellipsoidal and conical head may adopt integral injection molding or plate thermo-compression molding. In the thermo-compression of the head flap plate and top plate butt joint, welded joints are merely allowed to be in radial and circumferential direction. In accordance with the drawings, properly handle the grooves of the cylinder's joints; adopt extrusion welding equipment for welding.
c) Accessory installation: in the welding of connecting pipe's Flange and cylinder body, in accordance with the size of the connecting pipe, select an appropriate welding mode. Flange bolt holes shall be symmetrically distributed on both sides of the cylinder's axis and in mid-span distribution. When there are any special requirements, they shall be indicated in the drawings.
5 Inspection
5.2.4 Determination
5.2.4.1 Determination of exit-factory inspection
When the result of exit-factory inspection complies with the requirements, products shall be determined as qualified. If products fail to comply with one or more requirements, they shall be determined as disqualified. Disqualified products may be returned for re-fabrication. One re-fabrication is allowed on welded joints. Two re-fabrications are allowed on other parts. After the re-fabrication, products shall be re-inspected. If products are still disqualified in the re-inspection, they shall be determined as disqualified. If there is re-fabrication, the time, the parts and the situation of the re-fabrication shall be recorded in the quality certificate.
5.2.4.2 Determination of type inspection
When the result of type inspection complies with the requirements stipulated in Table 5, products shall be determined as qualified in type inspection. If products fail to comply with one or more requirements, they shall be determined as disqualified in type inspection.
6 Exit-factory Requirements
6.1 Exit-factory Information
6.1.1 Fabrication organizations shall provide exit-factory information to vessels' purchaser. When there are special requirements towards the usage of vessels, they shall also provide an instruction manual.
6.1.2 Exit-factory information shall at least include the following content:
a) Vessels' original design drawings and general completion drawings;
b) Vessels' documentary quality certificates (including product certificate, product data sheet and quality certificate);
c) Vessels' characteristics (including design pressure, maximum allowable operating pressure, test pressure, design temperature and operating medium);
d) Vessels' instruction manual.
6.2 Vessel Nameplate
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 150.4Pressure vessels - Part 4: Fabrication, inspection and testing, and acceptance
- GB/T 33488.3Test method of pressure equipments of thermoplastics welded for chemicals—Part 3: Radiographic examination
- GB/T 33488.4Test method of pressure equipments of thermoplastics welded for chemicals—Part 4:Ultrasonic examination
- GB/T 35974.2Plastics and plastic lining pressure vessels—Part 2: Material
- GB/T 35974.3Plastics and plastic lining pressure vessels—Part 3:Design
- HG/T 4280Welding procedure qualification for plastics
Similar standards
How to Download GB/T 35974.4-2018
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 150.4-2024 — Pressure vessels - Part 4: Fabrication, inspection and testing, and acceptance
GB/T 33488.3-2017 — Test method of pressure equipments of thermoplastics welded for chemicals—Part 3: Radiographic examination
GB/T 33488.4-2017 — Test method of pressure equipments of thermoplastics welded for chemicals—Part 4:Ultrasonic examination