GB/T 32077-2025Wind energy generation systems — Pitch system of wind turbines (English PDF)

风能发电系统 风力发电机组变桨距系统

Open the GB/T 32077-2025 preview as PDF

Preview — first pages of GB/T 32077-2025 (full document: 28 pages)

This is a limited preview

Buy now to download the full PDF (28 pages)

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

April 25, 2025

Implementation date

November 1, 2025

Scope

GB/T 32077-2025 is the English-translated version of 风能发电系统 风力发电机组变桨距系统.

GB/T 32077-2025 is the Chinese national standard covering the system that turns the blades of a wind turbine and feathers them when everything else has failed — the electric or hydraulic drive, the backup power source and its self-check, the grid fault ride-through and the power-on safety function, the positioning and following error, the speed, acceleration and braking capability measured on a loading rig, the lightning protection, and the installation and maintenance. It replaces GB/T 32077-2015, under the China Machinery Industry Federation. In force from 1 November 2025. Issued on 25 April 2025, it has been in force since 1 November 2025, replacing GB/T 32077-2015.

Document preview — GB/T 32077-2025

National Standard of the People's Republic of China

ICS
27.180
Classification
F 11
Replacing
GB/T 32077-2015

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • PrefaceIII
  • 1 Scope1
  • 2 Normative references1
  • 3 Terms and Definitions2
  • 4 Working conditions4
  • 4.1 General working conditions4
  • 4.2 Special conditions4
  • 4.3 Other conditions4
  • 5 Technical requirements5
  • 5.1 General requirements5
  • 5.2 Functional Requirements6
  • 5.3 Performance requirements8
  • 5.4 Requirements for main components10
  • 6 Test methods12
  • 6.1 Test conditions12
  • 6.2 Functional test13
  • 6.3 Performance test16
  • 6.4 Main component test20
  • 7 Inspection Rules21
  • 7.1 Types of product inspection21
  • 7.2 Type inspection21
  • 7.3 Factory Inspection22
  • 8 Deliverables Requirements2222
  • 8.1 Marking, labelling and instructions for use22
  • 8.2 Packaging, transportation and storage23
  • 9 Installation and Maintenance23
  • 9.1 Installation23
  • 9.2 Maintenance23

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1: Structure and drafting rules for standardization documents" Drafting.

This document replaces GB/T 32077-2015 "Wind turbine pitch control system".

In addition to structural adjustments and editorial changes, the main technical changes are as follows.

a) Deleted "three-blade wind wheel" from the scope (see Chapter 1 of the 2015 edition);

b) Added the terms "multi-drive pitch system", "safety position" and "pitch system following error" (see Chapter 3);

c) The terms "pitch angle operating range", "independent pitch control", "unified pitch control", "normal feathering" and "emergency feathering" have been deleted.

“Hydraulic rotary joint”, “Conductive slip ring”, “Redundancy technology” (see Chapter 3 of the 2015 edition);

d) The general working conditions have been changed (see Chapter 4, Chapter 4 of the 2015 edition);

e) Added the requirements for "speed capability", "acceleration capability" and "braking capability" (see 5.1.1);

f) Added "backup power self-check function" (see 5.2.4);

g) Added "grid fault ride-through function" (see 5.2.5);

h) Added "monitoring and maintenance functions" (see 5.2.6);

i) Added "Stop function" (see 5.2.7);

j) Added "power-on safety function" (see 5.2.8);

k) The noise standard of hydraulic system has been changed (see 5.3.3.6, 5.4.3.6 of the 2015 edition);

l) The cleanliness level of hydraulic oil has been changed (see 5.3.3.7, 4.1.3 of the 2015 edition);

m) Added "Lightning protection requirements" (see 5.3.5);

n) Changed the requirements for "backup power source" (see 5.4.1, 5.7 of the 2015 edition);

o) Deleted the requirements of “battery voltage is too low” and “battery temperature is too low” (6.2.3.8 and 6.2.3.9 of the 2015 edition);

p) Added “reserve power source self-check test” (see 6.2.4);

q) Added “grid fault ride-through test” (see 6.2.5);

r) Added "Stop function test" (see 6.2.7);

s) Added "power-on safety function test" (see 6.2.8);

t) Added "step response test", "pitch system positioning error test", "pitch system following error test", "speed capability test" Test”, “acceleration capability test”, “brake performance test” (see 6.3);

u) The contents of the electromagnetic compatibility test have been changed (see 6.3.1, 6.3.6 of the 2015 edition);

v) Changed the schematic diagram of the electric variable pitch loading test platform and the schematic diagram of the hydraulic variable pitch loading test platform (see 6.3.3.3, 2015 6.3.4.3 of the 2015 edition);

w) Added "main component test" (see 6.4);

x) The inspection items have been changed (see Table 6, Table 6 of the 2015 edition);

y) Added “Installation and Maintenance” (see Chapter 9).

Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents.

This document was proposed by the China Machinery Industry Federation.

This document is under the jurisdiction of the National Technical Committee for Standardization of Wind Power Generation (SAC/TC50).

This document was drafted by: Shanghai Electric Wind Power Group Co., Ltd., Goldwind Science & Technology Co., Ltd., Jiangsu Coastal Renewable Energy Technology Innovation Center, Yunda Energy Technology Group Co., Ltd., Mingyang Smart Energy Group Co., Ltd., CRRC Zhuzhou Electric Locomotive Research Co., Ltd. Wind Power Division, CRRC Shandong Wind Power Co., Ltd., CSSC Offshore Wind Power Co., Ltd., Hunan Xinglan Wind Power Co., Ltd., Ess Beijing Beifeng Wind Power Technology (Qingdao) Co., Ltd., Qingdao Pangu Intelligent Manufacturing Co., Ltd., Sinovel Wind Power Technology (Group) Co., Ltd., China China Three Gorges Corporation, Shanghai Electric Power Industry Co., Ltd., Three Gorges New Energy Offshore Wind Power Operation and Maintenance Jiangsu Co., Ltd., Yancheng Quality Quality Technical Supervision Comprehensive Inspection and Testing Center, Beijing Jianheng Certification Center Co., Ltd., China Quality Certification Center Co., Ltd., Sungrow Power Supply Co., Ltd.

Co., Ltd., Shanghai Electric Group Power Transmission and Distribution Equipment Co., Ltd., Shanghai Electric Power Electronics Co., Ltd., Guoneng Xinkong Interconnection Technology (Hebei Beijing) Co., Ltd., Tianjin Ruiyuan Electric Co., Ltd.

The main drafters of this document are: Xu Yiqing, Xun Zhengxuan, Zheng Jirong, Liu Weiguo, Jia Huiwen, Zhan Shaohui, Chen Sifan, Wang Lijuan, Yu Yong, Wang Wei, Yang Wei, Huang Zheng, Wang Dawei, Han Kun, Chu Zhongxiang, Xu Kai, Feng Nan, Zhang Zhiwei, Wang Hui, Sun Tongjin, Sun Guang, Zhou Xinliang, Yuan Ying, Cao Wenbin, Chen Guodong, Zhao Jinliang, Yu Kang, and Wang Shuai.

The previous versions of this document and the documents it replaces are as follows.

— First published in 2015 as GB/T 32077-2015;

— This is the first revision.

Wind power generation system Wind turbine variable pitch system

1 Scope

This document specifies the working conditions, technical requirements, test conditions and performance of the variable pitch system of a grid-connected wind turbine generator set (hereinafter referred to as the variable pitch system).

Methods, inspection rules, deliverable requirements, and installation and maintenance.

This document is applicable to the variable pitch system of grid-connected horizontal axis wind turbines. The variable pitch drive mode is hydraulic drive or electric drive. drive.

2 Normative references

GB/T 191

GB/T 1029

GB/T 1032

GB/T 1311

GB/T 2422

GB/T 2423.1-2008

GB/T 2423.2-2008

GB/T 2423.3-2016

GB/T 2423.4-2008

GB/T 2900.1

GB/T 2900.53

GB/T 3222.2

GB/T 3480

GB/T 3482-2008

GB/T 3766

GB/T 4208

GB/T 4365

GB/T 5226.1

GB/T 6388

GB/T 7251.1-2023

GB/T 7935

GB/T 9969

GB/T 11287-2000

GB/T 12113

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 28 pages — is available in the English PDF.

Referenced standards

Editions of GB/T 32077

EditionTitleRevisionStatus
GB/T 32077-2025Wind energy generation systems - Pitch system of wind turbinescurrent editionCurrent
GB/T 32077-2015Wind turbine generator system -- Pitch systemprevious editionIn force

This page sells the current edition, GB/T 32077-2025. Earlier editions are listed for reference only.

How to Buy GB/T 32077-2025

  1. 1Add to cart. Click the "Buy GB/T 32077-2025" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
28 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 32077-2025

$500.00

$425.00for partners