GB/T 30163-2023Specifications of top combustion stove with high blast temperature for blast furnace (English PDF)

高炉用高风温顶燃式热风炉节能技术规范

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for GB/T 30163-2023 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

November 27, 2023

Implementation date

June 1, 2024

Scope

GB/T 30163-2023 is the English-translated version of 高炉用高风温顶燃式热风炉节能技术规范.

GB/T 30163-2023 is the Chinese technical specification for high blast temperature top-fired hot blast stoves on ironmaking blast furnaces, for the design, installation and commissioning of stoves on new, extended or rebuilt furnaces.

It sets out the principle and process flow, then the technical requirements: the calorific value of the blast furnace gas, the refractory bricks for the burner, the materials for the regenerator and the furnace shell and their weld points, the use of flue gas waste heat to preheat pulverised coal, the grate support system, emission limits for nitrogen oxides and sulfur dioxide, and furnace shell surface temperatures part by part, with monitoring at the dome and hot blast outlet.

It also covers testing, the operating regime and energy-saving evaluation. It replaces GB/T 30163-2013, was issued on 27 November 2023 and has applied since 1 June 2024.

Found what you need?

Document preview — GB/T 30163-2023

National Standard of the People's Republic of China

ICS
77.010
Classification
H 04
Replacing
GB/T 30163-2013

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Foreword
  • 1 Scope
  • 2 Normative reference documents
  • 3 Terms and definitions

Foreword

This document complies with the provisions of GB/T 1.1-2020 "Standardization Work Guidelines Part 1: Structure and Drafting Rules of Standardization Documents" Drafting.

This document replaces GB/T 30163-2013 "Technical Specifications for Energy Saving of High Wind Temperature Top-Fired Hot Blast Stoves for Blast Furnaces" and is consistent with GB/T 30163- Compared with 2013, in addition to structural adjustments and editorial changes, the main technical changes are as follows:

a) Changes in terms and definitions (see Chapter 3, Chapter 3 of the 2013 edition);

b) Added top-fired hot blast stove flow chart (see Figure 1 and Figure 2);

c) The basic requirements for top-fired hot blast stoves have been changed (see 5.1, 5.1 in the 2013 edition);

d) The calorific value of blast furnace gas has been changed (see Table 2, Table 2 of the 2013 version);

e) Added requirements for refractory bricks for top-fired hot blast stove burners (see 5.4);

f) The requirements for top-fired hot blast furnace regenerator materials, furnace shell materials and material welding points have been changed (see 5.5, 2013 version of 5.5);

g) Added requirements for top-fired hot blast stove flue gas waste heat to be used for pulverized coal preheating (see 5.6);

h) The requirements for the grate support system have been changed (see 5.7.2, 2013 version of 5.7.2);

i) Added emission requirements for pollutants such as nitrogen oxides and sulfur dioxide in the flue gas of top-fired hot blast stoves, and the requirements for the hot blast stove vault and hot blast outlet Requirements for furnace shell surface temperature detection in equal high temperature zones (see 5.8);

j) The furnace shell temperature requirements for different parts have been changed (see Table 9, Table 9 of the 2013 version);

k) Deleted the calculation of bulk thermal efficiency (see 6.4 of the 2013 edition);

l) The operating system and requirements for top-fired hot blast stoves have been changed (see Table 10, Table 10 of the 2013 version);

m) Added requirements for energy saving evaluation of top-fired hot blast stoves (see 8.1 and 8.2).

1 Scope

This document stipulates the principles and processes, technical requirements, tests, operating systems and energy-saving evaluation of high-temperature top-fired hot blast stoves for blast furnaces.

This document is applicable to high-temperature top-fired hot-blast stoves (referred to as top-fired hot-blast stoves) used in newly built, expanded or renovated blast furnaces for iron-making blast furnaces in iron and steel enterprises. Furnace) design, installation and commissioning, etc.

2 Normative reference documents

The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, the dated quotations For undated referenced documents, only the version corresponding to that date applies to this document; for undated referenced documents, the latest version (including all amendments) applies to this document.

GB/T 699 High-quality carbon structural steel

GB/T 700 carbon structural steel

GB/T 713 Steel plates for boilers and pressure vessels

GB/T 1047 Definition and selection of nominal dimensions of piping components

GB/T 1591 Low alloy high strength structural steel

GB/T 3077 alloy structural steel

GB/T 26480 Inspection and testing of valves

GB/T 32287 Determination and calculation method of heat balance of blast furnace hot blast furnace

GB 50427 Design specifications for blast furnace ironmaking engineering

YB/T 4232 Refractory balls for ball hot blast stoves

YB/T 4436 Technical specifications for top-fired hot blast furnace ovens

YB/T 4638 Technical specifications for refractory materials for top-fired hot blast stoves

YB/T 4639 Andalusite bricks for hot blast stoves

YB/T 5012 Shape and dimensions of refractory bricks for blast furnaces and hot blast furnaces

3 Terms and definitions

The following terms and definitions apply to this document.

3.1 Top-fired hot blast stove

A hot blast furnace with a burner located at the top of the furnace body and above the regenerator.

3.2 Thermal efficiency of hot blast stove body

The effective heat obtained by the hot air at the hot air outlet accounts for the percentage of heat supplied to the hot air furnace body.

Note: The unit is in %.

3.3 Specific surface area of regenerator

The ratio of heat exchange area to volume of the regenerator.

Note: The unit is square meters per cubic meter (m2/m3).

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Similar standards

Editions of GB/T 30163

EditionTitleRevisionStatus
GB/T 30163-2023Specifications of top combustion stove with high blast temperature for blast furnacecurrent editionCurrent
GB/T 30163-2013Specifications of top combustion stove with high blast temperature for blast furnaceprevious editionSuperseded

This page sells the current edition, GB/T 30163-2023. Earlier editions are listed for reference only.

How to Download GB/T 30163-2023

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 30163-2023

$245.00