Scope
GB/T 32975-2026 is the English-translated version of 干熄焦节能技术规范.
GB/T 32975-2026 is the Chinese national standard covering dry quenching of coke - cooling red-hot coke with circulating inert gas instead of water, which recovers the heat as steam and avoids the emissions of wet quenching. It fixes the process and equipment requirements, the energy recovery and consumption indicators and the assessment. It replaces GB/T 32975-2016 and takes effect on 1 December 2026. It was issued on 25 May 2026 and takes effect on 1 December 2026, replacing GB/T 32975-2016. The document is under the responsibility of the China Iron and Steel Association. This page is published from the official record of the 2026 edition; the clause text of a standard this recent is not yet in circulation, and the figures, limits and tables it contains are those of the document itself, delivered in full with the English translation.
Document preview — GB/T 32975-2026
National Standard of the People's Republic of China
- ICS
- 77-010
- Classification
- H 04
- Replacing
- GB/T 32975-2016
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- 4 Principles and Processes
- 5 Technical Requirements
- 5.1 General Provisions
- 5.2 Red Coke Conveying System
- 5.3 Dry Quenching Furnace and Gas Circulation System
- 5.4 Cold coke discharge and transport system
- 5.5 Dry Quenching Coke Boiler and Thermal System
- 7 Experimental and Calculation Methods
Foreword
This document complies with the provisions of GB/T 1.1-2020 "Standardization Work Guidelines Part
1.Structure and Drafting Rules of Standardization Documents". Drafting. This document replaces GB/T 32975-2016 "Technical Specification for Energy Saving in Dry Quenching Coke". Compared with GB/T 32975-2016, the main differences are in the structural adjustments. Aside from editorial changes, the main technical changes are as follows:
a) The terminology and definition for dry quenching have been removed (see section
3.1 of the.2016 edition);
b) The terms and definitions for dry quenching gas-to-fuel ratio, dry quenching boiler, and circulating gas have been revised (see 3.3, 3.5, 3.6, and
3.4 in the.2016 edition). 3.6, 3.7);
c) The dry quenching principle and process flow have been modified (see Chapter 4; see Chapter 4 for the.2016 version);
d) The energy conservation requirements and institutional requirements for newly constructed dry quenching coke projects have been deleted (see sections 5.1.1, 5.1.3, and
5.1.4 of the.2016 version);
e) The document requirements for the construction of dry quenching coke projects have been revised (see 5.1.11,
5.1.10 in the.2016 version);
f) Added requirements for refractory bricks in dry quenching furnaces and for safety and environmental protection requirements in dry quenching coke (see 5.1.12, 5.1.13);
g) The requirements for the red coke conveying system have been revised (see 5.2.1, 5.2.2, 5.2.9; and 5.2.1, 5.2.2,
5.2.9 in the.2016 version);
4 Principles and Processes
4.1 Principle Dry quenching refers to a quenching method that uses circulating gas to cool red-hot coke. The coke moves downwards within the dry quenching furnace, and the circulating gas flows towards... In the upward flow, the coke is cooled by exchanging heat with the circulating gas. The high-temperature circulating gas, after heat exchange, transfers heat to the dry quenching process after dust removal. In a coke oven, the cooled circulating gas is recirculated back into the dry quenching furnace by a circulating fan for reuse.
4.2 Process Flow The dry quenching process mainly includes the coke process, the gas circulation process, and the steam-water process for the dry quenching boiler, as follows:
a) Coke production process. Red coke exiting the coke oven -> Coke can -> Coke can elevator -> Charging device -> Dry quenching -> Coke discharge device -> Cold coke transportation system;
b) Gas circulation process. Circulating gas -> Dry quenching furnace -> Primary dust collector -> Dry quenching coke boiler -> Secondary dust collector -> Circulating fan -> Feed gas Water preheating unit -> returned to dry quenching furnace for recycling;
c) Steam-water flow process for dry quenching coke boiler. System makeup water -> Demineralized water tank -> Deaerator feed water pump -> Feed water preheating device -> Deaerator -> Boiler Feedwater pump -> Dry quenching coke boiler -> Steam output. The process flow diagram is shown in Figure 1.
5.1 General Provisions
5.1.1 Dry quenching equipment should not use high-energy-consuming equipment that is explicitly eliminated by the state or restricted by the industry.
5.1.2 For cooling red-hot coal, a completely dry extinguishing method should be adopted.
5.1.3 The scale of the dry quenching unit should match the coke oven production capacity.
5.1.4 The dry quenching coke body should preferably adopt a ring-shaped planar arrangement.
5.1.5 The dry quenching body should be arranged compactly to reduce the height and width of the frame.
5.1.6 Steam generated during dry quenching should be recycled.
5.1.7 A centralized control system should be installed for dry quenching.
5.1.8 The temperature of cold coke discharge should be less than.200°C.
5.1.9 The reuse rate of cooling water in the dry quenching unit should be no less than 97%.
5.1.10 The construction of dry quenching coke projects shall comply with the provisions of GB 50432, GB 50390, GB 51363, DL5190.2, and YB/T 6093.
5.1.11 The insulation and heat preservation of dry quenching equipment and pipelines shall comply with the provisions of GB 50264 and GB 50126.
5.1.12 The properties of refractory bricks in all parts of the dry quenching furnace shall comply with the requirements of YB/T 4447.
5.1.13 Safety measures for dry quenching and technical indicators for pollutant emissions shall comply with relevant national regulations.
5.2 Red Coke Conveying System
5.2.1 One electric locomotive should tow two coke tank cars, or one self-propelled coke tank car should tow one non-self-propelled coke tank car.
5.2.2 Round rotary coke cans are recommended for transporting red coke, and coke cans lined with energy-saving and environmentally friendly refractory materials are preferred.
5.2.3 The effective volume of the coke pot is
1.2 times the coke production capacity of a single hole of the coke oven.
5.2.4 A heat-insulating layer should be sealed between the lining plate of the coke tank and the tank frame.
5.2.5 The storage time of red coke in the coke container should not exceed 30 minutes.
5.2.6 Coke can elevators should be equipped with coke can covers with heat insulation layers.
5.2.7 A feeder should be installed inside the red coke loading device.
5.2.8 The inner lining of the furnace cover of the red coke charging device should be heat resistant to no less than 1250°C.
5.2.9 Electric locomotives, self-propelled coke tank cars, coke tank rotating devices, electric cylinders for loading devices, and hoists should use frequency conversion speed regulation for lifting and traveling.
5.2.10 The coke pot elevator shall adopt a variable frequency control system with energy feedback function.
5.3 Dry Quenching Furnace and Gas Circulation System
5.3.1 A water seal should be installed at the furnace opening of the dry quenching furnace, and the water seal should preferably be a self-circulating type.
5.3.2 The amount of coke stored in the pre-storage chamber of the dry quenching furnace should be no less than the amount of coke quenched during the maximum coke supply interval of the coke oven.
5.3.3 The pressure in the pre-storage chamber of the dry quenching furnace should be controlled between -100Pa and 100Pa.
5.3.4 The normal material level in the dry quenching furnace should be monitored using a radar level gauge.
5.3.5 The circulating gas velocity in the inclined section of the dry quenching furnace should not exceed 4 m/s (under standard conditions).
5.3.6 The height-to-diameter ratio of the cooling chamber of the dry quenching furnace should be 0.7~0.9.
5.3.7 At least four temperature measuring points should be set along the circumference of the upper and lower sections of the cooling chamber of the dry quenching furnace.
5.3.8 The thermal shock stability and high-temperature flexural strength of the refractory bricks at the furnace mouth of the dry quenching furnace pre-storage chamber shall meet the requirements of the pre-storage chamber.
5.3.9 The thermal shock stability, high-temperature flexural strength and abrasion resistance of refractory bricks in the inclined zone of the dry quenching furnace shall meet the requirements of the inclined zone.
5.3.10 The wear resistance and compressive strength of the refractory bricks in the cooling chamber of the dry quenching furnace shall meet the requirements of the cooling chamber.
5.3.11 The circulating gas inlet of the dry quenching furnace shall be equipped with an air volume regulating device with an adjustable distribution ratio for circulating gas.
5.3.12 The inlet circulating gas velocity of a primary dust collector using gravity settling dust removal technology should not exceed 3 m/s (under standard conditions).
5.3.13 The lining of the high-temperature compensator between the primary dust collector and the dry quenching furnace or dry quenching coke boiler should preferably be made of brick.
5.3.14 The dome of the primary dust collector should be made of mullite bricks.
5.4 Cold coke discharge and transport system
5.4.1 The cold coke discharge device shall adopt a combination of electric gate, vibrating feeder and rotary sealing valve.
5.4.2 Rotary sealing valves should have good sealing performance and wear resistance.
5.4.3 The coke temperature monitoring and automatic water spray cooling device shall be installed on the dry quenching coke cold coke conveyor belt.
5.4.4 Fixed CO alarms and fixed O2 alarms shall be installed at the bottom cold coke discharge device of the dry quenching furnace and the underground belt conveyor corridor.
5.5 Dry Quenching Coke Boiler and Thermal System
5.5.1 Dry quenching boilers should preferably be high temperature and high pressure or higher parameters with natural circulation dry quenching.
5.5.2 The low-pressure steam generated by the continuous blowdown expansion tank of the dry quenching coke boiler is used for deaeration in the deaerator.
5.5.3 The design, construction and operation of boilers and thermal systems shall comply with the provisions of current national standards and specifications.
5.5.4 The deaerator should be equipped with a waste steam recovery device.
5.5.5 The cooling system of the sampling device should preferably adopt a closed-loop circulation, and its high-temperature sampling section should be cooled with demineralized water.
5.5.6 A recovery device should be installed for the continuous wastewater discharged from the boiler.
6.Operational Technical Indicators The technical specifications for dry quenching operation should meet the requirements of Table 1.
7 Experimental and Calculation Methods
7.1 The temperature of coke after dry quenching shall be determined in accordance with YB/T 4706.
7.2 The circulating gas temperature at the inlet of the dry quenching furnace, the circulating gas temperature at the inlet of the dry quenching coke boiler, and the circulating gas temperature at the outlet of the dry quenching coke boiler are calculated according to... The determination shall be carried out in accordance with YB/T 4918.
7.3 The gas-to-fuel ratio for dry quenching coke is calculated according to formula (1).
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 17 pages — is available in the English PDF.
Editions of GB/T 32975
| Edition | Title | Revision | Status |
|---|---|---|---|
| GB/T 32975-2026 | Technical specification for energy saving in coke dry quenching | current edition | Current |
| GB/T 32975-2016 | Technical specification for energy saving in coke dry quenching | previous edition | In force until 1 December 2026 |
This page sells the current edition, GB/T 32975-2026. Earlier editions are listed for reference only.
How to Buy GB/T 32975-2026
- 1Add to cart. Click the "Buy GB/T 32975-2026" button on this page. You can add more standards before checkout.
- 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
- 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 47310-2026 — Determination of total silicon, aluminium, iron, potassium, sodium, calcium, magnesium, manganese, phosphorus, titanium and sulfur in soil - Monochromatic excitation energy dispersive X-ray fluorescence spectrometry
GB/T 47321-2026 — Specification for the warning data exchange of the national emergency early warning dissemination system
GB/T 47293-2026 — Determination of available mercury in soil
Secure payment via Stripe
Payments accepted
GB/T 32975-2026
$155.00