GB/T 22389-2008Guidelines of metal oxide surge arresters without gaps for HVDC converter stations (English PDF)
高压直流换流站无间隙金属氧化物避雷器导则
GB/T 22389 | Evolution and historical versions
| Std ID | Title | Status |
|---|---|---|
| GB/T 22389-2023 | Metal-oxide surge arresters without gaps for HVDC converter stations | Valid |
| GB/T 22389-2008 | Guidelines of metal oxide surge arresters without gaps for HVDC converter stations | Obsolete |
GB/T 22389-2008 is obsolete. It has been replaced by GB/T 22389-2023. This page sells the obsolete edition, for projects and contracts that still cite it.
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for GB/T 22389-2008 in 30 minutes.
Issued by
General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China; Standardization Administration of China
Level / Type
National · Recommended
Issue date
September 24, 2008
Implementation date
August 1, 2009
Scope
GB/T 22389-2008 is the English-translated version of 高压直流换流站无间隙金属氧化物避雷器导则.
GB/T 22389-2008 is the Chinese national standard "Guidelines of metal oxide surge arresters without gaps for HVDC converter stations".
It was issued on September 24, 2008 by the General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China and the Standardization Administration of China, and took effect on August 1, 2009. It is obsolete: it has been replaced by GB/T 22389-2023.
Found what you need?
Document preview — GB/T 22389-2008
National Standard of the People's Republic of China
Issued by: General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China; Standardization Administration of China
Contents
- Document data
1 Document data
Sector: National standard (Recommended).
Issuing body: General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China; Standardization Administration of China.
Date of issue: 2008-09-24.
Date of implementation: 2009-08-01.
Status: obsolete, replaced by GB/T 22389-2023.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
Referenced standards
Cited by
- GB/T 311.11-2025Insulation co-ordination - Part 11: Definitions, principles and rules for HVDC system
- GB/T 311.12-2025Insulation co-ordination - Part 12: Application guidelines for LCC HVDC converter stations
- GB/T 45648.1-2025Controllable self-restoring energy dissipation devices - Part 1: DC side
- GB/T 42558.1-2023Seismic techniques of electrical equipment in converter station on plateau—Part 1:Directives for seismic test and evaluation
- GB/T 36498-2018Guidelines for insulation co-ordination of flexible DC converter station
- GB/T 37015.2-2018Performance of high-voltage direct current power transmission system using voltage sourced converters (VSC-HVDC)—Part 2: Transient-state
How to Download GB/T 22389-2008
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 10003-2026 — Biaxially oriented polypropylene (BOPP) film
GB/T 10004-2026 — Plastic/Plastic laminated films and pouches for packaging
GB/T 10007-2026 — Rigid cellular plastics - Determination of shear properties
Secure payment via Stripe
Payments accepted
GB/T 22389-2008
$1,235.00