Valid

GB/T 16508.4-2022Shell boilers—Part 4: Fabrication, inspection and acceptance (English PDF)

锅壳锅炉 第4部分:制造、检验与验收

Preview PDF

This is a limited preview

Buy now to download the full PDF (67 pages)

Need quotation for your management?

Get a formal quotation for GB/T 16508.4-2022 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

March 9, 2022

Implementation date

October 1, 2022

Scope

GB/T 16508.4-2022 is the English-translated version of 锅壳锅炉 第4部分:制造、检验与验收.

GB/T 16508.4-2022 is the part of the Chinese shell boiler series that covers fabrication, inspection and acceptance.

It sets the basic requirements for the fabrication process, the marking of material, cutting and straightening, hot and cold forming, the making and assembly of the main parts, expansion joints, welding, heat treatment, inspection and testing, coating and packing, the nameplate and the documents that leave the works with the boiler.

It applies to the fabrication, inspection and acceptance of the shell boilers defined in GB/T 16508.1. Boiler works, buyers and inspection bodies use it. It replaces GB/T 16508.4-2013, was issued on 9 March 2022 and has applied since 1 October 2022.

Found what you need?

Document preview — GB/T 16508.4-2022

National Standard of the People's Republic of China

ICS
27.060.30
Classification
J 98
Replacing
GB/T 16508.4-2013

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Foreword3
  • Introduction6
  • 1 Scope8
  • 2 Normative references8
  • 3 Terms, definitions and symbols9
  • 4 Basic requirements10
  • 5 Marking10
  • 6 Material cutting and straightening11
  • 7 Hot and cold forming11
  • 8 Fabrication and assembly of main parts19
  • 9 Expansion joints28
  • 10 Welding36
  • 11 Heat treatment40
  • 12 Inspection and testing46
  • 13 Coating and packaging56
  • 14 Nameplate and exit-factory data57
  • Annex A (normative) Boiler welded tube holes59
  • Annex B (normative) Technical requirements for the fabrication of H-shaped wing (fin) tubes62
  • Bibliography67

1 Scope

This document specifies the basic requirements for shell boilers in the fabrication process, marking, material cutting and straightening, hot and cold forming, fabrication and assembly of main parts, expansion joints, welding, heat treatment, inspection and testing, coating and packaging, nameplates and the requirements for the exit-factory data.

This document is applicable to the fabrication, inspection and acceptance of shell boilers defined in GB/T 16508.1.

2 Normative references

The following referenced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies.

GB/T 1804, General tolerances - Tolerances for linear dimensions without individual tolerance indications

GB/T 2652, Destructive tests on welds in metallic materials - Longitudinal tensile test on weld metal in fusion welded joints

GB/T 2900.48, Electrotechnical terminology of boilers

GB/T 3375, Welding terminology

GB/T 4863, General terminology of machine-building technology

GB/T 16507.5, Water-tube boilers - Part 5: Fabrication

GB/T 16507.6, Water-tube boilers - Part 6: Inspection, testing and acceptance

GB/T 16508.1, Shell boilers - Part 1: General requirements

GB/T 16508.2, Shell boilers - Part 2: Materials

GB/T 16508.3, Shell boilers - Part 3: Design and strength calculation

GB/T 30583, Specification for post weld heat treatment of pressure equipment

JB/T 3223, Welding consumables quality management procedures

3 Terms, definitions and symbols

For the purposes of this document, the terms and definitions defined in GB/T 2900.48,

GB/T 3375, GB/T 4863 and GB/T 16508.1 as well as the followings apply.

3.1 Cold forming

Plastic deformation processing that is performed below the recrystallization temperature of the workpiece metal.

3.2 Hot forming

Plastic deformation processing that is performed above the recrystallization temperature of the workpiece metal.

3.3 Tube forming

Processing process of tube bending, upsetting, necking, flaring, etc.

4 Basic requirements

4.1 Raw materials for boilers shall meet the requirements of GB/T 16508.2 and design drawings.

4.2 The structural design and strength calculation of boiler pressure elements shall meet the requirements of GB/T 16508.3.

4.3 The design and fabrication process documents shall conform to the production conditions of the organization.

5 Marking

5.1 General

5.1.1 Boiler manufacturers shall formulate guidance documents for the use of material marks for pressure elements and main load-bearing members, welder marks in the fabrication process, non-destructive testing marks, product part identification numbers, and inspection status marks.

5.2 Marking method

5.2.1 Marking shall adopt the following methods or a combination of the following methods.

5.2.2 Steel stamps shall not be used in the following situations.

5.2.3 When the method of 5.2.1~5.2.2 cannot be used for marking, the positioning map can be used instead of marking.

6 Material cutting and straightening

6.1 Select the material splitting method according to the steel properties and specifications. The cutting method used shall ensure the processing size and roughness requirements. It shall also reduce or prevent deformation caused by cutting.

6.2 During thermal cutting, the processing part can be preheated according to the type and thickness of the steel.

6.3 If the deformation exceeds the allowable range after cutting, appropriate methods shall be used to correct it.

7 Hot and cold forming

7.1 General requirements

7.1.1 When cold forming is used, the cold brittleness of the steel used shall be considered.

7.1.2 When hot forming is used, the temper brittle temperature zone of the steel shall be avoided.

7.2 Corrugated forming of boiler shell and cylindrical shell section, tube plate (head), U-shaped foot ring and flue 7.2.1 The continuous forming process shall be adopted for hot forming or cold forming of circular tube plates, heads, U-shaped foot rings and furnace corrugations.

7.2.2 Tube plates, heads and U-shaped foot rings shall be pressed and formed from a single piece of steel plate.

7.2.3 The appearance quality after forming shall meet the following requirements.

7.2.4 The actual thickness of the pressure element after forming shall not be less than the minimum required thickness required by the design. Special parts are according to the following requirements.

7.2.5 The deviation of the inner diameter of the circular tube plate, the head and the outer ring of the U-shaped bottom ring shall meet the requirements of Table 1.

7.2.10 The inner diameter (di) deviation of the flue hole of the circular tube plate (see

Figure 2a), Figure 2c) and Figure 2d), and the inner diameter (di) deviation of the inner ring of the U-shaped bottom ring (see Figure 3) shall not exceed the ones specified in

7.3 Tube forming, threaded pipe thread pressing and pipe end necking

7.3.1 Tube forming shall comply with the provisions of GB/T 16507.5.

7.3.2 After the tube is rolled and threaded, there shall be no defects such as cracks and wrinkles on the surface. The shape deviation, size deviation and surface roughness of the threaded smoke tube shall meet the requirements of the design documents.

8 Fabrication and assembly of main parts

8.1 Boiler shell, flue, header

8.1.1 The cylindrical shell section butt joints of the shell, flue, the butt joint of the cylinder body and the tube plate (head), and the butt joint of the header meet the following requirements.

8.1.2 The straightness of the boiler shell and flue per meter length shall not be greater than 1.5 mm. The full-length straightness shall comply with the relevant provisions of

GB/T 16507.5.The total length deviation of the boiler shell is. The length deviation and full-length straightness of the header shall comply with the relevant provisions of GB/T 16507.5.

8.2 Serpentine tubes, membrane wall tube panels, wing (fin) tubes, etc.

8.2.1 The fabrication of serpentine tubes and membrane wall tube panels shall be carried out in accordance with the relevant requirements of GB/T 16507.5.

8.2.2 The fabrication of high-frequency resistance welding spiral wing (fin) tubes shall be carried out in accordance with the relevant requirements of NB/T 47030.

8.3 Braces

8.3.1 Braces (including straight tie rods, diagonal tie rods, stay tubes, stay plates) shall not be spliced.

8.3.2 The dimensional deviation of the braces shall meet the requirements of the design documents.

8.6 Steel structure

The fabrication and inspection of boiler steel structure shall meet the requirements of NB/T 47043.

8.7 Assembly of pressure elements

8.7.1 The assembly of tube joints on the boiler shell and header shall meet the following requirements.

8.8.5 Individual protrusions with a height exceeding 1 mm on the surface of the pressure element shall be ground.

8.8.6 The cracks and gaps caused by the quality of the steel plate not meeting the requirements and over-burning shall not be repaired by welding.

8.8.7 Surface grinding and welding repair shall meet the following requirements.

9 Expansion joints

9.1 General requirements

9.1.1 The calculated temperature at the expansion joint shall not exceed 400°C.

9.2 Expansion joint tube hole

9.2.1 The expansion joint tube holes shall not be opened on the spliced weld of the tube plate or the longitudinal weld of the boiler shell (drum). When the expansion joint tube hole must be opened on the circumferential weld, it shall be handled according to 11.4.6 b).

9.3 Expansion joint tubes

9.3.1 There shall be no defects such as heavy skin, cracks, longitudinal grooves, and pressure deviation on the surface of the expansion joint tube. The depth of defects such as transverse grooves and pits at the expansion joint shall not be greater than 10% of the nominal wall thickness of the tube.

9.3.2 The material of the expansion joint tube shall be selected with a hardness lower than that of the boiler shell (drum).

9.4 Selection of tube expander

9.4.1 The initial minimum diameter of the tube expander shall be less than the minimum internal diameter of the tube. Make sure that the tube expander fits smoothly into the tube hole.

9.5.2 The ambient temperature during expansion shall be higher than 0°C.

9.5.3 A test expansion shall be carried out before formal expansion, so as to determine a reasonable expansion rate.

9.6 Calculation methods for tube expansion rate

9.6.1 Inner diameter control method

When inner diameter control is used, the tube expansion rate shall generally be controlled within the range of 1%~2.1%. The tube expansion rate can be calculated according to the formula (1).

9.8 Sticking expansion requirements

9.8.1 The expansion rate for sticking expansion shall be controlled at 0.1%~0.5% (inner diameter control method). The maximum shall not be greater than 0.7%.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 67 pages — is available in the English PDF.

Referenced standards

Similar standards

Editions of GB/T 16508.4

EditionTitleRevisionStatus
GB/T 16508.4-2022Shell boilers—Part 4: Fabrication, inspection and acceptancecurrent editionCurrent
GB/T 16508.4-2013Shell boilers—Part 4: Fabrication, inspection and acceptanceprevious editionSuperseded

This page sells the current edition, GB/T 16508.4-2022. Earlier editions are listed for reference only.

How to Download GB/T 16508.4-2022

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
67 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 16508.4-2022

$545.00