DL 5009.1-2014Code of safety operation in power engineering construction. Part 1: Steam power (English PDF)
电力建设安全工作规程 第1部分:火力发电
This is a limited preview
Buy now to download the full PDF (186 pages)
Need quotation for your management?
Get a formal quotation for DL 5009.1-2014 in 30 minutes.
Issued by
National Energy Administration
Level / Type
National · Mandatory
Issue date
October 15, 2014
Implementation date
March 1, 2015
Scope
DL 5009.1-2014 is the English-translated version of 电力建设安全工作规程 第1部分:火力发电.
DL 5009.1-2014 — This standard specifies the safety requirements of thermal power construction project implementation process should be performed.
Found what you need?
Document preview — DL 5009.1-2014
National Standard of the People's Republic of China
- ICS
- 27.010
- Classification
- F 09
- Replacing
- DL 5009.1-2002
Issued by: National Energy Administration
Contents
- What this standard covers1
- Document data2
- Standards quoted by this document3
What this standard covers
This standard specifies the safety requirements of thermal power construction project implementation process should be performed. This section applies to new construction, expansion and renovation of thermal power construction projects (including the conv
Document data
International classification (ICS): 27.010.
Chinese classification (CCS): F09.
Estimated length of the Chinese original: 282,212 words.
Supersedes the earlier edition DL 5009.1-2002.
Standards quoted by this document
GB 311.1; GB/T 700; GB 1102; GB/T 1591; GB/T 2550; GB 2894; GB/T 3608; GB 4053; GB 4387; GB 5082; GB 5144; GB/T 5972; GB 6067.1; GB 6722; GB 7144; GB 7674; GB 8918; GB 8978; GB/T 10051; GB/T 11651; GB 12523; GB/T 13861; GB/T 14405; GB/T 14406; GB 15831; G
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 186 pages — is available in the English PDF.
Referenced standards
Cited by
- JB/T 13736-2019Tubular flue gas heat exchangers - Technical specification for installation
- NB/T 20391-2016PWR nuclear power plant steel containment vessel assembly, installation and acceptance specification
- NB/T 25043.5-2016Technical specification for construction of nuclear power conventional island and balance of plant - Part 5: Water treatment and hydrogen generation systems
- NB/T 25043.6-2016Technical specification for construction of nuclear power conventional island and balance of plant - Part 6: Piping
- NB/T 25043.8-2016Specification for erection of nuclear power conventional island and balance of plant - Part 8: Thermal insulation and painting
- JB/T 11836-2015Flue gas cleaning equipment for hazardous solid waste incineration - Specification for operation and maintenance
How to Download DL 5009.1-2014
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL 5190.2-2019 — Technical specification for thermal power erection and construction. Part 2: Boiler unit
DL 5190.3-2019 — Technical specification for thermal power erection and construction. Part 3: Steam turbine generator unit
DL 5190.4-2019 — Technical specification for thermal power erection and construction - Part 4: Instrumentation and control
Secure payment via Stripe
Payments accepted
DL 5009.1-2014
$3,275.00