DL 5190.3-2019Technical specification for thermal power erection and construction. Part 3: Steam turbine generator unit (English PDF)
电力建设施工技术规范 第3部分:汽轮发电机组
This is a limited preview
Buy now to download the full PDF (165 pages)
Need quotation for your management?
Get a formal quotation for DL 5190.3-2019 in 30 minutes.
Issued by
National Energy Administration
Level / Type
National · Mandatory
Issue date
June 4, 2019
Implementation date
October 1, 2019
Scope
DL 5190.3-2019 is the English-translated version of 电力建设施工技术规范 第3部分:汽轮发电机组.
DL 5190.3-2019 — 1.0.1 In order to strengthen the construction technology management of the steam turbine generator unit project and further improve the construction quality of the project, this section is revised.
1.0.2 This Part is applicable to the implementation of steam turbine generator sets, gas-steam combined cycle generator sets, and single cycle gas generator sets in thermal power plants. work.
1.0.3 The construction of the steam turbine generator set should be based on the approved design and the technical documents of the equipment manufacturer. If modification or change is required, the design unit, the equipment manufacturer shall issue the corresponding certification documents and go through the relevant approval procedures.
Civil engineering shall comply with DL/T 5190.1 "Power Construction Construction in addition to the provisions of "Technical Specifications Part 1: Civil Engineering", this part shall be implemented.
1.0.4 The construction of the steam turbine generator set shall be carried out in accordance with the equipment order contract, technical agreement and the effective technical documents of the manufacturer, such as contracts, agreements and system If there is no requirement in the manufacturer's technical documents, it shall be implemented in accordance with the provisions of this section.
1.0.5 The construction of steam turbine generator sets shall not only comply with the provisions of this section, but shall also comply with the current relevant national standards. DL/T 5190.3-2019
Found what you need?
Document preview — DL 5190.3-2019
National Standard of the People's Republic of China
- ICS
- 27.100
- Classification
- P 61
- Replacing
- DL 5190.3-2012
Issued by: National Energy Administration
Contents
- What this standard covers1
- Document data2
- Standards quoted by this document3
What this standard covers
This standard applies to the construction of steam turbine generator sets, gas-steam combined cycle generator sets, and single-cycle gas generator sets in thermal power plants.
Document data
International classification (ICS): 27.100.
Chinese classification (CCS): P61.
Estimated length of the Chinese original: 249,272 words.
Supersedes the earlier edition DL 5190.3-2012.
Standards quoted by this document
GB 50184; GB 50204; GB 50205; GB 50973; GB/T 242; GB/T 246; GB 4053; GB/T 5574; GB/T 7597; GB/T 9129; GB/T 10567.2; GB 11120; GB/T 12145; GB/T 14405; GB/T 20627; DL 5009.1; DL 5027; DL 5190.1; DL 5190.5; DL/T 5204; DL/T 5434; DL/T 297; DL/T 438; DL/T 439
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 165 pages — is available in the English PDF.
How to Download DL 5190.3-2019
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL 5190.2-2019 — Technical specification for thermal power erection and construction. Part 2: Boiler unit
DL 5190.4-2019 — Technical specification for thermal power erection and construction - Part 4: Instrumentation and control
DL 5190.5-2019 — Technical specification for thermal power erection and construction. Part 5: Piping and system
Secure payment via Stripe
Payments accepted
DL 5190.3-2019
$2,900.00