Valid

DL 5190.2-2019Technical specification for thermal power erection and construction. Part 2: Boiler unit (English PDF)

电力建设施工技术规范 第2部分:锅炉机组

Preview PDF

This is a limited preview

Buy now to download the full PDF (126 pages)

Need quotation for your management?

Get a formal quotation for DL 5190.2-2019 in 30 minutes.

Issued by

National Energy Administration

Level / Type

National · Mandatory

Issue date

June 4, 2019

Implementation date

October 1, 2019

Scope

DL 5190.2-2019 is the English-translated version of 电力建设施工技术规范 第2部分:锅炉机组.

DL 5190.2-2019 — 1.0.1 In order to further improve the installation and construction level of power station boilers, promote technological progress, adapt to scientific development, and ensure safe production and engineering quality, specially prepared this part.

1.0.2 This section applies to the construction of power station boiler units with a rated steam pressure of 9.8MPa and above.

1.0.3 The construction of domestic waste incineration boilers and gas-steam combined cycle power station waste heat boilers should be carried out in accordance with Appendix A and Appendix B. 1.0.4 The construction of imported units shall be carried out in accordance with the provisions of the contract.

If there is no clear provision in the contract, this section shall be carried out. 1.0.5 In addition to the installation of power station boiler units, it shall comply with this part, as well as the regulations of the current relevant national and industry standards. DL/T 5190.2-2019

Found what you need?

Document preview — DL 5190.2-2019

National Standard of the People's Republic of China

ICS
27.100
Classification
P 61
Replacing
DL 5190.2-2012

Issued by: National Energy Administration

Contents

  • What this standard covers1
  • Document data2
  • Standards quoted by this document3

What this standard covers

This standard is applicable to the construction of power station boiler units with a rated steam pressure of 9.8MPa and above. The construction of domestic waste incineration boilers and gas-steam combined cycle power station waste heat boilers shall be implemented in accordance with Appendix A and Appendix B of this standard. The construction of imported units shall be carried out in accordance with the provisions of the contract. If there is no clear provision in the contract, this standard shall be implemented.

Document data

International classification (ICS): 27.100.

Chinese classification (CCS): P61.

Estimated length of the Chinese original: 190,165 words.

Supersedes the earlier edition DL 5190.2-2012.

Standards quoted by this document

GB/T 50448; GB 5749; GB 50026; GB 50204; GB 50205; GB 50278; GB 12523; GB/T 3007; GB/T 22395; GB/T 23294; DL 5190.3; DL 5190.5; DL 5190.8; DL/T 5437; DL/T 241; DL/T 438; DL/T 678; DL/T 794; DL/T 855; DL/T 869; DL/T 889; DL/T 1269; YB/T 5202

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 126 pages — is available in the English PDF.

Referenced standards

How to Download DL 5190.2-2019

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
126 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

DL 5190.2-2019

$2,000.00