SY/T 5587.9-2021Routine workover operation regulations - Part 9: Wellhead replacement (English PDF)
常规修井作业规程 第9部分:换井口装置
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for SY/T 5587.9-2021 in 30 minutes.
Issued by
National Energy Administration
Level / Type
National · Recommended
Issue date
November 16, 2021
Implementation date
February 16, 2022
Scope
SY/T 5587.9-2021 is the English-translated version of 常规修井作业规程 第9部分:换井口装置.
SY/T 5587.9-2021 is the Chinese industry standard "Routine workover operation regulations - Part 9: Wellhead replacement". It was issued on November 16, 2021 by the National Energy Administration, and took effect on February 16, 2022. It is in force and replaces SY/T 5587.9-2007.
Found what you need?
Document preview — SY/T 5587.9-2021
National Standard of the People's Republic of China
Issued by: National Energy Administration
Contents
- Document data
1 Document data
Sector: Petroleum & Gas (industry standard).
Issuing body: National Energy Administration.
Date of issue: 2021-11-16.
Date of implementation: 2022-02-16.
Status: valid, replaces SY/T 5587.9-2007.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
Referenced standards
Editions of SY/T 5587.9
| Edition | Title | Revision | Status |
|---|---|---|---|
| SY/T 5587.9-2021 | Routine workover operation regulations - Part 9: Wellhead replacement | — | Valid |
| SY/T 5587.9-2007 | Codes for conventional workover job. Part 9: Procedure of wellhead for replacing operating | — | Obsolete |
| SY/T 5587.9-1993 | Conventional oil wells, workover operations. In other wellhead equipment operating procedures | — | Obsolete |
This page sells the current edition, SY/T 5587.9-2021. Earlier editions are listed for reference only.
How to Download SY/T 5587.9-2021
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
SY/T 5587.10-2024 — Conventional well repair procedures - Part 10: Hydraulic sandblasting perforation
SY/T 5587.8-1993 — Conventional oil wells, workover operations. Looking string, string closure, post-mortem string operation rules
SY/T 5587.10-2012 — Code for conventional workover job. Part 10: Hydroblasting perforation
SY/T 5587.9-2021
$274.00