SY/T 5587.10-2024Conventional well repair procedures - Part 10: Hydraulic sandblasting perforation (English PDF)
常规修井作业规程 第10部分:水力喷砂射孔
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for SY/T 5587.10-2024 in 30 minutes.
Issued by
National Energy Administration
Level / Type
National · Recommended
Issue date
December 25, 2024
Implementation date
June 25, 2025
Scope
SY/T 5587.10-2024 is the English-translated version of 常规修井作业规程 第10部分:水力喷砂射孔.
SY/T 5587.10-2024 is the Chinese industry standard "Conventional well repair procedures - Part 10: Hydraulic sandblasting perforation". It was issued on December 25, 2024 by the National Energy Administration, and took effect on June 25, 2025. It is in force and replaces SY/T 5587.10-2012.
Found what you need?
Document preview — SY/T 5587.10-2024
National Standard of the People's Republic of China
Issued by: National Energy Administration
Contents
- Document data
1 Document data
Sector: Petroleum & Gas (industry standard).
Issuing body: National Energy Administration.
Date of issue: 2024-12-25.
Date of implementation: 2025-06-25.
Status: valid, replaces SY/T 5587.10-2012.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
Editions of SY/T 5587.10
| Edition | Title | Revision | Status |
|---|---|---|---|
| SY/T 5587.10-2024 | Conventional well repair procedures - Part 10: Hydraulic sandblasting perforation | — | Valid |
| SY/T 5587.10-2012 | Code for conventional workover job. Part 10: Hydroblasting perforation | — | Obsolete |
| SY/T 5587.10-1993 | Conventional oil wells, workover operations. Hydrajet perforating operation rules | — | Obsolete |
This page sells the current edition, SY/T 5587.10-2024. Earlier editions are listed for reference only.
How to Download SY/T 5587.10-2024
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
SY/T 5587.11-2016 — Codes for conventional workover job. Part 11-Milling operation of packer and bridge plug
SY/T 5587.9-1993 — Conventional oil wells, workover operations. In other wellhead equipment operating procedures
SY/T 5587.11-2004 — Codes for conventional workover job. Part 11: Milling operation of packer and bridge plug
SY/T 5587.10-2024
$404.00