Valid

GB/T 45972-2025Technical requirements for complete sets of production equipment for concrete slabs of prefabricated buildings (English PDF)

装配式建筑用混凝土板材生产成套装备技术要求

Open the GB/T 45972-2025 preview as PDF

Preview — first pages of GB/T 45972-2025 (full document: 15 pages)

This is a limited preview

Buy now to download the full PDF (15 pages)

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

August 1, 2025

Implementation date

February 1, 2026

Scope

GB/T 45972-2025 is the English-translated version of 装配式建筑用混凝土板材生产成套装备技术要求.

GB/T 45972-2025 is the Chinese national standard covering the production line that casts precast wall and floor panels — the classification and what a complete set has to contain, the pallet system and the moulding system, the curing and the demoulding, the circulation that moves the pallets from station to station and sets the throughput, the electrical and control system, the safety provisions, and the installation, commissioning and trial production before acceptance. First edition, under the China Building Materials Federation. In force from 1 February 2026. Issued on 1 August 2025, it has been in force since 1 February 2026.

Document preview — GB/T 45972-2025

National Standard of the People's Republic of China

ICS
91.110
Classification
Q 92

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • PrefaceIII
  • 1 Scope1
  • 2 Normative references1
  • 3 Terms and Definitions2
  • 4 Classification and composition2
  • 4.1 Classification2
  • 4.2 Composition2
  • 5 Technical Requirements3
  • 5.1 Basic Requirements3
  • 5.2 Performance of complete equipment3
  • 5.3 Modular system4
  • 5.4 Molding System4
  • 5.5 Maintenance system5
  • 5.6 Demolding system5
  • 5.7 Circulation System6
  • 5.8 Electrical and control systems6
  • 6 Safety and Environmental Protection7
  • 7 Installation, commissioning and trial production7
  • 7.1 Installation7
  • 7.2 Debugging7
  • 7.3 Trial Production8
  • 8 Performance Testing8
  • 9 Delivery of documents8
  • Appendix A (Normative) Trial Production Conditions for Complete Equipment10
  • Appendix B (Normative) Performance Test Methods for Complete Equipment11

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1: Structure and drafting rules for standardization documents" Drafting.

Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents.

This document is proposed by China Building Materials Federation.

This document is under the jurisdiction of the National Technical Committee for Standardization of Building Materials and Equipment (SAC/TC465).

This document was drafted by: Sany Construction Technology Co., Ltd., Hunan Sany Kuaerju Housing Industry Co., Ltd., Shandong Tianyi Machinery Co., Ltd., China Building Materials Machinery Industry Association, Sany Construction Technology (Miluo) Co., Ltd., Shenyang Jianzhu University, Hebei Xindadi Electromechanical Manufacturing Co., Ltd., China Railway Eighth Bureau Group Construction Engineering Co., Ltd., Jikezhu Technology (Taicang) Co., Ltd., Hebei Xuelong Machinery Manufacturing Co., Ltd.

Company, Hunan University, Dezhou Haitian Mechanical and Electrical Technology Co., Ltd., Chengdu Construction Engineering No. 9 Construction Engineering Co., Ltd., China Construction Science and Engineering Group Co., Ltd.

Company, China Railway 24th Bureau Group Bridge Construction Co., Ltd., Guangdong Zhongbo Construction Engineering Co., Ltd., Anhui Tongjian Construction Group Co., Ltd., Guangdong City Third Municipal Engineering Co., Ltd., China Railway Fourth Engineering Group Fourth Engineering Co., Ltd., China Construction Southwest Design and Research Institute Co., Ltd., Fujian Jianyan Industrialized Construction Co., Ltd., China Construction Strait Construction Development Co., Ltd., China Railway 22nd Bureau Group Rail Engineering Co., Ltd., Xinjiang Bingtuan Urban Construction Group Co., Ltd., China Railway 24th Bureau Group Anhui Engineering Co., Ltd., Jiangxi Ji'an Construction and Installation Engineering Corporation, China Construction Eighth Engineering Bureau Co., Ltd., China Construction Third Engineering Bureau Group Co., Ltd., Shanghai Construction Changzhou Jianya Building Components Products Co., Ltd., China Railway 16th Bureau Group Railway Engineering Co., Ltd., Guangxi Liancheng Construction Group Co., Ltd., China Gezhouba Group Third Engineering Co., Ltd., Sichuan Provincial Fourth Construction Co., Ltd., China Railway Construction Group Co., Ltd., China Railway 17th Bureau Group Construction Engineering Co., Ltd., Jiangsu Jinmao Construction Group Co., Ltd., Sichuan Jingtai Construction Group Co., Ltd., Xinjiang North Construction Group Co., Ltd., China 22nd Metallurgical Group Co., Ltd., Jiangsu Zhufang Construction Group Co., Ltd., Dingkui Construction Group Co., Ltd., Kashgar Xinlong Construction (Group) Co., Ltd., Huizhou Hydropower Construction CONSTRUCTION ENGINEERING LIMITED.

The main drafters of this document are: Cai Yang, Zhou Dongmei, Tang Xiuguo, Cheng Weihua, Wang Yumin, Chen Changqing, Chen Depeng, Feng Ling, Zou Defang, Li Yonglong, Liu Hongbin, Huang Bo, Li Dong, Bai Xiaojun, Liu Yi, Hu Xiaoguang, Hu Zhiwei, Xie Xianghua, Liu Yifeng, Deng Lu, Pei Juanmiao, Zhang Qike, Chen Qirong, Wang Peng, Yu Haibin, Wang Yaning, Yang Hao, Zhang Jiaku, Liu Haoran, Pang Qiusheng, Liu Ying, Wu Minghua, Chen Maoqiao, Wang Xiaohuang, Chen Jiacheng, Wang Yao, Zheng Hong, Feng Weikai, Wang Xinnian, Yang Zhi, Zhou Zhichun, Zhang Yong, Xu Qiang, Wang Yu, Li Jie, Yao Xiaodong, Chen Menghua, Mao Huigang, Zhou Yong, Luo Zhongyu, Zhang Xiaogang, Li Zhouming, Hu Jun, Zhu Zongpu, Li Jun, Yan Shiqiang, He Xi, Xue Xinhu, Chen Zhanrui, Cai Zhongjie, Chen Can, Liu Jixiong, Shi Dongxing, Cao Ran, Tu Minjie, Cui Ao, Huang Mo, Zhao Xiangxiang, Peng Huichun, Huang Zhigang, Ma Li, Li Zhifeng, Li Yunze, Long Moushi, and Yu Weifang.

Production of concrete slabs for prefabricated buildings Technical requirements for complete sets of equipment

1 Scope

This document specifies the classification, composition, technical requirements and requirements of complete sets of equipment for the production of concrete slabs for prefabricated buildings (hereinafter referred to as complete sets of equipment).

Requirements, safety and environmental protection, installation, commissioning and trial production and delivery documents, describing the performance test.

This document applies to the design, manufacture and inspection of complete sets of equipment for the production of precast concrete wall panels and precast concrete floor panels for assembled buildings.

Other prefabricated building concrete slabs may be used for reference.

2 Normative references

GB/T 191

GB/T 1591-2018

GB 2893

GB 2894

GB/T 3797

GB 4053.1

GB 4053.2

GB 4053.3

GB/T 5226.1

GB/T 7932

GB/T 7935

GB/T 13306

GB/T 13384

GB/T 16754

GB/T 18831

GB/T 25295

GB/T 37393

GB/T 40399

GB/T 41502.1

GB/T 50087

GB 50171

GB 50231

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Editions of GB/T 45972

EditionTitleRevisionStatus
GB/T 45972-2025Technical requirements for complete sets of production equipment for concrete slabs of prefabricated buildingscurrent editionCurrent

This page sells the current edition, GB/T 45972-2025. Earlier editions are listed for reference only.

How to Buy GB/T 45972-2025

  1. 1Add to cart. Click the "Buy GB/T 45972-2025" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 45972-2025

$245.00

$210.00for partners