GB/T 40882-2021Forgings of main pipes for nuclear power plant of generation III—Technological specification (English PDF)

第三代核电站主管道锻件 工艺规范

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for GB/T 40882-2021 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

November 26, 2021

Implementation date

June 1, 2022

Scope

GB/T 40882-2021 is the English-translated version of 第三代核电站主管道锻件 工艺规范.

GB/T 40882-2021 is the Chinese national process specification for making the blank forgings of the main pipes used in third-generation nuclear power plants. It applies to austenitic stainless steel main pipe forgings with a main section size, covering pipe diameter and nozzle height, of 250 mm to 2000 mm and a length of 1500 mm to 10000 mm.

It sets out the forging process flow for the two structural forms, with and without nozzles, through pressing jaws, rounding, upsetting, drawing, blanking, nozzle pre-forming and final forming, together with the process preparation rules.

Normative annexes cover machining allowances and the heating of ingots and billets below and above a surface temperature of 550 °C. Forge shops and nuclear equipment makers use it to plan production. It was issued on 26 November 2021 and has applied since 1 June 2022.

Found what you need?

Document preview — GB/T 40882-2021

National Standard of the People's Republic of China

ICS
77.140.85
Classification
J 32

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Foreword
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions
  • 4 Process flow
  • 5 Process preparation specification
  • Appendix A (Normative) Margin Requirements
  • Appendix B (Normative) Heating specification for forging of steel ingots and billets with surface temperature less than 550°C
  • Appendix C (Normative) Billet heating specification with surface temperature not less than 550°C

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1: Structure and Drafting Rules of Standardization Documents" Drafting.

1 Scope

This document specifies the process flow and process compilation specifications for the third-generation nuclear power plant main pipe blank forgings (hereinafter referred to as "forgings").

This document is suitable for the main section size (including the diameter of the main pipe and the height of the nozzle) in the 250mm~2000mm, and the length size in the 1500mm~ 10000mm austenitic stainless steel forgings of the third-generation nuclear power plant main pipeline.

2 Normative references

The content of the following documents constitutes an indispensable clause of this document through normative references in the text. Among them, dated quotations Only the version corresponding to the date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to this document.

GB/T 8541 Forging terminology

GB 13318 General rules for forging production safety and environmental protection

3 Terms and definitions

The following terms and definitions defined in GB/T 8541 apply to this document.

3.1 Primary deformation heat

Deformation times of upsetting or stretching for the purpose of forging and compacting.

3.2 Blank dividing

Properly distribute the blanks to suit the process steps of the cross-sectional area and shape of the forging.

4 Process flow

According to the shape of the forging, it is divided into two structural forms with nozzle and without nozzle. The typical structure is shown in Figure 1. The forging process is as follows.

a) Forgings with nozzles. pressing jaws, spheronization, upsetting, drawing, blanking, pre-forming of nozzle materials, and final forging forming;

b) Forgings without nozzles. pressing jaws, rounding, upsetting, drawing, blanking, and final forging forming.

Note 1. Upsetting and drawing can be performed many times in the process flow of forgings with nozzles. The pressing jaws, rounding and upsetting steps in the process flow of forgings without nozzles can be based on actual conditions. Choose whether to implement the actual situation.

Note 2. The billet making steps in the process flow can be made into solid forging billets or hollow forging billets according to the different forging process methods adopted by various manufacturers.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download GB/T 40882-2021

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 40882-2021

$150.00