GB/T 40600-2021Technical requirements for dispatching function of wind farm power control system (English PDF)
风电场功率控制系统调度功能技术要求
This is a limited preview
Buy now to download the full PDF (17 pages)
Need quotation for your management?
Get a formal quotation for GB/T 40600-2021 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
October 11, 2021
Implementation date
May 1, 2022
Scope
GB/T 40600-2021 is the English-translated version of 风电场功率控制系统调度功能技术要求.
GB/T 40600-2021 sets technical requirements for the dispatching functions of a wind farm power control system, the system that directly controls wind turbines and reactive power compensation devices to perform automatic generation control, primary frequency control and reactive power and voltage control.
It covers basic requirements, configuration and communication information, the scheduling functions of the system, testing of those functions and performance indices.
Informative annexes give the control link, basic collected information, an example droop curve for primary frequency regulation and the calculation of active power, reactive power, voltage and primary frequency control performance indices.
It applies to new or expanded wind farms connected to the grid at 35 kV and above and can be used for system design, development and grid-connection function selection. It was issued on 11 October 2021 and has applied since 1 May 2022.
Found what you need?
Document preview — GB/T 40600-2021
National Standard of the People's Republic of China
- ICS
- 29.020
- Classification
- F 21
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Foreword
- 1 Scope
- 2 Normative references
- 3 Terms and definitions
- 4 General requirements
- 5 System scheduling function
- 6 Scheduling function test
- 7 Performance Index
- Appendix A (informative) Power control system control link
- Appendix B (Informative) Basic Collection Information Table
- Appendix C (informative) Example of droop curve of wind farm participating in primary frequency regulation of power grid
- Appendix D (informative) Wind farm active power, reactive power, voltage, and primary frequency modulation control performance index calculation method
- Reference
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1: Structure and Drafting Rules of Standardization Documents" Drafting.
1 Scope
This document specifies the basic requirements, configuration and communication information, main Function, test and performance index requirements.
This document is applicable to new or expanded wind farms connected to the grid through voltage levels of 35kV and above, and can be used for system design, development, and entry Network function selection, etc.
2 Normative references
The contents of the following documents constitute the indispensable clauses of this document through normative references in the text. Among them, dated quotations Only the version corresponding to that date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to this document.
GB/T 19582.1 Industrial Automation Network Specification Based on Modbus Protocol Part 1: Modbus Application Protocol
GB/T 19963 Technical Regulations for Connecting Wind Farms to Power Systems
GB/T 36050 Basic Regulations for Time Synchronization of Power System
GB/T 36572 Electric Power Monitoring System Network Security Protection Guidelines
DL/T 634.5101 Telecontrol Equipment and System Part 5-101.Supporting Standards for Basic Telecontrol Tasks of Transmission Protocol
DL/T 634.5104 Telecontrol equipment and system Part 5-104.Transmission protocol adopts IEC 60870- standard transmission protocol set 5-101 network access
3 Terms and definitions
The following terms and definitions apply to this document.
3.1 Wind farm automatic generation control
According to the real-time control commands (or preset target commands) of the power grid and the output characteristics of the wind turbines, the active power of the wind turbines is reasonably allocated to achieve The active power of the wind farm is automatically closed-loop control, so that the active power output of the wind farm can meet the control requirements of the power grid.
3.2 Wind farm primary frequency control
When the frequency of the power system deviates from the specified frequency modulation dead zone, the wind farm quickly and automatically adjusts the active power to respond to the change of the grid frequency and maintain Support the control function of stable grid frequency.
3.3 Wind farm power control system
Through direct control of wind turbines and reactive power compensation devices, automatic power generation control, primary frequency modulation control and reactive voltage of wind farms are realized Control and other functions of the system.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 17 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 19582.1Modbus industrial automation network specification -- Part 1: Modbus application protocol
- GB/T 36050Rules of time synchronization for power systems
- GB/T 36572Guidelines of cyber security protection for electric power system supervision and control
- DL/T 634.5101Telecontrol equipment and systems - Part 5-101: Supporting standards for transmission protocol basic telecontrol tasks
- DL/T 634.5104Telecontrol equipment and systems. part 5-104: Transmission protocols-Network access for IEC 60870-5-101 using standard transport profiles
GB/T 19963
Similar standards
How to Download GB/T 40600-2021
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL/T 634.5101-2022 — Telecontrol equipment and systems - Part 5-101: Supporting standards for transmission protocol basic telecontrol tasks
DL/T 634.5104-2009 — Telecontrol equipment and systems. part 5-104: Transmission protocols-Network access for IEC 60870-5-101 using standard transport profiles
GB/T 19582.1-2008 — Modbus industrial automation network specification -- Part 1: Modbus application protocol
Secure payment via Stripe
Payments accepted
GB/T 40600-2021
$300.00