Valid

GB/T 39559.2-2020Specifications for operational monitoring of urban rail transit facilities—Part 2: Bridge (English PDF)

城市轨道交通设施运营监测技术规范 第2部分:桥梁

Preview PDF

This is a limited preview

Buy now to download the full PDF (37 pages)

Need quotation for your management?

Get a formal quotation for GB/T 39559.2-2020 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

December 14, 2020

Implementation date

July 1, 2021

Scope

GB/T 39559.2-2020 is the English-translated version of 城市轨道交通设施运营监测技术规范 第2部分:桥梁.

GB/T 39559.2-2020 is the Chinese standard "Specifications for operational monitoring of urban rail transit facilities—Part 2: Bridge".

Its scope clause reads: This part of GB/T 39559 specifies the basic requirements, inspection, monitoring and status of urban rail transit bridge facilities operation monitoring technology Evaluation requirements and methods: This part is applicable to the operation inspection, monitoring and status evaluation of urban rail transit bridge facilities:. Its clauses include terms and definitions; basic requirements.

Found what you need?

Document preview — GB/T 39559.2-2020

National Standard of the People's Republic of China

ICS
03.220.30
Classification
P 51

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Foreword
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions
  • 4 Basic requirements
  • 5 Check
  • 5:1 Daily inspection
  • 5:2 Periodic inspection
  • 5:3 Special inspection
  • 6 Monitoring
  • 6:1 Settlement and deformation monitoring
  • 6:2 Safety monitoring
  • 7 Status evaluation
  • 7:1 Evaluation of technical status
  • 7:2 Structural safety evaluation
  • 7:3 Evaluation of driving impact
  • Appendix A (Informative Appendix) Daily Bridge Inspection Record
  • Appendix C (Informative Appendix) Bridge Periodic Inspection Record Form
  • Appendix D (Informative Appendix) Bridge Settlement and Deformation Monitoring Record Table
  • Appendix E (Normative Appendix) Evaluation indicators of various components and corresponding scale values
  • References

1 Scope

This part of GB/T 39559 specifies the basic requirements, inspection, monitoring and status of urban rail transit bridge facilities operation monitoring technology

Evaluation requirements and methods:

This part is applicable to the operation inspection, monitoring and status evaluation of urban rail transit bridge facilities:

2 Normative references

The following documents are indispensable for the application of this document: For dated reference documents, only the dated version applies to this article

Pieces: For undated references, the latest version (including all amendments) applies to this document:

GB/T 39559:1-2020 Technical Specification for Operation Monitoring of Urban Rail Transit Facilities Part 1: General Provisions

GB/T 50308 Urban Rail Transit Engineering Survey Specification

GB/T 51234 Code for Design of Urban Rail Transit Bridges

3 Terms and definitions

The following terms and definitions defined in GB/T 39559:1-2020 apply to this document:

3:1

Settlement anddeformationmonitoring

Continuously monitor the settlement of bridge piers and abutments, lateral horizontal displacement of pier tops and beam deformation under dead loads, and provide deformation analysis the behavior of:

3:2

Safetymonitoring

By installing a bridge structure safety monitoring system, real-time collection of load, environment and structure response information, analysis and processing behavior:

3:3

Technical status evaluation technicalstatusevaluation

Based on the results of bridge operation inspection and monitoring, the disease condition of the bridge is evaluated:

3:4

Evaluationofstructuresafety

Based on the bridge operation inspection and monitoring results and related data, through the check or test, the safety evaluation of the bridge structure is made:

3:5

Evaluationofimpactsontrainmoving

Based on the bridge operation inspection and monitoring results and related data, the evaluation of the degree of influence of the bridge structure on the train operation is made:

4 Basic requirements

4:1 The daily inspection, regular inspection and settlement and deformation monitoring of the bridge should fill in the record form, and the record form should be sorted out in time, and any problems should be raised

Treatment suggestions:

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 37 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download GB/T 39559.2-2020

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
37 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe