GB/T 39559.4-2020Specifications for operational monitoring of urban rail transit facilities—Part 4: Track and earthworks (English PDF)
城市轨道交通设施运营监测技术规范 第4部分:轨道和路基
This is a limited preview
Buy now to download the full PDF (34 pages)
Need quotation for your management?
Get a formal quotation for GB/T 39559.4-2020 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
December 14, 2020
Implementation date
July 1, 2021
Scope
GB/T 39559.4-2020 is the English-translated version of 城市轨道交通设施运营监测技术规范 第4部分:轨道和路基.
GB/T 39559.4-2020 is the Chinese standard "Specifications for operational monitoring of urban rail transit facilities—Part 4: Track and earthworks".
Its scope clause reads: This part of GB/T 39559 specifies the basic requirements, inspection, monitoring and status of urban rail transit track and subgrade operation monitoring technology: Requirements and methods of state evaluation: This part is applicable to the operation inspection, monitoring and status evaluation of urban rail transit tracks and subgrade facilities:. Its clauses include terms and definitions; basic requirements.
Found what you need?
Document preview — GB/T 39559.4-2020
National Standard of the People's Republic of China
- ICS
- 03.220.20
- Classification
- P 51
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- 1 Scope1
- 2 Normative references1
- 3 Terms and definitions1
- 4 Basic requirements1
- 5 track2
- 6 Roadbed9
- Appendix A (Informative Appendix) Track Inspection Results Record Form13
- Appendix B (Normative appendix) Track subitem status evaluation27
- Appendix C (Normative Appendix) Comprehensive evaluation of the overall state of the track30
- Appendix D (Normative Appendix) Judgment of Light and Severe Rail Injuries32
- Appendix E (Informative Appendix) Subgrade Inspection Results Record Form34
1 Scope
This part of GB/T 39559 specifies the basic requirements, inspection, monitoring and status of urban rail transit track and subgrade operation monitoring technology:
Requirements and methods of state evaluation:
This part is applicable to the operation inspection, monitoring and status evaluation of urban rail transit tracks and subgrade facilities:
2 Normative references
The following documents are indispensable for the application of this document: For dated reference documents, only the dated version applies to this article
Pieces: For undated references, the latest version (including all amendments) applies to this document:
GB/T 39559:1-2020 Technical Specification for Operation Monitoring of Urban Rail Transit Facilities Part 1: General Provisions
GB 50911 Technical Code for Urban Rail Transit Engineering Monitoring
CJJ/T 202 Technical Specification for Safety Protection of Urban Rail Transit Structure
3 Terms and definitions
The following terms and definitions defined in GB/T 39559:1-2020 apply to this document:
3:1
Track
The part of the line above the underground structure such as subgrade, bridge, tunnel, etc:, consists of steel rails and accessories, sleepers and
It consists of forks and rail expansion adjusters:
[TB10082-2017, Term 2:0:1]
3:2
Subgrade earthworks
A geostructure that directly supports the track structure formed by excavation and filling:
[TB10001-2016, Term 2:1:1]
4 Basic requirements
4:1 The daily inspection, regular inspection and special inspection of the track and subgrade should fill in the inspection record form, organize and analyze the inspection data, and propose the following
One-step work suggestion, special inspection should form inspection report:
4:2 Track and roadbed operation monitoring should establish a measurement reference network, and regularly retest:
4:3 The evaluation of the condition of the track and subgrade shall provide maintenance and repair suggestions:
4:4 After the initial operation, the operating unit should establish track and subgrade technical files in a timely manner, and the construction unit should transfer the track and subgrade to the operating unit:
Subgrade related survey, design, construction, inspection, monitoring, acceptance and other materials:
4:5 The track and subgrade operation inspection and monitoring data should be included in the technical files in a timely manner, and the track and subgrade life cycle database should be established to record
Record the life cycle information of the track and subgrade, carry out the analysis of the degradation law of the track and subgrade, failure prediction and health management:
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 34 pages — is available in the English PDF.
Referenced standards
Similar standards
How to Download GB/T 39559.4-2020
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 39559.1-2020 — Specifications for operational monitoring of urban rail transit facilities—Part 1: General
GB/T 39559.2-2020 — Specifications for operational monitoring of urban rail transit facilities—Part 2: Bridge
GB/T 39559.3-2020 — Specifications for operational monitoring of urban rail transit facilities—Part 3:Tunnel
Secure payment via Stripe
Payments accepted
GB/T 39559.4-2020
$515.00