GB/T 39139.2-2023Shale gas—Environmental protection—Part 2: Recommended practice for environmental protection of production operations (English PDF)
页岩气 环境保护 第2部分:生产作业环境保护推荐作法
This is a limited preview
Buy now to download the full PDF (17 pages)
Need quotation for your management?
Get a formal quotation for GB/T 39139.2-2023 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
May 23, 2023
Implementation date
September 1, 2023
Scope
GB/T 39139.2-2023 is the English-translated version of 页岩气 环境保护 第2部分:生产作业环境保护推荐作法.
GB/T 39139.2-2023 is Part 2 of GB/T 39139 and collects the recommended practices for protecting the environment through the whole run of onshore shale gas production.
Clause by clause it follows the work itself: geophysical prospecting, pre-drilling engineering, drilling, fracturing, building the gathering and transport system, gathering and transport production, and finally shutting a well in and leaving the site.
For each stage it puts forward ecological and environmental protection requirements meant to cut the environmental risk of shale gas development and prevent pollution.
It cites the pollution control standards for hazardous and general industrial solid waste, the farmland irrigation water quality standard, the radiation protection standard for industrial flaw detection and the drilling pollution prevention methods of GB/T 39139.1. It was issued on 23 May 2023 and has applied since 1 September 2023.
Found what you need?
Document preview — GB/T 39139.2-2023
National Standard of the People's Republic of China
- ICS
- 75.020
- Classification
- E 01
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Preface
- Introduction
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
- 4 General
- 5 Geophysical prospecting work
- 6 Pre-drilling works
- 7 Drilling operations
- 8 Fracturing operations
- 9 Gathering system construction
- 10 Gathering production
- 11 Well Shut-in and Exit
- Reference
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1: Structure and Drafting Rules for Standardization Documents" drafting.
This document is the second part of GB/T 39139 "Shale Gas Environmental Protection". GB/T 39139 has issued the following parts.
--- Part 1: Pollution prevention and disposal methods of drilling operations;
--- Part 2: Recommended practices for environmental protection of production operations.
Introduction
In order to implement the "Environmental Protection Law of the People's Republic of China" and the "Law of the People's Republic of China on the Prevention and Control of Environmental Pollution by Solid Waste" and other laws and regulations Standardize the technical requirements and management requirements for environmental protection of shale gas exploration and development, reduce environmental risks caused by shale gas development, and prevent shale gas environmental pollution during gas development, protect the ecological environment, and safeguard human health. Combined with the actual situation of shale gas development, formulate a shale gas environmental protection policy.
Protection series standards. GB/T 39139 aims to standardize environmental protection measures in the process of shale gas exploration and development, and is proposed to be composed of three parts.
--- Part 1: Drilling operation pollution prevention and disposal methods. The purpose is to specify the source control and process control of shale gas drilling operations. system, waste collection and treatment, and environmental protection requirements for well completion.
--- Part 2: Recommended practices for environmental protection of production operations. The purpose is to propose a holistic environment for the whole process of shale gas production operations. environmental protection requirements, put forward environmental protection requirements for geophysical prospecting, pre-drilling, drilling, fracturing, gathering and transportation, well closure and withdrawal involved in shale gas development. Nursing recommended practice.
--- Part 3: Recommended practices for well site land reclamation. The purpose is to propose land reclamation for the temporarily occupied land during construction after completion of the well. The technical and environmental requirements of the time.
1 Scope
This document provides information on geophysical prospecting operations, pre-drilling engineering, drilling operations, fracturing operations, construction of gathering and transportation systems, gathering Recommended practices for ecological and environmental protection in the whole process of production, well closure and withdrawal.
This document is applicable to the ecological and environmental protection management of onshore shale gas production operations.
2 Normative references
The contents of the following documents constitute the essential provisions of this document through normative references in the text. Among them, dated references For documents, only the version corresponding to the date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to this document.
GBZ 117 Radiation protection standard for industrial flaw detection
GB/T 5005 Specification for Drilling Fluid Materials
GB 5084 Farmland Irrigation Water Quality Standard
GB/T 17643 Geosynthetics polyethylene geomembrane
GB 18597 Hazardous Waste Storage Pollution Control Standard
GB 18599 Pollution Control Standards for General Industrial Solid Waste Storage and Landfill
GB/T 18920 Municipal Wastewater Recycling and Utilization Urban Miscellaneous Water Quality
GB/T 39139.1 Shale Gas Environmental Protection Part 1: Pollution Prevention and Disposal Methods for Drilling Operations
GB 50014 Design Standards for Outdoor Drainage
GB 50183 Code for Fire Protection in Oil and Gas Engineering Design
GB 50350 Oilfield oil and gas gathering and transportation design specification
HJ 25.2 Technical guidelines for soil pollution risk control and restoration monitoring of construction land
NB/T 14002.2 Shale Gas Reservoir Improvement Part 2: Technical Specifications for Industrialized Fracturing Operations
NB/T 14002.3 Shale Gas Reservoir Stimulation Part 3: Fracturing Flowback Fluid Recovery and Treatment Methods
SY/T 5466 Technical requirements for pre-drilling engineering and well site layout
SY/T 6596 Gas Field Water Injection Technical Requirements
SY/T 6646 Disposal Guidelines for Abandoned Wells and Long Shutdown Wells
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1 Shale gas production operation
The whole process production activities of shale gas adopting engineering technical measures.
Note: Including geophysical prospecting operations, pre-drilling engineering, drilling operations, fracturing operations, construction of gathering and transportation systems, gathering and transportation production, well closure and withdrawal, etc.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 17 pages — is available in the English PDF.
Referenced standards
Normative references
- GBZ 117Standard for radiological protection in industrial radiography
- GB/T 5005Specifications of drilling fluid materials
- GB 5084Standard for irrigation water quality
- GB/T 17643Geosynthetics - Polyethylene geomembrane
- GB 18597Standard for pollution control on hazardous waste storage
- GB 18599Standard for pollution control on the non-hazardous industrial solid waste storage and landfill
SY/T 5466
Similar standards
How to Download GB/T 39139.2-2023
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB 18597-2023 — Standard for pollution control on hazardous waste storage
GB 18599-2020 — Standard for pollution control on the non-hazardous industrial solid waste storage and landfill
GB 50014-2021 — Code for design of outdoor wastewater engineering
Secure payment via Stripe
Payments accepted
GB/T 39139.2-2023
$300.00