GB/T 39139.1-2020Shale gas—Environmental protection—Part 1: Pollution prevention and disposal methods for drilling operation (English PDF)
页岩气 环境保护 第1部分:钻井作业污染防治与处置方法
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for GB/T 39139.1-2020 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
October 11, 2020
Implementation date
May 1, 2021
Scope
GB/T 39139.1-2020 is the English-translated version of 页岩气 环境保护 第1部分:钻井作业污染防治与处置方法.
GB/T 39139.1-2020 is the Chinese standard "Shale gas—Environmental protection—Part 1: Pollution prevention and disposal methods for drilling operation".
Its scope clause reads: This part of GB/T 39139 specifies the source control, process control, waste collection and treatment, and completion environmental protection requirements for shale gas drilling operations.
This part is applicable to pollution prevention and disposal of onshore shale gas drilling operations. Its clauses include terms and definitions; source control.
Found what you need?
Document preview — GB/T 39139.1-2020
National Standard of the People's Republic of China
- ICS
- 75.020
- Classification
- E 12
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Foreword
- 1 Scope
- 2 Normative references
- 3 Terms and definitions
- 4 Source control
- 4.1 Pre-drilling works
- 4.2 Selection of drilling operation mode
- 4.3 Raw material selection
- 5 Process control
- 5.1 Installation and removal
- 5.2 Drilling operations
- 5.3 Logging
- 5.4 Cementing
- 5.5 Logging
- 5.6 Midway test
- 5.7 Other operating requirements
- 6 Waste collection and treatment
- 6.1 Collection and treatment of drilling waste fluid
- 6.2 Water-based drilling cuttings collection and treatment
- 6.3 Collection and treatment of oily drill cuttings
- 6.4 Industrial waste collection and treatment
- 6.5 Collection and treatment of domestic garbage and sewage
- 6.6 Auxiliary equipment
- 7 Completion environmental protection requirements
1 Scope
This part of GB/T 39139 specifies the source control, process control, waste collection and treatment, and completion environmental protection requirements for shale gas drilling operations.
This part is applicable to pollution prevention and disposal of onshore shale gas drilling operations.
2 Normative references
The following documents are indispensable for the application of this document. For dated reference documents, only the dated version applies to this document.
For undated references, the latest version (including all amendments) applies to this document.
GB/T 5005 Drilling fluid material specification
GB 5085.6-2007 Identification Standard for Hazardous Waste Identification of Toxic Substance Content
GB 8978 Integrated Wastewater Discharge Standard
SY/T 5087 Safety specification for drilling sites in hydrogen sulfide environment
SY/T 5466 Technical requirements for pre-drilling engineering and well site layout
SY/T 5972 Drilling Rig Basic Selection
SY/T 6629 Recommended Practice for Environmental Protection in Onshore Drilling Operations
SY/T 6787 Environmental protection technical requirements for water-soluble oilfield chemicals
SY/T 7301 Onshore oil and gas exploitation, comprehensive utilization of oily sludge resources and technical requirements for pollution control
3 Terms and definitions
The following terms and definitions apply to this document.
3.1 Batch drilling
In the same well site, a drilling rig is used to drill the similar intervals of multiple wells in sequence, and then drill the next layer in sequence after cementing.
4 Source control
4.1 Pre-drilling works
4.1.1 Wellsite area
4.1.1.1
The area of the well site and the layout of the work area shall be implemented in accordance with the regulations of SY/T 5466, and the selection of the basic drilling rig shall be implemented in accordance with the regulations of SY/T 5972.
4.1.1.2
Set up the well site and camp in accordance with SY/T 6629 regulations.
4.1.2 Wellsite cleaning and diversion system
4.1.2.1
The foundation of wellsite drilling rigs and supporting equipment should meet.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Referenced standards
Similar standards
How to Download GB/T 39139.1-2020
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 39139.2-2023 — Shale gas—Environmental protection—Part 2: Recommended practice for environmental protection of production operations
GB/T 10003-2026 — Biaxially oriented polypropylene (BOPP) film
GB/T 10004-2026 — Plastic/Plastic laminated films and pouches for packaging
Secure payment via Stripe
Payments accepted
GB/T 39139.1-2020
$150.00