GB/T 37663.3-2019Outdoor empirical test requirements for distributed photovoltaic in warm damp climate—Part 3: Grid-connection photovoltaic system (English PDF)
湿热带分布式光伏户外实证试验要求 第3部分:并网光伏系统
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for GB/T 37663.3-2019 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
June 4, 2019
Implementation date
January 1, 2020
Scope
GB/T 37663.3-2019 is the English-translated version of 湿热带分布式光伏户外实证试验要求 第3部分:并网光伏系统.
GB/T 37663.3-2019 is the Chinese standard "Outdoor empirical test requirements for distributed photovoltaic in warm damp climate—Part 3: Grid-connection photovoltaic system".
Its scope clause reads: This part of GB/T 37663 specifies the outdoor empirical test requirements for distributed grid-connected photovoltaic systems, including the basic requirements for empirical testing.
Seeking and testing methods for solar energy empirical tests, empirical tests for power generation efficiency, empirical tests for power generation operations, and empirical tests for grid-connected performance.
This section applies to the "damp heat" climate zone specified in GB/T 4797.1, which is connected to the grid through the AC380V voltage level, and The AC10(6)kV voltage level is connected to the user side to build, rebuild and expand the distributed grid-connected photovoltaic system.
It is not applicable to the concentrating photovoltaic module group. A distributed grid-connected photovoltaic system. Large-scale ground-based photovoltaic power plants, as well as grid-connected photovoltaic systems in the “sub-humid tropics” climate zone, can also refer to carried out. Its clauses include terms and definitions.
Found what you need?
Document preview — GB/T 37663.3-2019
National Standard of the People's Republic of China
- ICS
- 27.160
- Classification
- K 04
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Foreword
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
- 4 sample requirements
- 5 Test cycle, project and equipment requirements
- 6 Solar Energy Empirical Test
- 7 Power generation efficiency empirical test
- 8 Power generation operation empirical test
- 9 Grid performance test
- 10 Test report
- Appendix A (Normative Appendix) Distributed Grid-Connected Photovoltaic System Information Statistics Table
1 Scope
This part of GB/T 37663 specifies the outdoor empirical test requirements for distributed grid-connected photovoltaic systems, including the basic requirements for empirical testing.
Seeking and testing methods for solar energy empirical tests, empirical tests for power generation efficiency, empirical tests for power generation operations, and empirical tests for grid-connected performance.
This section applies to the "damp heat" climate zone specified in GB/T 4797.1, which is connected to the grid through the AC380V voltage level, and
The AC10(6)kV voltage level is connected to the user side to build, rebuild and expand the distributed grid-connected photovoltaic system. It is not applicable to the concentrating photovoltaic module group.
A distributed grid-connected photovoltaic system. Large-scale ground-based photovoltaic power plants, as well as grid-connected photovoltaic systems in the “sub-humid tropics” climate zone, can also refer to carried out.
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article.
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 4797.1 Classification of environmental conditions Natural environmental conditions Temperature and humidity
GB/T 12326 power quality voltage fluctuations and flicker
GB/T 13126 General technical conditions for wet tropical protective packaging for electromechanical products
GB/T 14549 power quality utility grid harmonics
GB/T 15543 power quality three-phase voltage imbalance
GB/T 17215.322 Particular requirements for measuring equipment - Part 22. Static active energy meters (0.2 S class and 0.5 S level)
GB/T 20840.2 Transformers - Part 2. Supplementary technical requirements for current transformers
GB/T 20840.3 Transformers - Part 3. Supplementary technical requirements for electromagnetic voltage transformers
GB/T 24337 Power Quality Utility Grid Interharmonics
GB/T 29319 photovoltaic power generation system access to distribution network technical regulations
GB/T 30152 Photovoltaic power generation system access distribution network testing procedures
GB 50343 lightning protection technical specification for building electronic information systems
Temperature and irradiance correction method for measured I-V characteristics of IEC 60891 photovoltaic devices (Photovoltaicdevices-
ProceduresfortemperatureandirradiancecorrectionstomeasuredI-Vcharacteristics)
Photovoltaic devices - Part 1. Measurement of photovoltaic current-voltage characteristics (Photovoltaicdevices - Part 1.
Measurementofphotovoltaiccurrent-voltagecharacteristics)
3 Terms and definitions
The following terms and definitions apply to this document.
3.1 System efficiency
The ratio of the total power generated by a distributed grid-connected photovoltaic system to the total amount of radiation absorbed by the inclined surface of the photovoltaic module during a certain period of time.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Similar standards
How to Download GB/T 37663.3-2019
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 37663.2-2019 — Outdoor empirical test requirements for distributed photovoltaic in warm damp dlimate—Part 2: Photovoltaic backsheet
GB/T 37663.1-2019 — Outdoor empirical test requirements for distributed photovoltaic in warm damp climate—Part 1: Photovoltaic module
GB/T 7251.4-2026 — Low-voltage switchgear and controlgear assemblies - Part 4: Particular requirements for assemblies for construction sites (ACS)
Secure payment via Stripe
Payments accepted
GB/T 37663.3-2019
$235.00