Valid

GB/T 36289.1-2018Insulating films of crystalline silicon photovoltaic(PV) modules—Part 1: Polyethylene terephthalate films (English PDF)

晶体硅太阳电池组件用绝缘薄膜 第1部分:聚酯薄膜

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for GB/T 36289.1-2018 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

June 7, 2018

Implementation date

January 1, 2019

Scope

GB/T 36289.1-2018 is the English-translated version of 晶体硅太阳电池组件用绝缘薄膜 第1部分:聚酯薄膜.

GB/T 36289.1-2018 covers the polyethylene terephthalate (PET) films used as insulating films in crystalline silicon photovoltaic modules, made from PET and masterbatch by melt casting and biaxial stretching.

It sets the requirements and describes the test methods, starting from sampling, pretreatment and test conditions.

The tests include appearance, thickness, shrinkage at 150 °C, water vapour transmission rate by electrolytic or infrared sensor, tensile strength and elongation at break, the damp heat steady state (double 85) test, ultraviolet resistance with yellow index and surface gloss.

Inspection rules, marking, packaging, transport and storage complete the text. Film producers and module makers use it for supply and acceptance. It was issued on 7 June 2018 and has applied since 1 January 2019.

Found what you need?

Document preview — GB/T 36289.1-2018

National Standard of the People's Republic of China

ICS
29.035.99
Classification
K 15

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Foreword3
  • 1 Scope4
  • 2 Normative references4
  • 3 Terms and definitions5
  • 4 Requirements5
  • 5 Test methods7
  • 6 Inspection rules11
  • 7 Marking, packaging, transport, and storage13

1 Scope

This Part of GB/T 36289 specifies the requirements, test methods, inspection rules, packaging, marking, transport, and storage of polyethylene terephthalate films for crystalline silicon photovoltaic (PV) modules.

This Part applies to films made from polyethylene terephthalate (PET) and masterbatch by molten casting and biaxially oriented stretching.

2 Normative references

The following documents are indispensable for the application of this document. For the dated references, only the versions with the dates indicated are applicable to this document. For the undated references, the latest version (including all the amendments) are applicable to this document.

GB/T 1408.1 Electrical strength of insulating materials - Test methods - Part 1. Tests at power frequencies

GB/T 2423.3 Environmental testing - Part 2. Testing method - Test Cab. Damp heat, steady state

GB/T 3979 Methods for the measurement of object color

GB/T 7921 Uniform color space and color difference formula

GB/T 8807 Test method for specular gloss of plastics

GB/T 13542.1-2009 Film for electrical insulation - Part 1. Definitions and general requirements

GB/T 13542.2-2009 Film for electrical insulation - Part 2. Methods of test

GB/T 13542.4 Film for electrical insulation - Part 4. Polyethylene terephthalate film used for electrical insulation

GB/T 16935.1-2008 Insulation coordination for equipment within low-voltage systems - Part 1. Principles requirements and tests

5 Test methods

5.1.2 Pretreatment conditions

Unless otherwise specified, all test pieces shall be treated at a temperature of (23±2)°C and a relative humidity of (50±5)% for at least 24 h. […]

5.1.3 Test conditions

Unless otherwise specified, all tests shall be carried out at a temperature of (23±2)°C and a relative humidity of (50±5)%.

5.2 Appearance

CUT the film of about 1 m, under natural light, CHECK and ASSESS by visual method.

5.3 Thickness

It shall be in accordance with the provisions of Chapter 4 of GB/T 13542.2-2009.

5.4 Shrinkage

According to the provisions of Chapter 23 of GB/T 13542.2-2009, the resolution of the measuring instrument shall not be less than 0.1 mm. Test conditions. Heating temperature is (150±2)°C; heating time is 30 min.

5.5 Water vapor transmission rate

5.5.1 Electrolytic detection sensor method

According to the provisions of GB/T 21529, test conditions. Temperature is (38±2)°C; relative humidity is (90±2)%. TEST 3 test pieces; TAKE the median as the result and REPORT the maximum. It is recommended that this method be preferred.

5.5.2 Infrared detection sensor method

According to the provisions of GB/T 26253, TEST 3 test pieces; TAKE the median as the result and REPORT the maximum.

5.6 Tensile strength and elongation at break

According to the provisions of Chapter 11 of GB/T 13542.2-2009, the tensile speed is 100 mm/min; the distance between marking lines is 100 mm. When there is no dispute, the clamping distance can be 100 mm.

5.13 Damp heat steady state test (double 85 test)

According to the provisions of GB/T 2423.3, in the longitudinal direction on the sample, CUT 5 test pieces of 200 mm×15 mm; HANG them in a constant temperature and humidity test chamber at a temperature of (85±2)°C and a relative humidity of (85±5)% for treatment. The test pieces shall not overlap or contact the inner wall of the container. The treatment time is 1000 h ~ 3000 h (The specific time is agreed upon by the supplier and the buyer). After the treatment, TAKE the test pieces out; WIPE the surface water drops with filter paper or absorbent cotton; and then PUT them in a room temperature dryer to balance for more than 4h. According to Chapter 11 of GB/T 13542.2-2009, the elongation at break of the 5 test pieces is measured. The tensile speed is 100 mm/min. The distance between clamps is 100 mm. The median is taken as the result.

5.14 Ultra-violet (UV) resistance

According to the provisions of 11.10 in IEC 61215-1-1:2016, in the longitudinal direction on the sample, CUT 5 test pieces of 200 mm×15 mm and 3 test pieces of 100 mm×100 mm. The test temperature is (60±5)°C. The UV A wavelength applied is 320 nm ~ 400 nm. The total irradiation energy shall be in accordance with the provisions of Table 2. The minimum UV B wavelength applied is 300 nm ~ 320 nm. After the test, TAKE out the test pieces; DETECT and RECORD whether there is delamination, blistering, cracking, or chalking in the test pieces.

For the test pieces of 200 mm×15 mm, according to the provisions of Chapter 11 of GB/T 13542.2-2009, their elongation at break is measured; the retention rate of elongation at break is calculated; and the median is taken as the result.

For the test pieces of 100 mm×100 mm, according to the provisions of GB/T 3979 and GB/T 7921, their yellow index b is measured; deltab is calculated; and the median is taken as the result.

5.15 Surface gloss

According to the provisions of GB/T 8807, the test angle is 60°.

6 Inspection rules

6.1 Exit-factory inspection

The polyethylene terephthalate films for crystalline silicon photovoltaic (PV) […]

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download GB/T 36289.1-2018

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 36289.1-2018

$125.00