GB/T 34931-2017Testing code for reactive power compensation device of photovoltaic power station (English PDF)
光伏发电站无功补偿装置检测技术规程
This is a limited preview
Buy now to download the full PDF (17 pages)
Need quotation for your management?
Get a formal quotation for GB/T 34931-2017 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
November 1, 2017
Implementation date
May 1, 2018
Scope
GB/T 34931-2017 is the English-translated version of 光伏发电站无功补偿装置检测技术规程.
GB/T 34931-2017 is the Chinese standard "Testing code for reactive power compensation device of photovoltaic power station". Its scope clause reads: This standard specifies the test conditions of photovoltaic power station reactive power compensation device, testing equipment, testing content, testing steps.
This standard applies to the grid through the 35kV and above voltage levels, and through the 10kV voltage level connected with the public power grid new Construction, expansion and reconstruction of photovoltaic power plants. Its clauses include terms and definitions.
Found what you need?
Document preview — GB/T 34931-2017
National Standard of the People's Republic of China
- ICS
- 27.160
- Classification
- F 12
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Foreword
- 1 Scope
- 2 Normative references
- 3 Terms and definitions
- 4 basic provisions
- 5 test method
- 6 test file
- Appendix A (informative) voltage characteristics of the curve
- Appendix B (Normative) Reactive power response calculation method
- Appendix C (informative) test report
1 Scope
This standard specifies the test conditions of photovoltaic power station reactive power compensation device, testing equipment, testing content, testing steps.
This standard applies to the grid through the 35kV and above voltage levels, and through the 10kV voltage level connected with the public power grid new
Construction, expansion and reconstruction of photovoltaic power plants.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version applies to this article
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 2829 cycle test count sampling procedures and tables (for the stability of the test process)
GB/T 14549 Power Quality Utility Harmonic
GB/T 17626.30 Electromagnetic compatibility test and measurement techniques Power quality measurement methods
Technical specifications for access to power system in photovoltaic power stations
Transformers - Part 2. Technical supplementary requirements for current transformers
Transformers GB/T 20840.3 Transformers - Part 3. Technical supplementary requirements for electromagnetic voltage transformers
GB/T 31365 photovoltaic power station access network testing procedures
3 Terms and definitions
The following terms and definitions apply to this document.
3.1 Photovoltaic Power Station photovoltaic (PV)
The use of photovoltaic cells photovoltaic effect, the solar radiation can be directly converted into electrical power generation system, generally includes transformers, inverters
And PV array, as well as related auxiliary facilities.
3.2 Pointofinterconnection
For a photovoltaic power station with booster station, refer to the high-voltage bus or node of booster station, and for photovoltaic power station without booster station, refer to photovoltaic
Power plant output summary point.
3.3 Reactive powercompensationdeviceinPVpowerstation
Photovoltaic power plant can track the requirements of the issue of adjustable capacitive or inductive reactive power complete sets of devices, including reactive power adjustment capability
Of photovoltaic inverter or static var compensator, static var generator and other centralized reactive power compensation device and station reactive power control device.
3.4 Photovoltaic power station dynamic reactive response time responsetimeofdynamicreactivepowerinPVpowerstation
Photovoltaic power station from the network voltage abnormal increase or decrease to trigger the set value of the beginning until the PV power station and network reactive power
The time required for the rate of change of the actual output (the difference between the target value and the initial value) to reach 90% of the target value of the variation.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 17 pages — is available in the English PDF.
Similar standards
How to Download GB/T 34931-2017
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 10003-2026 — Biaxially oriented polypropylene (BOPP) film
GB/T 10004-2026 — Plastic/Plastic laminated films and pouches for packaging
GB/T 10007-2026 — Rigid cellular plastics - Determination of shear properties
GB/T 34931-2017
$300.00