Scope

GB/T 30425-2025 is the English-translated version of 高压直流输电换流阀水冷却设备.

GB/T 30425-2025 is the Chinese national standard covering the closed water loop that removes heat from an HVDC converter valve — the main circulation pump, deionisation unit, heat exchanger and pipework, the conductivity and pH of the internal cooling water, which has to stay non-conducting while it flows through an energised valve, the dielectric strength and grounding resistance, the redundant control and protection with standby switching, the trip signals to the station control system, and the annual availability. It replaces GB/T 30425-2013, under the China Electrical Equipment Industry Association. In force from 1 November 2025. Issued on 25 April 2025, it has been in force since 1 November 2025, replacing GB/T 30425-2013.

Document preview — GB/T 30425-2025

National Standard of the People's Republic of China

ICS
29.200
Classification
K 46
Replacing
GB/T 30425-2013

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • PrefaceIII
  • 1 Scope1
  • 2 Normative references1
  • 3 Terms and Definitions1
  • 4 Product specifications and models2
  • 4.1 Product Specifications2
  • 4.2 Product Model2
  • 5 General Conditions of Use3
  • 5.1 Valve Hall3
  • 5.2 Water cooling equipment room3
  • 5.3 Outdoor Environment3
  • 5.4 External cooling water3
  • 5.5 Power supply3
  • 6 Technical requirements4
  • 6.1 Technical Parameters4
  • 6.2 Configuration and Functions4
  • 6.3 Appearance9
  • 6.4 Dielectric strength9
  • 6.5 Grounding resistance9
  • 6.6 Noise9
  • 6.7 Annual availability10
  • 6.8 Materials, manufacturing, installation and cleaning of water cooling equipment and pipelines10
  • 7 Experiments10
  • 7.1 Overview10
  • 7.2 Type test11
  • 7.3 Factory test14
  • 7.4 Field Test14
  • 8 Packaging, transportation and storage15
  • 8.1 Packaging15
  • 8.2 Transportation16
  • 8.3 Storage16
  • 9 Logo16
  • Appendix A (Informative) Water Cooling Equipment Selection Parameters and Configuration Requirements17
  • References18
  • Figure 1 Water cooling equipment model2
  • Figure 2 Water cooling equipment flow chart5

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1: Structure and drafting rules for standardization documents" Drafting is required.

This document replaces GB/T 30425-2013 "Water Cooling Equipment for High Voltage Direct Current Transmission Converter Valves". Compared with GB/T 30425-2013, In addition to structural adjustments and editorial changes, the main technical changes are as follows.

-- Added the terms "(HVDC converter valve) water cooling equipment", "rated cooling capacity", "rated cooling power", "rated flow Quantity” (see 3.1, 3.5, 3.6);

-- The terms "indirect cooling", "forced circulation", "forced cooling", "heat transfer coefficient" and "logarithmic mean temperature difference" have been deleted (see the 2013 edition 3.3, 3.4, 3.8, 3.9);

--The definitions of the terms "internal cooling water" and "external cooling water" have been changed (see 3.7, 3.8, 3.6, 3.7 of the 2013 edition);

--Changed the product specification range (see 4.1, 4.1 of the 2013 edition);

--Changed the rules for compiling water cooling equipment models (see 4.2, 4.2 of the 2013 edition);

--Changed the outdoor environmental conditions (see 5.3, 5.3 of the 2013 edition);

--Changed the requirements for external cooling water (see 5.4, 5.4 of the 2013 edition);

--Changed the requirements for power supply (see 5.5.1, 5.5.1 of the 2013 edition);

--Changed the requirements for control power supply (see 5.5.2, 5.5.2 of the 2013 edition);

--Deleted "other requirements" (see 5.5.3 of the 2013 edition);

--Changed the flow requirements of internal cooling water (see 6.1.3, 6.1.3 of the 2013 edition);

--Changed the general requirements for configuration and function (see 6.2.1, 6.2.1 of the 2013 edition);

-- Deleted the requirements for electric motors (see 6.2.2 of the 2013 edition);

-- Deleted the requirements for pumps and main circulation pump configuration, and added requirements for main circulation pumps and spray pumps (see 6.2.2, 6.2.3, 2013 Version 6.2.3, 6.2.7);

-- Deleted the requirements for cooling fans (see 6.2.4 of the 2013 edition);

--Deleted key equipment configuration and merged it into general rules (see 6.2.1, 6.2.1 and 6.2.5 of the 2013 edition);

--Change "buffer configuration" to "buffer voltage stabilizing device" (see 6.2.4, 6.2.6 of the 2013 edition);

--Changed the requirements for heat exchangers and changed the heat transfer performance requirements (see 6.2.7, 6.2.10 and 6.3 of the 2013 edition);

-- Changed the requirements for monitoring instruments (see 6.2.8, 6.2.11 of the 2013 edition);

--Changed the general requirements for control and protection systems and the requirements for redundant configuration (see 6.2.12.1, 6.2.12.2, 2013 edition) 6.2.15.1, 6.2.15.2);

--Changed the requirements for power supply control (see 6.2.12.3, 6.2.15.3 of the 2013 edition);

-- Changed the requirements for standby switching (see 6.2.12.4, 6.2.15.4 of the 2013 edition);

-- Changed the temperature control requirements (see 6.2.12.5, 6.2.15.5 of the 2013 edition);

--Changed the monitoring requirements for control systems (see 6.2.12.6, 6.2.15.6 of the 2013 edition);

-- Changed the requirements for electrical control cabinets (see 6.2.12.7, 6.2.15.7 of the 2013 edition);

--Change "external cooling water hardness monitoring" to "external cooling water quality monitoring" (see 6.2.12.10, 6.2.15.10 of the 2013 edition);

-- Changed the requirements for alarm signals (see 6.2.12.12, 6.2.15.12 of the 2013 edition);

-- Changed the requirements for tripping signals (see 6.2.12.13, 6.2.15.13 of the 2013 edition);

--Added "Interface Requirements" related content (see 6.2.12.14);

-- Changed the requirements for appearance (see 6.3, 6.4 of the 2013 edition);

--Changed the relevant requirements for insulation strength (see 6.4, 6.5 of the 2013 edition);

--Changed the requirements for grounding resistance (see 6.5, 6.6 of the 2013 edition);

--Changed the noise related requirements (see 6.6, 6.7 of the 2013 edition);

-- Changed the relevant requirements for materials (see 6.8.1, 7.1 of the 2013 edition);

--Added "non-destructive testing" related content (see 6.8.2.2);

-- Changed the relevant requirements for installation (see 6.8.2.3, 7.2.2 of the 2013 edition);

-- The requirement that factory tests must include heat transfer performance tests has been deleted (see 8.1 of the 2013 edition);

-- The requirement that type tests must include communication and interface tests has been deleted (see 8.1 of the 2013 edition);

--Changed the insulation test requirements (see 7.2.2, 8.2.2 of the 2013 edition);

--The requirements for air pressure test have been changed (see 7.2.4.2, 8.2.4.2 of the 2013 edition);

--Added the test sample requirements for heat transfer performance test and changed the test method for heat transfer performance test (see 7.2.7, 2013 edition) 8.2.7);

--Changed the requirements for noise measurement (see 7.2.8, 8.2.8 of the 2013 edition);

-- Changed the electromagnetic compatibility test requirements (see 7.2.10, 8.2.10 of the 2013 edition);

--Changed the requirements for factory testing (see 7.3, 8.3 of the 2013 edition);

-- Changed the requirements for field tests (see 7.4, 8.4 of the 2013 edition);

-- Changed the relevant requirements for labeling (see Chapter 9, Chapter 10 of the 2013 edition).

Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents.

This document was proposed by the China Electrical Equipment Industry Association.

This document is under the jurisdiction of the National Technical Committee for Standardization of Power Electronics Systems and Equipment (SAC/TC 60).

This document was drafted by: Xi'an XD Electric Power System Co., Ltd., Xi'an High Voltage Electrical Equipment Research Institute Co., Ltd., State Grid Corporation of China The company's DC Technology Center, State Grid Economic and Technological Research Institute Co., Ltd., China Southern Power Grid Research Institute Co., Ltd., Henan Jingrui Cooling Technology Co., Ltd., Changzhou Borui Electric Automation Equipment Co., Ltd., Xuji Electric Co., Ltd., Guangzhou Gaolan Energy Saving Technology Co., Ltd.

Co., Ltd., State Grid Sichuan Electric Power Company UHV DC Center, State Grid Smart Grid Research Institute Co., Ltd., China Southern Power Grid Co., Ltd.

The Electric Power Research Institute of the Ultra-High Voltage Transmission Company of China Southern Power Grid Co., Ltd., the Kunming Bureau of the Ultra-High Voltage Transmission Company of China Southern Power Grid Co., Ltd., and the State Grid Jiangsu Provincial Electric Power Co., Ltd. Electric Power Research Institute, Nanjing NARI Relay Protection Engineering Technology Co., Ltd., China Electric Purui Electric Power Engineering Co., Ltd., State Grid Fujian Electric Power Co., Ltd. Electric Power Research Institute, Shandong Taikai Power Electronics Co., Ltd., Beijing Guodian Futong Technology Development Co., Ltd.

Company, Xi'an Electric Power Electronics Technology Research Institute Co., Ltd., China Southern Power Grid Co., Ltd. Ultra-high Voltage Transmission Company Dali Branch, Xiangbo Transmission Thermal Technology Co., Ltd. and State Grid Sichuan Electric Power Co., Ltd. Electric Power Research Institute.

The main drafters of this document are: Jiao Xiuying, Zhou Huigao, Gao Shengfu, Han Haiyin, Tong Congwei, Wei Wei, Wang Qiang, Chen Wu, Cai Changqun, Xu Fan, Yang Xiaohui, Qiu Miaosheng, Huang Yu, Liu Qian, Zhou Jianhui, Jiang Long, Wang Zhen, Li Lingfei, Xu Zimeng, Feng Jingbo, Huang Jianxiang, Xu Yang, Jiang Nan, Hou Junyi, Xiao Kai, Chao Wujie, Lei Yazhou, Qin Weizhen, Zhang Jiabin, Ren Haiying, Hu Zhilong, Zhang Teng, Huang Chao, Li Jingliang, Dong Tianhua, Zhang Yining, Xu Hongzheng, Chen Yang, Wang, Xiaoyang, Liu, Jinsong, Xia, Zhiyu, Liao, Wenlong, and Zhong, Qidi.

This document was first published in 2013 and this is the first revision.

HVDC converter valve water cooling equipment

1 Scope

This document specifies the product specifications and models, general use conditions, technical requirements, test Inspection, packaging, transportation and labeling, etc.

This document applies to water cooling equipment for HVDC converter valves.

2 Normative references

GB/T 3767

GB/T 3859.1

GB/T 4025

GB/T 7190.3-2019

GB/T 7251.1-2023

GB/T 13384

GB/T 14296-2008

GB/T 17799.2

GB 17799.4-2022

GB/T 29531-2013

GB 50235

3 Terms and definitions

The terms and definitions defined in GB/T 3859.1 and the following apply to this document.

3.1 (High Voltage Direct Current Converter Valve) Water Cooling Equipment

Equipment All equipment required to remove the heat generated by HVDC converter valves and transfer it to the external environment.

Note. The water cooling equipment mainly includes the main circulation pump, deionization device, heat exchanger, connecting pipes and control and protection system on the cooling circuit.

3.2 Cooling medium

A liquid (such as water) or gas (such as air) that removes heat from the heat exchanger of a water-cooled device.

3.3 Heat transfer agent

The liquid that transfers heat from the heat source to the heat exchanger in a water cooling system.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 24 pages — is available in the English PDF.

Referenced standards

Editions of GB/T 30425

EditionTitleRevisionStatus
GB/T 30425-2025Water cooling equipment for converter valves for high voltage direct current(HVDC) ower transmissioncurrent editionCurrent
GB/T 30425-2013Water cooling equipment for converter valves for high voltage direct current (HVDC) power transmissionprevious editionIn force

This page sells the current edition, GB/T 30425-2025. Earlier editions are listed for reference only.

How to Buy GB/T 30425-2025

  1. 1Add to cart. Click the "Buy GB/T 30425-2025" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
24 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 30425-2025

$425.00

$360.00for partners