Scope
GB/T 7190.3-2019 is the English-translated version of 机械通风冷却塔 第3部分:闭式冷却塔.
Part 3 of China's national standard for mechanical draft cooling towers, covering closed circuit towers. A closed tower keeps the process fluid inside a coil and sprays water over the outside of it, so the fluid is cooled evaporatively without ever meeting the air. That costs a few degrees of approach and a heat exchanger, and it buys something an open tower cannot offer: the circuit stays clean. In an open tower the process water is exposed to everything the air carries - dust, spores, and the oxygen that drives corrosion - and it concentrates dissolved solids as it evaporates, which is why open systems need continuous chemical treatment and still foul. A closed circuit is also what allows glycol to be used for freeze protection, and it removes the Legionella risk from the process side. This part specifies the product classification and marking, requirements, test methods, inspection rules, marking, packaging, transport and storage, and applies to closed towers of up to 500 cubic metres an hour per tower.
Document preview — GB/T 7190.3-2019
National Standard of the People's Republic of China
- ICS
- 83.120
- Classification
- Q 23
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- 1 Scope
- 2 Normative references
- 3 Terms and definitions
Foreword
GB/T 7190 "Mechanical Ventilation Cooling Tower" is divided into three parts.
--- Part 1. Small and medium-sized open cooling towers;
--- Part 2. Large open cooling towers;
--- Part 3. Closed cooling tower. This part is the third part of GB/T 7190. This part is drafted in accordance with the rules given in GB/T 1.1-2009. This part was proposed by the China Building Materials Federation. This part is under the jurisdiction of the National Fiber Reinforced Plastics Standardization Technical Committee (SAC/TC39). This section drafted by: Beijing FRP Research and Design Institute Co., Ltd., China Institute of Water Resources and Hydropower Research, Shanghai University of Technology, Huazhong University of Science and Technology, China Power Engineering Consulting Group North China Electric Power Design Institute Co., Ltd., Information Industry Electronics Eleventh Design and Research Institute Science and Technology Engineering Co., Ltd., Guangzhou Metro Group Co., Ltd., Jiangsu Seagull Cooling Tower Co., Ltd., Guangzhou Vision Technology Development Co., Ltd., Chemical Engineering Cangzhou Cooling Technology Co., Ltd., Shanghai Jinri Cooling Equipment Co., Ltd., Zhejiang Wanxiang Technology Co., Ltd., Hunan Yuanhengke Technology Co., Ltd., Dalian Sidde Environmental Equipment Co., Ltd., Yilan Hezhong Technology (Beijing) Co., Ltd., Xinling Air Conditioning (Fogang) Co., Ltd. Company, Zhejiang Jinling Refrigeration Engineering Co., Ltd., Zhejiang Dongjie Cooling Tower Co., Ltd., Shandong Tianyi Cooling Technology Co., Ltd. The main drafters of this section. Yin Zheng, Zhao Shun'an, Zhang Lixin, Chen Liangcai, Feng Wei, Wen Xiaojun, Zhang Lichen, Wu Jiang. Mechanical ventilation cooling tower Part 3. Closed cooling tower
1 Scope
Part 3 of China's national standard for mechanical draft cooling towers, covering closed circuit towers. A closed tower keeps the process fluid inside a coil and sprays water over the outside of it, so the fluid is cooled evaporatively without ever meeting the air. That costs a few degrees of approach and a heat exchanger, and it buys something an open tower cannot offer: the circuit stays clean. In an open tower the process water is exposed to everything the air carries - dust, spores, and the oxygen that drives corrosion - and it concentrates dissolved solids as it evaporates, which is why open systems need continuous chemical treatment and still foul. A closed circuit is also what allows glycol to be used for freeze protection, and it removes the Legionella risk from the process side. This part specifies the product classification and marking, requirements, test methods, inspection rules, marking, packaging, transport and storage, and applies to closed towers of up to 500 cubic metres an hour per tower.
This part of GB/T 7190 specifies the product classification and marking, requirements, test methods, inspection rules, signs and packages of the closed cooling tower. Loading, transportation and storage and others. This section applies to a closed cooling tower with a cooling capacity of not more than 500m3/h in a single tower (hereinafter referred to as a closed tower).
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article. Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB/T 151 heat exchanger
GB/T 1449 fiber reinforced plastic bending performance test method
GB/T 2518 continuous hot-dip galvanized steel sheet and strip
GB/T 7190.1 Mechanical Ventilation Cooling Tower Part 1. Small and Medium Open Cooling Towers
GB/T 8924 Fibre reinforced plastics - Determination of burning performance - Oxygen index method Technical requirements and test methods for hot-dip galvanized coating of
GB/T 13912 metal-clad steel parts
GB/T 31539-2015 Structural fiber reinforced composite pultruded profiles
HJ706 Environmental Noise Monitoring Technical Specification Noise Measurement Correction Auxiliary equipment for ammonia refrigeration systems - Part 5. Evaporative condensers
3 Terms and definitions
The following terms and definitions as defined in GB/T 7190.1 apply to this document.
3.1 Closed cooling tower closedcircuitcoolingtower The circulating cooling water does not directly contact with the air, and the heat is transferred to the spray water through the partition wall heat exchanger, and the evaporation of the spray water and the air display Heat transfer, a device that reduces the temperature of the circulating cooling water.
3.2 Heat exchange module heatexchangemodule A heat exchange unit composed of a heat exchanger such as a coil or a plate-wall heat exchanger and a water-filled filler (partially contained).
3.3 Spray water spraywater Spraying water to the heat exchange module through the water distribution device and only self-circulating water in the tower.
3.4 Circulating cooling water circuitingcoolingwater The process water that is cooled in the inter-wall heat exchanger.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 44 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 151Heat exchangers
- GB/T 2518Continuously hot-dip zinc and zinc alloy coated steel sheet and strip
- GB/T 7190.1Mechanical draft cooling towers - Part 1: Medium and small open cooling towers
- GB/T 8924Test method for the flammability characteristics of fibre reinforced plastics - Oxygen index method
- GB/T 31539-2015Pultruded fibre reinforced polymer composite structural profiles
GB/T 1449 · GB/T 13912
How to Buy GB/T 7190.3-2019
- 1Add to cart. Click the "Buy GB/T 7190.3-2019" button on this page. You can add more standards before checkout.
- 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
- 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 14490-2008 — Inspection of grain and oil - Determination gelatinization properties in cereal and starch by viscograph
GB/T 14491-2025 — Propylene oxide for industrial use
GB/T 14492-2008 — Unreusable steel drum of calcium carbide for packing
Secure payment via Stripe
Payments accepted
GB/T 7190.3-2019
$320.00