GB/T 28814-2012The guide for composition of the ±800kV converter station operating code (English PDF)
±800kV换流站运行规程编制导则
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for GB/T 28814-2012 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
November 5, 2012
Implementation date
February 1, 2013
Scope
GB/T 28814-2012 is the English-translated version of ±800kV换流站运行规程编制导则.
GB/T 28814-2012 is a guide for drawing up the operating code of a converter station.
Clause 1 says the standard specifies the format, the content and the requirements for writing the operating procedures of converter stations of plus or minus 800 kV and below, and that it applies to the preparation, the approval and the management of those procedures.
Clause 2 cites GB/T 2900.50, GB/T 2900.57, GB/T 2900.59, GB/T 13498, GB/Z 14429-2005 and DL/T 800. The table of contents lists an Introduction, 1 Scope, 2 Normative references, a clause 3 on the main content of the operating procedures and a clause 4 on their management.
In the body, clause 3 begins with 3.1 Equipment Overview, which asks the procedures to record the location and nature of the station, the date it was established and the date of the previous expansion, the development process, the main device wiring, the converter capacity, the reactive power compensation capacity and the incoming and outgoing circuits with their voltage levels; its 3.1.1 then works through the individual apparatus, with 3.1.1.1 circuit breakers, 3.1.1.2 disconnectors and earthing switches, 3.1.1.3 current transformers and 3.1.1.4 voltage transformers and DC voltage dividers, each to be described by structural model, main accessories, installation location, date of commissioning, equipment manufacturer, main technical parameters and operating instructions.
The draft ends after 3.1.1.4, so clause 4 and the rest of clause 3 are not shown. The standard was proposed by China Electricity Council and is administered by SAC/TC324, and the page files it under ICS 29.240.10 and Chinese classification K40.
The page prints its issue and implementation dates squashed onto a single line and in an order that contradicts itself, giving an implementation date earlier than the issue date, so neither date is reported here.
Found what you need?
Document preview — GB/T 28814-2012
National Standard of the People's Republic of China
- ICS
- 29.240.10
- Classification
- K 40
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Introduction
- 1 Scope
- 2 Normative references
- 3 Contents 1 Main operating procedures
- 4 operating procedures managed
Foreword
This standard rule according to GB/T 1.1-2009 given draft. The standard proposed by China Electricity Council.
1 Scope
This standard specifies the ± 800kV and below voltage converter station operating procedures written in the format, content and requirements.
This standard applies to ± 800kV and below voltage converter station operating procedures for preparation, approval and management.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated edition applies to this document. For undated references, the latest edition (including any amendments) applies to this document.
GB/T 2900.50 Electrotechnical terminology Generation, transmission and distribution of generic terms
GB/T 2900.57 Electrotechnical terminology Generation, transmission and distribution operations
GB/T 2900.59 Electrotechnical terminology Generation, transmission and distribution substations
GB/T 13498 HVDC term
GB/Z 14429-2005 Telecontrol equipment and systems - Part 1-3: General term
DL/T 800 Power Standard Rules for the Enterprise
3 Operating procedures main content
3.1 Equipment Overview
Location and nature of the converter stations, establishment date and the date of the previous expansion, the development process, the master device wiring, converter capacity, change Capacity, reactive power compensation capacity, the inlet and outlet of each loop and voltage levels sent by the relationship between the grid and the like.
3.1.1 Equipment Overview
3.1.1.1 Circuit Breaker
Breaker structure models, the main accessories, installation location, the date of commissioning, equipment manufacturers; breaker main technical parameters and instructions.
3.1.1.2 Disconnector (earthing switch)
Disconnector (earthing switch) structure models, the main accessories, installation location, the date of commissioning, equipment manufacturers; disconnector (earthing switch) TECHNOLOGY Specifications and operation instructions.
3.1.1.3 Current Transformer
Current transformer structure models, the main accessories, installation location, the date of commissioning, equipment manufacturers; main technical parameters and current transformers Instructions.
3.1.1.4 Voltage transformer (DC voltage divider)
Voltage transformer (DC voltage divider) structure models, the main accessories, installation location, the date of commissioning, equipment manufacturers; voltage transformer (DC Divider) technical specifications and instructions.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 2900.50Electrotechnical terminology -- Generation, transmission and distribution of electricity -- General
- GB/T 2900.57Electrotechnical terminology -- Generation, transmission and distribution of electricity -- Operation
- GB/T 2900.59Electrotechnical terminology -- Generation, transmission and distribution of electricity -- Substations
- GB/T 13498Terminology for high-voltage direct current (HVDC) transmission
- DL/T 800Specifications for drafting standards of electric power enterprise
Similar standards
How to Download GB/T 28814-2012
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL/T 800-2001 — Rules for drafting company standards of electric power
DL/T 800-2012 — Guide for drafting company standards of electric power
DL/T 800-2018 — Specifications for drafting standards of electric power enterprise