Valid

GB/T 26376-2010Basic terms on natural disaster management (English PDF)

自然灾害管理基本术语

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for GB/T 26376-2010 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

January 14, 2011

Implementation date

June 1, 2011

Scope

GB/T 26376-2010 is the English-translated version of 自然灾害管理基本术语.

GB/T 26376-2010 is the Chinese standard "Basic terms on natural disaster management". Its scope clause reads: This standard specifies the basic terminology for natural disaster management.

This standard applies to natural disaster management. Its clauses include general terms.

Found what you need?

Document preview — GB/T 26376-2010

National Standard of the People's Republic of China

ICS
01.040.01
Classification
A 22

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • 1 Scope
  • 2 general terms
  • 2.1 Natural disaster
  • 2.2 Natural disaster management
  • 2.3 Disaster reduction
  • 2.4 Disaster prevention
  • 2.5 Disaster preparedness
  • 2.6 Disaster disaster response
  • 2.7 Disaster relief
  • 2.8 Resume rebuild recoveryandreconstruction

1 Scope

This standard specifies the basic terminology for natural disaster management.

This standard applies to natural disaster management.

2 general terms

2.1 Natural disaster

By natural factors caused by human life, property, social function and ecological environment damage or other events or phenomena.

Note. including meteorological disasters, earthquake disasters, geological disasters, marine disasters, biological disasters, forest or grassland fires.

2.2 Natural disaster management

At all stages of the disaster response, the government or relevant departments and social organizations make policies and make decisions to prevent and mitigate natural disasters.

And the measures taken.

2.3 Disaster reduction

At all stages of disaster management, a number of measures are taken to mitigate the effects of casualties, property damage,

The impact of the environment.

2.4 Disaster prevention

Before the disaster, take a series of measures to prevent the occurrence of disasters or disaster prevention caused by casualties, property damage, as well as the community and the

The impact of the environment.

2.5 Disaster preparedness

The risk investigation and assessment carried out before the disaster, the mechanism construction, the plan preparation, the emergency drill, the material reserve, the equipment and the communication guarantee

Training, social mobilization and a series of preparatory work.

2.6 Disaster disaster response

Disaster during the period, in order to fight or resist the disaster, emergency rescue, repair, rescue and a series of response work.

2.7 Disaster relief

Disaster after the disaster investigation and assessment, material deployment, transfer, life and medical assistance, psychological comfort, disaster relief donations, etc.

A series of disaster relief work.

2.8 Resume rebuild recoveryandreconstruction

Repair and reconstruction of disaster damage caused by the building (structure) buildings, ecological environment, production and life order and social function.

GB/T 16903-2021 | GB/T 15566.1-2020 | GB/T 31525-2015 | GB/T 46965-2026 | GB/T 23691-2026 | GB/T 18302-2026 | […]

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download GB/T 26376-2010

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 26376-2010

$85.00