Valid

GB/T 2317.4-2023Test method for electric power fittings - Part 4: Acceptance inspection (English PDF)

电力金具试验方法 第4部分:验收规则

Open the GB/T 2317.4-2023 preview as PDF

Preview — first pages of GB/T 2317.4-2023 (full document: 15 pages)

This is a limited preview

Buy now to download the full PDF (15 pages)

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

March 17, 2023

Implementation date

October 1, 2023

Scope

GB/T 2317.4-2023 is the English-translated version of 电力金具试验方法 第4部分:验收规则.

GB/T 2317.4-2023 covers the acceptance side of testing electric power fittings: the test items, the quantities to be tested, and the rules by which a result qualifies, for type tests, sampling tests and routine tests alike. The general technical conditions of the fittings themselves are taken from GB/T 2314 and the terms from GB/T 5075, so the text keeps to what is tested, on how many pieces, and what counts as a pass. Test requirements come first, dividing the work into those three categories and listing the items belonging to each; the acceptance rules follow, opening with the type test, whose purpose is to confirm the design performance of a fitting. Fittings are the small pieces that hold conductors, insulator strings and earth wires onto an overhead line, and agreeing in advance which pieces are proven by design test, which are covered by sampling and which are checked one by one is what keeps a consignment from being argued over after it arrives. Part 4 of the test method series. Of use to fittings manufacturers, transmission and distribution utilities, and inspection bodies handling delivery acceptance.

Document preview — GB/T 2317.4-2023

National Standard of the People's Republic of China

ICS
29.240.20

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Foreword3
  • 1 Scope5
  • 2 Normative References5
  • 3 Terms and Definitions6
  • 4 Test Requirements6
  • 5 Acceptance Rules13

Foreword

This document was issued on 17 March 2023 by the State Administration for Market Regulation; Standardization Administration of the PRC and takes effect on 1 October 2023.

It is a GB/T standard: recommended rather than compulsory, but it is the text a Chinese reviewer applies when assessing a submission.

1 Scope

GB/T 2317.4-2023 covers the acceptance side of testing electric power fittings: the test items, the quantities to be tested, and the rules by which a result qualifies, for type tests, sampling tests and routine tests alike. The general technical conditions of the fittings themselves are taken from GB/T 2314 and the terms from GB/T 5075, so the text keeps to what is tested, on how many pieces, and what counts as a pass. Test requirements come first, dividing the work into those three categories and listing the items belonging to each; the acceptance rules follow, opening with the type test, whose purpose is to confirm the design performance of a fitting. Fittings are the small pieces that hold conductors, insulator strings and earth wires onto an overhead line, and agreeing in advance which pieces are proven by design test, which are covered by sampling and which are checked one by one is what keeps a consignment from being argued over after it arrives. Part 4 of the test method series. Of use to fittings manufacturers, transmission and distribution utilities, and inspection bodies handling delivery acceptance.

This Document stipulates the test items, quantities and qualification rules for type tests,

sampling tests and routine tests of electric power fittings.

This Document applies to electric power fittings (hereinafter referred to as "fittings") used in

10kV and above AC and DC overhead power lines, substations (converter stations) and power

distribution devices in power plant.

2 Normative References

The provisions in following documents become the essential provisions of this Document

through reference in this Document. For the dated documents, only the versions with the dates

indicated are applicable to this Document; for the undated documents, only the latest version

(including all the amendments) is applicable to this Document.

GB/T 2314 General technical requirements for electric power fittings

GB/T 2317.1 Test method for electric power fittings - Part 1: Mechanical tests

GB/T 2317.2 Test method for electric power fittings - Part 2: Corona and RIV tests

GB/T 2317.3 Test method for electric power fittings - Part 3: Heat cycle tests

GB/T 4056 Ball and socket coupling dimensions of string insulator units

GB/T 5075 Terminology for electric power fittings

GB/T 35693 Technical specification for valve hall fittings of +/-800 kV ultra high voltage

direct current (UHVDC) transmission project

DL/T 756 Link fittings

DL/T 763 Technical requirements for overhead line helical fittings

DL/T 765.2 Overhead distribution lines fittings-Part 2:Overhead conductor fittings of rated

voltages up to 35kV

DL/T 765.3 Overhead distribution lines fittings - Part 3: Overhead insulated conductor

fittings of rated voltages up to 35 kV

DL/T 768.7 Manufacture quality specification for electric power fittings hot dip galvanized

coatings on fabricated iron and steel articles

DL/T 1098 Requirements and tests for overhead line spacers

DL/T 1099 Technical requirements and tests for damper

3 Terms and Definitions

For the purposes of this Document, the terms and definitions given in GB/T 5075 apply.

4 Test Requirements

4.1 The general technical conditions of the fittings shall comply with the provisions of GB/T

2314.

4.2 The fitting test is divided into type test, sampling test and routine test. The test items,

quantity and requirements for link fittings, tension clamps, splicing fittings and protective

fittings shall be carried out according to Table 1. The test items, quantity and requirements for

draping clamps shall be carried out according to Table 2. The test items, quantity and

requirements for spacer bars shall be carried out according to Table 3. The test items, quantities

and requirements of anti-vibration hammer shall be carried out according to Table 4. The test

items, quantity and requirements for electric substation fittings shall be carried out according

to Table 5.

a) The valve hall fittings meet other test requirements specified in GB/T 35693;

b) Pre-twisted fittings meet other test requirements specified in DL/T 763;

c) Overhead bare conductor fittings with rated voltage 35kV and below meet other test

requirements specified in DL/T 765.2;

d) Overhead insulated conductor fittings with rated voltage 35kV and below meet other test

requirements specified in DL/T 765.3;

e) The balls and sockets connected by the ball and socket are inspected piece by piece for "pass"

and "stop" gauges. The dimensions of the "pass" and "stop" gauges comply with the provisions

of GB/T 4056.

5 Acceptance Rules

5.1 Type test

5.1.1 General requirements

The purpose of the type test is to confirm the design performance of the fittings. It is usually

conducted once when the new product is trial-formulated. It shall be repeated when the design,

material or process is changed.

5.1.2 The number of tests

The number of fitting tests shall meet the requirements in Tables 1 ~ 5.

5.1.3 Qualification judgment

If all the test pieces meet the requirements, then such product shall be qualified.

5.2 Sampling test

5.2.1 General requirements

The purpose of sampling testing is to verify the performance of materials and products.

Sampling tests are conducted by batch; and test samples are randomly selected from the batches

submitted for inspection. The purchaser has the right to select the samples to be tested and

requires the manufacturer to provide a type test report.

5.2.2 The number of tests

When a batch of products is less than 100 pieces, sampling testing shall not be performed. When

the batch size is 100 pieces or more, the sampling quantity is shown in Table 6.

......

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Normative references

GB/T 2314 General technical requirements for electric power fittings · GB/T 2317.1 Test method for electric power fittings - Part 1: Mechanical tests · GB/T 2317.2 Test method for electric power fittings - Part 2: Corona and RIV tests · GB/T 2317.3 Test method for electric power fittings - Part 3: Heat cycle tests · GB/T 4056 Ball and socket coupling dimensions of string insulator units

Similar standards

GB 38031-2025|GB/T 2317.4|GB/T 2317.4-2008|GB/T 2317.4-2000|GB/T 2314|GB/T 2317.1|GB/T 2317.2|GB/T 2317.3

How to Buy GB/T 2317.4-2023

  1. 1Add to cart. Click the "Buy GB/T 2317.4-2023" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 2317.4-2023

$155.00

$130.00for partners