GB/T 2317.2-2008Test method for electric power fittings -- Part 2: Corona and RIV tests for electric power fittings (English PDF)
电力金具试验方法 第2部分:电晕和无线电干扰试验
This is a limited preview
Buy now to download the full PDF (7 pages)
Need quotation for your management?
Get a formal quotation for GB/T 2317.2-2008 in 30 minutes.
Issued by
Standardization Administration of China
Level / Type
National · Recommended
Issue date
December 30, 2008
Implementation date
October 1, 2009
Scope
GB/T 2317.2-2008 is the English-translated version of 电力金具试验方法 第2部分:电晕和无线电干扰试验.
GB/T 2317.2-2008 — This section GB/T 2317 provisions of the corona and radio interference test methods, procedures and criterion of overhead power lines electrical fittings.
This section applies to 330kV ~ 750kV AC high voltage overhead lines used fittings, substation fittings can be used for implementation.
Found what you need?
Document preview — GB/T 2317.2-2008
National Standard of the People's Republic of China
- ICS
- 29.240.20
- Classification
- K 51
- Replacing
- GB/T 2317.2-2000
Issued by: Standardization Administration of China
Contents
- Foreword
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
Foreword
GB/T 2317 "Test methods for electrical fittings" There are four parts, namely.
GB/T 2317.1 "electrical fittings - Test methods - Part 1. Mechanical Test" GB/T 2317.2 "electrical fittings - Test methods - Part 2. Test corona and radio interference" GB/T 2317.3 "electrical fittings - Test methods - Part 3. Thermal cycling test." GB/T 2317.4 "electrical fittings - Test methods - Part 4. Acceptance of the rules" this part of GB/T 2317 Part 2.
The partial modification of the use of IEC 61284:1997 "Requirements and test overhead line fittings" and learn about the terms in the IEC 61284 Definitions, test methods, acceptance criterion as well as part of the test arrangement. This section considers the actual situation of China's specific, and IEC 61284:1997, including the difference between.
(1) test method using only voltage, but not with the gradient method;
(2) test arrangement did not use metal wall and tower frame mapping surface;
(3) provides a method to determine the test voltage.
This Part replaces GB/T 2317.2-2000.
Compared with GB/T 2317.2-2000, this revision of the following major elements.
--- Gold with applicable voltage levels from 500kV to the 750kV, and 750kV voltage corresponding to an increase of the content;
--- On the part of the definition of the text has been adjusted so that the definition of the terms of the more explicit;
--- Visible corona and radio interference tests, clear simulated cross arm of a predetermined size;
--- The original "acceptance criterion 4.7" to "4.6 Criteria", the content of this article was revised to "at a predetermined voltage, the test should be no See the corona, radio interference voltage is less than the predetermined value (usually 1000µV, also determined by the demand side), the test is passed. ";
--- Deleted "5 test report." this section Appendix A normative appendix.
This part is proposed by the China Electricity Council.
This part of the overhead lines by the National Standardization Technical Committee.
This section is responsible for drafting units. China Electric Power Research Institute.
Participated in the drafting of this section. State Grid Wuhan High Voltage Research Institute.
1 Scope
This section GB/T 2317 provisions of the corona and radio interference test methods, procedures and criterion of overhead power lines electrical fittings.
This section applies to 330kV ~ 750kV AC high voltage overhead lines used fittings, substation fittings can be used for implementation.
2 Normative references
The following documents contain provisions which, through reference to GB/T 2317 to the present, constitute provisions of this section. For dated reference documents Member, all subsequent amendments (not including errata content) or revisions do not apply to this section, however, encouraged to reach under this section Parties to research agreement to use the latest versions of these documents. For undated reference documents, the latest versions apply to this section.
GB 311.1 voltage power transmission equipment insulation coordination (GB 311.1-1997, IEC 60071-1:1993, NEQ) GB/T 2900.19 Electrotechnical term high voltage test technique and insulation coordination (GB/T 2900.19-1994, IEC 60071-1.
1993, NEQ)
GB/T 6113 (all parts) radio disturbance and immunity measuring apparatus and methods - (CISPR16-1 all parts, IDT) JB/T 3567 Test Method for high-voltage insulators radio interference
3 Terms and Definitions
GB/T 2900.19, and established the following terms and definitions apply to this section.
Gas electrical fittings air near the surface of the insulation breakdown resulting from partial discharge phenomenon, generally available to the naked eye, binoculars or ultraviolet imager and other equipment was observed.
Voltage applied on the test voltage gradually increased until the occurrence of the corona seen during the test.
When visible corona occurs after the test, gradually reduce the applied voltage until the voltage corona visible disappear when.
RIV
When the test corona surrounding the strength of the radio receiving equipment causes interference to radio signal interference voltage is measured, the unit is µV.
In the field of communications, usually with radio interference level to measure the intensity of radio interference, in decibels (dB). Interference level and dry Relations interference voltage is as follows.
A = 20logUU0
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 7 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 2317Test method for electric power fittings -- Part 1: Mechanical tests
- GB 311.1Insulation co-ordination -- Part 1: Definitions, principles and rules
- GB 311.1-1997Insulation co-ordination -- Part 1: Definitions, principles and rules
- GB/T 2900.19Electrotechnical terminology - High-voltage test technique and insulation co-ordination
- GB/T 2900.19-1994Electrotechnical terminology - High-voltage test technique and insulation co-ordination
- JB/T 3567High-voltage insulators - Radio interference test method
IEC 60071 · GB/T 6113
Cited by
- GB/T 46382-2025Test methods for conductors for overhead transmission lines
- GB/T 2317.4-2023Test method for electric power fittings - Part 4: Acceptance inspection
- DL/T 763-2013Technical requirements for overhead line helical fittings
- GB/T 2314-2008General technical requirements for electric power fittings
How to Download GB/T 2317.2-2008
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB 311.1-2012 — Insulation co-ordination -- Part 1: Definitions, principles and rules
GB/T 2317.1-2008 — Test method for electric power fittings -- Part 1: Mechanical tests
GB/T 2317-1985 — Test method for electric power fittings -- Part 1: Mechanical tests
Secure payment via Stripe
Payments accepted
GB/T 2317.2-2008
$165.00