GB/T 2007.4-2008General rules for the sampling and sample preparation of minerals in bulk - Experimental methods for checking the precision and bias (English PDF)
散装矿产品取样、制样通则 偏差、精密度校核试验方法
This is a limited preview
Buy now to download the full PDF (29 pages)
Need quotation for your management?
Get a formal quotation for GB/T 2007.4-2008 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
August 20, 2008
Implementation date
April 1, 2009
Scope
GB/T 2007.4-2008 is the English-translated version of 散装矿产品取样、制样通则 偏差、精密度校核试验方法.
GB/T 2007.4-2008 is the Chinese standard "General rules for the sampling and sample preparation of minerals in bulk - Experimental methods for checking the precision and bias".
Its scope clause reads: This part specifies the terms and test methods for bias and precision checking. This part is applicable to the checking of the precision of the sampling and sample preparation methods listed in GB/T 2007.1 and GB/T 2007.2, as well as the bias checking test of sampling methods and sampling devices that need to be checked.
It can also be used for checking the bias of the sample preparation method and reduction device. Its clauses include terms and definitions; bias checking test method; precision checking test method.
It was issued by the General Administration of Quality Supervision, Inspection and Quarantine on AUGUST 02, 2008 and took effect on APRIL 01, 2009.
Found what you need?
Document preview — GB/T 2007.4-2008
National Standard of the People's Republic of China
- ICS
- 73.020
- Classification
- D 01
- Replacing
- GB/T 2007.5-1987
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Foreword3
- 1 Scope4
- 2 Normative references4
- 3 Terms and definitions5
- 4 Bias checking test method5
- 5 Precision checking test method10
- Appendix A (Informative) Example for checking sampling bias19
- Appendix B (Informative) Test method of particle size-composition index21
- Appendix C (Informative) Examples of precision checking test22
- Appendix D (Informative) Single batch test method for precision checking27
- References29
1 Scope
This part specifies the terms and test methods for bias and precision checking.
This part is applicable to the checking of the precision of the sampling and sample preparation methods listed in GB/T 2007.1 and GB/T 2007.2, as well as the bias checking test of sampling methods and sampling devices that need to be checked. It can also be used for checking the bias of the sample preparation method and reduction device.
2 Normative references
The provisions in following documents become the provisions of this part through reference in this part. For the dated references, the subsequent amendments (excluding corrections) or revisions do not apply to this part; however, parties who reach an agreement based on this part are encouraged to study if the latest versions of these documents are applicable. For undated references, the latest edition of the referenced document applies.
GB/T 2007.1 General rules for the sampling and sample preparation of minerals in bulk - Sampling by manual method
GB/T 2007.2 General rules for the sampling and sample preparation of minerals in bulk - Sample preparation by manual method
GB/T 2007.3 General rules for the sampling and sample preparation of minerals in bulk - Experimental method for evaluation of quality variation
GB/T 2007.6 General rules for the sampling and sample preparation of minerals in bulk - The method for determination of moisture by thermal drying method
GB/T 2007.7 General rules for the sampling and sample preparation of minerals in bulk - The method for determination of size by manual sieving
GB/T 2009 Method of sampling and sample preparation of bauxite in bulk
4 Bias checking test method
4.2.2 Select ore for test
It is to prove that the method being checked is applicable to various types of ore. The ore with large fluctuations in quality shall be selected for testing. If the quality fluctuation type of the ore is not clear, it can be evaluated according to GB/T 2007.3, or the particle size-composition index (SEI) can be determined according to the simple test method of Appendix A.
4.2.4 Select the method of comparing test samples
The comparison test of the two methods can be compared with a single sample set, or a duplicate sample or a large sample.
If the sampling points of the two methods are close to each other in time or space, sample set comparison can be used. Otherwise, the duplicate sample or large sample comparison method shall be used. In order to save manpower, material resources and time, it is recommended to adopt the duplicate sample comparison. Each duplicate sample consists of less than 5 sample sets.
4.4.6 Calculate the value of t0 according to formula (5), calculate to the third decimal place:
4.4.7 Use Table 2 (two-sided distribution table) to find the value of t, the probability of which is 95%.
Comparing the absolute value of t0 with the value of t; if t0 < t, then it is considered that there is no significant difference between method B and method A, meanwhile method B can be adopted as a conventional method.
4.2.1 Select reference method
4.2.1.1 The recognized reference sampling method is the stop-belt sampling method, that is, stop the loaded conveyor belt, from the specified position, in the ore flow on the stopped conveyor belt, take each sample set from the full cross-section; the intercepted length in the direction of the conveyor belt shall be greater than 3 times the nominal maximum particle size or at least 30 mm, whichever is larger. Take out all the ore in the intercepted area as a reference sample set.
Note: According to the site conditions and the requirements of 4.1.1, or the appropriate method can also be designated as the reference method through negotiation by the relevant parties.
4.2.1.2 When checking the sample preparation method, use the first method (riffle method) in GB/T 2007.2 as the reference method. When calibrating the reducer, take all discarded samples as reference samples.
4.2.3 Determine the quality characteristics of test
Generally, the main component of the ore is selected as the quality characteristic of the test. It may also choose particle size or other chemical and physical testing items as quality characteristics.
4.2.5 Determine the number of test groups required
The number of pre-tested groups K shall not be less than 20 groups. The required number of test groups is calculated and determined according to the
Where: Sd - The standard bias of the difference; K - The number of pairs of measured values.
4.4.5 Determine the number of pairs required
The required number of pairs of sample sets, the number of duplicate samples or the number of large samples are determined according to the precision of the sampling method, the uniformity of the ore, the maximum allowable bias value.
4.4.5.1 Make the K pairs of data into a list. Calculate the difference, average difference, standard bias of the difference according to formula (1), formula (2), formula (3).
4.4.5.2 Calculate the coefficient D according to formula (4):
Where: delta - Maximum allowable bias.
4.4.5.3 Check out the required number of pairs of measured values, nt, (corresponding to the D value) from Table 1.
When the state nt <= 20, calculate the value of t0 according to 4.4.6; perform an additional test when nt > 20.
5 Precision checking test method
5.1.6 The test can be carried out in conjunction with daily work; even if the method has been verified, it shall be checked as needed.
5.1.3 Size of sample set
According to the maximum particle size of the ore, it shall be carried out in accordance with the requirements of GB/T 2007.1.
5.1.4 Sampling interval
Divide the batch by 2n to get the sampling interval (if it takes n sample sets, divide the batch size by n); discard the decimal.
5.1.5 Preparation of specimens and determination
The preparation of the specimen is carried out in accordance with the provisions of GB/T 2007.2. The determination is carried out in accordance with relevant standards.
5.2 Test method
5.2.1 Sampling
According to the needs of the checking, for the sampling methods to be checked, take sample in accordance with the relevant standards (systematic sampling method, stratified sampling method, secondary sampling method), to get the large samples A and B.
5.2.2 Sample preparation and determination
According to the purpose of the checking test, select the following method 1, method 2 or method 3 for sample preparation and determination.
Divide the large sample A and B, to obtain four specimens of A1, A2, B1, B2.
Conduct a double sample determination for each specimen. Method 1 can obtain the precision of sampling, sample preparation and determination (see Figure 1).
5.2.2.1 Method 1
Appendix C (Informative) Examples of precision checking test
C.1 Product name: Bauxite
C.2 Measurement item: Al2O3
C.3 Number of test batches: 15 batches.
C.4 Batch size: An average of 418 tons per batch. The minimum batch size is 320 t and the maximum batch size is 500 t. C.5 Maximum particle size: 150 mm. C.6 Sample set size: 15 kg.
C.7 The number of sample sets taken for each batch of alumina: 2n = 20 x 2 = 40
C.8 Sampling method: In the process of loading the ore on the ship, take sample sets from the grab surface at the calculated interval; place the odd number of sample sets in container A, to form a large sample A; place the even number of sample sets into another container B, to form a large sample B. Each of large samples A and B contains 20 sample sets.
C.9 Sample preparation: Crush the two large samples A and B respectively by a jaw crusher to less than 22.4 mm; after thorough mixing them, divide them into four groups of samples A1, A2 and B1, B2, about 150 kg each, using a riffle according to the Method 1 of 5.2.2.1. Then prepare four component analysis samples A1, A2, B1, B2 according to the procedures as specified in GB/T 2009.
C.10 Precision requirements: beta SPM = ±1.0%, beta S = ±0.6%
C.11 Data analysis (95% probability): 15 batches of test data are listed in Table C.1.
C.11.1 According to formula (6) and formula (7), calculate the average value and range of the double test; fill the results in the rows of Xij and R1 of Table C.1.
C.11.2 According to formula (8) and formula (9), calculate the average value and range of component analysis samples A1, A2 and B1, B2; fill the results in the rows and R2 of Table C.1.
C.11.3 According to formula (10) and formula (11), calculate the average value and range of large sample A and B; fill the results in the rows and R3 of Table C.1.
C.11.4 According to formula (12), formula (13), formula (14), calculate the average value,, of the range.
C.11.5 According to formula (15), formula (16), formula (17), calculate the control upper limit of R1, R2, R3:
Upper limit of R1: x 3.267 = 0.100 x 3.267 = 0.3267 Upper limit of R2: x 3.267 = 0.2636 x 3.267 = 0.8612 Upper limit of R3: x 3.267 = 0.323 x 3.267 = 1.055 Make a chart and mark all data in the R control chart (see Figure C.1).
Check whether the values of R1, R2, R3 are in the control state. After checking, all R3 are in the control state. The 15th batch of B1 component analysis sample's R1 value of 0.37 and the 9th batch of B2 large sample's R2 value of 1.43 are abnormal.
After checking, the 15th batch of B component analytical samples splashed during boiling before titration in a test during the determination process. Before preparing specimen of the 9th batch of B2 large samples, contamination occurs because the crusher was not cleaned, so the above two data can be discarded. After discarding, is 0.096, the upper control limit is:
0.096 × 3.267 = 0.314 is 0.223, the upper control limit is:
0.223 × 3.267 = 0.7285 After discarding, the remaining values of R1 are all less than 0.314; the values of R2 are all less than 0.7285. According to formulas (18), (19), (20), calculate the estimated values of determination, reduction, sampling standard bias: […]
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 29 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 2007.1General rules for the sampling and sample preparation of minerals in bulk-Sampling by manual method
- GB/T 2007.2General rules for the sampling and sample preparation of minerals in bulk-Manual method of sample preparation
- GB/T 2007.3General rules for the sampling and sample preparation of minerals in bulk-Experimental method for evaluation of quality variation
- GB/T 2007.6General rules for the sampling and sample preparation of minerals in bulk - Determination of moisture content - Heat drying method
- GB/T 2007.7General rules for the sampling and sample preparation of minerals in bulk. The method for determination of size by manual sieving
- GB/T 2009Method of sampling and sample preparation of bauxite in bulk
Cited by
- GB/T 13449-2021Method for sampling and sample preparation of gold lump ores
- SN/T 0066-2015Methods for sampling and sample preparation of chrome ores in bulk for import
- SN/T 4111-2015Methods for sampling and preparing sample of copper ores for import
- SN/T 3997-2014Methods for sampling and sample preparation of laterite nickel ores in bulk
- YS/T 950-2014Methods for sampling and sample preparation of laterite nickel ores in bulk
- SN/T 3323.6-2013Mill scale. Part 6: Method for manual sampling of mill scale in bulk
Similar standards
Editions of GB/T 2007.4
| Edition | Title | Revision | Status |
|---|---|---|---|
| GB/T 2007.4-2008 | General rules for the sampling and sample preparation of minerals in bulk - Experimental methods for checking the precision and bias | current edition | Current |
| GB/T 2007.5-1987 | General rules for the sampling and sample preparation of minerals in bulk - Experimental methods for checking the precision and bias | previous edition | Superseded |
This page sells the current edition, GB/T 2007.4-2008. Earlier editions are listed for reference only.
How to Download GB/T 2007.4-2008
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 2007.1-1987 — General rules for the sampling and sample preparation of minerals in bulk-Sampling by manual method
GB/T 2007.2-1987 — General rules for the sampling and sample preparation of minerals in bulk-Manual method of sample preparation
GB/T 2007.3-1987 — General rules for the sampling and sample preparation of minerals in bulk-Experimental method for evaluation of quality variation
Secure payment via Stripe
Payments accepted
GB/T 2007.4-2008
$325.00