NB/T 10522.3-2021Automatic waterproof door for mining - Part 3: Code for engineering design, construction and acceptance (English PDF)
矿用自动控制防水闸门 第3部分:工程设计、施工及验收规范
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for NB/T 10522.3-2021 in 30 minutes.
Issued by
NEA
Level / Type
Industry · Recommended
Issue date
January 7, 2021
Implementation date
April 1, 2021
Scope
NB/T 10522.3-2021 is the English-translated version of 矿用自动控制防水闸门 第3部分:工程设计、施工及验收规范.
NB/T 10522.3-2021, Part 3 of the Chinese series on automatically controlled mine waterproof gates, covers the engineering around the gate rather than the product itself.
It sets the conditions under which a gate and its chamber must be provided, chamber location, gate selection, chamber design, power distribution and control and ancillary facilities.
It then covers chamber construction with concrete and equipment foundation work, gate installation, and project acceptance through installation quality inspection, joint trial operation, the withstand test, acceptance records and quality assessment.
An informative annex gives the method for calculating waterproof gate chamber parameters, and another provides the acceptance evaluation form. It is used for the design, construction, installation and acceptance of these gates. Issued on 7 January 2021, it has applied since 1 April 2021.
Found what you need?
Document preview — NB/T 10522.3-2021
National Standard of the People's Republic of China
- Classification
- D 98
Issued by: National Energy Administration of the People's Republic of China
Contents
- Preface
- 1 Scope
- 2 Normative references
- 3 Basic Rules
- 4 Engineering Design
- 4.1 Setting Condition
- 4.2 Chamber location
- 4.3 Gate selection
- 4.4 Chamber Design
- 4.5 Power distribution and control
- 4.6 Ancillary Facilities
- 5 Chamber construction
- 5.1 Construction preparation
- 5.2 Concrete construction
- 5.3 Requirements for equipment foundation construction
- 6 Gate installation
- 6.1 Installation preparation
- 6.2 Installation requirements
- 6.3 Other requirements
- 7 Engineering acceptance
- 7.1 Equipment installation quality inspection
- 7.2 Joint trial operation
- 7.3 Withstand voltage test
- 7.4 Project acceptance information
- 7.5 Project Quality Assessment
- Appendix A (Informative Appendix) Calculation Method of Waterproof Gate Chamber Parameters
- Appendix B (informative appendix) Waterproof Gate Project Quality Acceptance Evaluation Form
Foreword
NB/T 10522 "Automatic Control Waterproof Gate for Mining" is divided into four parts.
--- Part 1: Mechanical devices;
--- Part 2: Electro-hydraulic control system;
--- Part 3: Specifications for engineering design, construction and acceptance;
--- Part 4: Operation and maintenance requirements.
This part is part 3 of NB/T 10522.
This section is drafted in accordance with the rules given in GB/T 1.1-2009.
1 Scope
This part of NB/T 10522 specifies the principles and principles to be followed in the engineering design, construction, installation and acceptance of mine automatic control waterproof gates. Require.
This part applies to the engineering design, construction, installation and acceptance of mine automatic control waterproof gate.
2 Normative references
The following documents are essential for the application of this document. For dated references, only the dated version applies to this document. For undated references, the latest edition (including all amendments) applies to this document.
GB 50010 Specification for Design of Concrete Structures
GB 50204 Code for acceptance of construction quality of concrete structure engineering
GB 50231-2009 General Specification for Construction and Acceptance of Mechanical Equipment Installation Engineering
GB 50946 Code for Quality Acceptance of Coal Mine Equipment Installation Engineering
GB 51062 Construction Specification for Coal Mine Equipment Installation Engineering
GB 51070-2014 Design code for water control in coal mines
MT5010 Coal mine installation engineering quality inspection and evaluation standard
3 Basic regulations
3.1 The waterproof gate project should be designed by a unit with corresponding qualifications according to the mine hydrogeological conditions and water safety requirements.
The design should follow the principles of safety, reliability, and technical and economic rationality.
3.2 The construction of the waterproof gate should be reviewed and approved by the main person in charge of the coal mine, and the project should be completed by the chief engineer of the coal mine before being put into use. acceptance.
3.3 Technical documents such as corresponding technical standards, construction organization design, installation plan, safety technical measures, etc. shall be prepared before the installation of the waterproof gate.
3.4 All kinds of mechanical equipment, electric control equipment, parts and main materials in the waterproof gate and its control system, and its measurement, testing equipment, instruments Instruments, meters, etc., should comply with relevant regulations such as coal mine safety regulations, and their accuracy levels should meet the accuracy requirements of the tested items.
3.5 During the construction of the waterproof gate project, the quality of the project shall be inspected and recorded. For concealed works, inspection should be carried out before the works are concealed And make a record, only after passing the construction can continue. During the acceptance of the project, the acceptance and necessary random inspection shall be carried out on the basis of the relevant records.
4 Engineering Design
4.1 Setting Conditions
In one of the following situations, waterproof gates and chambers should be set up.
a) Mine with complex or extremely complex hydrogeological conditions or the danger of water inrush and well flooding, and the underground car park without disaster-resistant drainage system. around;
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Referenced standards
Normative references
- GB 50010Code for design of concrete structures
- GB 50204Code for quality acceptance of concrete structure construction
- GB 50231-2009General code for construction and acceptance of mechanical equipment installation engineering
- GB 50946Code for acceptance of construction quality of coal mine equipment installation
- GB 51062Code for construction of coal mine equipment installation engineering
- GB 51070-2014Code for design of water prevention and control of coal mine
MT5010
Similar standards
How to Download NB/T 10522.3-2021
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB 50010-2010 — Code for design of concrete structures
GB 50204-2015 — Code for quality acceptance of concrete structure construction
GB 50231-2009 — General code for construction and acceptance of mechanical equipment installation engineering
Secure payment via Stripe
Payments accepted
NB/T 10522.3-2021
$225.00