Scope

NB/T 10731-2021 is the English-translated version of 煤矿井下防水密闭墙设计施工及验收规范.

NB/T 10731-2021 governs the design, construction and acceptance of waterproof dams, the sealing walls built in underground coal mine roadways to hold back water or permanently close off mined areas.

After general provisions it covers design principles, content and requirements, the construction process, and quality acceptance with project records. Informative appendices describe the structure, sizing and building of conventional waterproof dams, of composite-structure permanent sealing walls and of pre-separation walls.

Concepts defined include undercut slotting, which keys the dam into the surrounding rock to raise its resistance to water pressure. It applies to water-blocking walls for mining and development faces and to permanent closures when a face is sealed. Issued on 16 November 2021, it has applied since 16 February 2022.

Found what you need?

Document preview — NB/T 10731-2021

National Standard of the People's Republic of China

Classification
D 00;D09

Issued by: National Energy Administration of the People's Republic of China

Contents

  • Preface
  • 1 Scope
  • 2 Normative references
  • 3 Terms and Definitions
  • 4 General Provisions
  • 5 Design of waterproof airtight wall
  • 5.1 Design Principle
  • 5.2 Design Content
  • 5.3 Design Requirements
  • 6 Construction of waterproof airtight wall
  • 6.1 Construction process
  • 6.2 Construction Requirements
  • 6.3 Other requirements
  • 7 Quality acceptance of waterproof airtight walls
  • 7.1 Contents of Quality Acceptance
  • 7.2 Project acceptance information
  • Appendix A (Informative) Design and Construction Method of Underground Waterproof Sealing Wall in Coal Mine
  • A.1 Waterproof and airtight wall structure
  • A.2 Selection of size parameters of waterproof airtight wall
  • A.3 Construction process of waterproof airtight wall
  • Appendix B (informative) Design and Construction Method of Waterproof Confining Wall of Underground Composite Structure in Coal Mine
  • B.1 Composite structure underground waterproof sealing wall structure
  • B.2 Permanent containment wall construction process
  • Appendix C (Informative) Design and Construction Method of Underground Waterproof Pre-Separation Wall in Coal Mine
  • C.1 Pre-separation wall structure
  • C.2 Pre-separation wall construction process

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1: Structure and Drafting Rules of Standardization Documents" drafted.

1 Scope

This document specifies the general regulations, design, construction, quality acceptance and other technical requirements for the underground waterproof sealing wall of coal mines.

This document is applicable to the waterproof sealing wall of underground tunnels in coal mines for water blocking construction of mining and excavation working faces, and can also be used for construction when the mining face is closed. of permanently closed containment walls.

2 Normative references

The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, dated citations documents, only the version corresponding to that date applies to this document; for undated references, the latest edition (including all amendments) applies to this document.

GB/T 17395 Seamless steel pipe size, shape, weight and allowable deviation

GB 50003 Code for Design of Masonry Structures

GB 50010 Specification for Design of Concrete Structures

GB/T 50107 Concrete Strength Inspection and Evaluation Standard

GB 50204 Code for acceptance of construction quality of concrete structure engineering

GB 50213 Code for acceptance of quality of coal mine tunnel engineering

GB 50215 Code for Design of Coal Industry Mine

GB 50451 Code for Design of Underground Drainage Pump Station and Drainage Pipeline in Coal Mine

3 Terms and Definitions

The following terms and definitions apply to this document.

3.1 Waterproof dam

In the case of mining and excavation working face mining, harvesting, etc., masonry at the appropriate position of the roadway (outside the harvesting line) is used for water blocking or permanent sealing. waterproof facilities.

3.2 Undercut slotting

A groove is dug in the surrounding rock of the roadway, and after pouring and overall grouting reinforcement, the waterproof sealing wall and the surrounding rock of the roadway are integrated to increase the size of the roadway.

A technical means for the waterproof sealing wall to resist water pressure.

3.3 Allowable water pressure

The maximum allowable head pressure that will not cause damage to the waterproof containment wall.

3.4 Pre-separation zone

In order to ensure the sealing and sealing effect of the waterproof airtight wall on the water body of the goaf, the space between the goaf and the production area is reserved, and the waterproof airtight wall supports the water body.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download NB/T 10731-2021

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

NB/T 10731-2021

$240.00