NB/T 51042-2015The specification for construction and acceptance of architectural engineering in coal preparation plant (English PDF)

选煤厂建筑工程施工与验收规范

Open the NB/T 51042-2015 preview as PDF

Preview — first pages of NB/T 51042-2015 (full document: 66 pages)

This is a limited preview

Buy now to download the full PDF (66 pages)

Issued by

NEA

Level / Type

Industry · Recommended

Issue date

October 27, 2015

Implementation date

March 1, 2016

Scope

NB/T 51042-2015 is the English-translated version of 选煤厂建筑工程施工与验收规范.

NB/T 51042-2015 covers the construction and acceptance of the building works of a coal preparation plant. A washery is an industrial building of a particular kind: heavy vibrating equipment on elevated floors, thickener and flotation tanks holding slurry, conveyor galleries running between structures at a slope, silos and bunkers carrying stored coal, and everything exposed to coal dust and to water. The specification sets the general provisions and the defined terms, then works through the trades. Earthworks and foundations come first, followed by concrete and reinforcement, masonry, steel structures and their erection, precast elements, roofing and waterproofing, floors and their wear-resistant finishes, doors and windows, plastering and painting, insulation, and lifts and conveying installations. Structures specific to the plant have their own chapters: silo and bunker construction including slipformed shells, the conveyor galleries and transfer towers, and the tanks and basins with their walls and linings. For each item of work the specification gives the construction requirements, the materials and their acceptance, the permitted dimensional deviations with the method and number of measurements, and the checks that constitute acceptance of the inspection lot. The division of the works into inspection lots, sub-items and sub-projects, the treatment of non-conforming work, and the records and documentation required at handover complete the document. It applies to coal preparation plants built in China.

Document preview — NB/T 51042-2015

National Standard of the People's Republic of China

ICS
73.020
Classification
P 00/09

Issued by: National Energy Administration of the PRC

Contents

  • 1 General Provisions1
  • 2 Terms2
  • 3 Basic Requirements4
  • 3.1 General Part4
  • 3.2 Building Foundation5
  • 3.3 Main Project5
  • 3.4 Building Decoration6
  • 3.5 Roof Engineering6
  • 3.6 Water Supply Drainage and Heating Works6
  • 3.7 Ventilation and Air Conditioning Works6
  • 3.8 Electrical Installation in Building6
  • 3.9 Intelligent Building Systems6
  • 3.10 Energy Efficient Building7
  • 3.11 Escalators and Passenger Conveyors7
  • 4 Coal Storage Yard8
  • 4.1 General Requirements8
  • 4.2 Coal Storage Yard Ground and Retaining Structure Engineering8
  • 4.3 The Coal Pit and Tunnel Engineering8
  • 4.4 Coal Drop Tube10
  • 5 Silo11
  • 5.1 General Requirements11
  • 5.2 Foundation Works11
  • 5.3 Supporting Wall13
  • 5.4 Hopper Construction15
  • 5.5 Silo-top Construction18
  • 5.6 Liner Construction19
  • 5.7 Observation of Slip-forming21
  • 6 Trough Bunker22
  • 6.1 General Requirements22
  • 6.2 Tunnel Wall Construction22
  • 6.3 Wall of Silo Construction23
  • 6.4 Liner Construction26
  • 6.5 Coal Isolation Wall and Coal Retaining Wall Construction27
  • 6.6 Coal Drop Tube Construction27
  • 6.7 Steel Trestle Construction27
  • 6.8 Envelope Construction28
  • 7 Screening Broken Workshop, Main Machine Hall, Filter Workshop29
  • 7.1 General Requirements29
  • 7.2 Steel Structures Construction29
  • 7.3 Reinforced Concrete Construction33
  • 8 Coal Belt Conveyor Gallery34
  • 8.1 General Requirements34
  • 8.2 Steel Structures Construction34
  • 8.3 Reinforced Concrete Construction36
  • 9 Concentrated Tank37
  • 9.1 General Requirements37
  • 9.2 Foundation Works38
  • 9.3 Pipe Ditch Construction38
  • 9.4 Concentrated Tank Floor Construction38
  • 9.5 Supporting Wall Construction39
  • 10 Loading Bunker41
  • 11 Additional Building42
  • 12 Quality Acceptance43
  • 12.1 Classification of Quality Acceptance43
  • 12.2 Acceptance of Project Quality46
  • 13 Green Construction49
  • 13.1 General Requirements49
  • 13.2 Environmental Protection49
  • 13.3 Material-saving and Material Utilization50
  • 13.4 Water-saving and Water Resources Utilization51
  • 13.5 Energy-saving and Energy Utilization51
  • 13.6 Land-saving and Land Utilization51
  • Appendix A Division of Unit Project, Part and Sub-item Project53
  • Explanation of Wording in This Code57
  • List of Normative Standard58
  • Addition: Explanation of Provisions60

Foreword

This document was issued on 27 October 2015 by the National Energy Administration of the PRC and takes effect on 1 March 2016.

It is a NB/T standard: recommended rather than compulsory, but it is the text a Chinese reviewer applies when assessing a submission.

It is classified under ICS 73.020, Chinese classification P 00/09.

This specification has been prepared in accordance with the requirements of the Notice of the National Energy Administration on Issuing the Second Batch of the 2011 Plan for the Development (Revision) of Industry Standards in the Energy Field (Guo Neng Ke Ji [2011] No. 252). The work was organized by the China Coal Construction Association, with China Coal Construction and Installation Engineering Group Co., Ltd., Huaibei Mining (Group) Engineering Construction Co., Ltd. and other relevant units acting as the preparing bodies.

In the course of preparation the drafting group carried out thorough investigation and research, summarized several decades of practical experience in the construction of architectural engineering in coal preparation plants, referred to relevant standards at home and abroad, and gave full consideration to the structural characteristics of the buildings and structures of coal preparation plants. On the basis of a wide solicitation of opinions, and through repeated discussion, revision and refinement, the text was finalized after formal examination.

The specification is made up of 13 chapters and 1 appendix. Its main contents cover general provisions, terms, basic requirements, the coal storage yard, the silo, the trough bunker, the screening and crushing workshop, the main plant building, the filter workshop, the conveyor trestle or gallery, the thickener (concentrated) tank, the loading station, auxiliary buildings, engineering quality acceptance and green construction.

The National Energy Administration is responsible for the administration of this specification. The China Coal Construction Association is responsible for its day-to-day administration, and China Coal Construction and Installation Engineering Group Co., Ltd. is responsible for the interpretation of its specific technical content.

Users are invited to send comments and suggestions arising during implementation to China Coal Construction and Installation Engineering Group Co., Ltd., No. 56 Congtai Road, Handan City, Hebei Province, postcode 056002.

Chief editing units: China Coal Construction and Installation Engineering Group Co., Ltd.; Huaibei Mining (Group) Engineering Construction Co., Ltd.

Participating units: China Coal No. 68 Engineering Co., Ltd.; China Coal No. 72 Engineering Co., Ltd.; China Coal No. 92 Engineering Co., Ltd.; the No. 33 Engineering Department of China Coal No. 3 Construction (Group) Co., Ltd.; Pingmei Shenma Construction Engineering Group Co., Ltd.; Tangshan Kailuan Construction (Group) Co., Ltd.; Shanxi Lu'an Engineering Co., Ltd.; China Coal Construction Group Engineering Co., Ltd.; Beijing Zhongmei Zhengchen Construction Co., Ltd.; Beijing Kangdi Construction Supervision and Consulting Co., Ltd.; Jinan Design and Research Institute of the Coal Industry Co., Ltd.

The foreword lists 39 chief drafters and 17 chief reviewers by name. The specification was approved by the National Energy Administration, the chief editing department being the China Coal Construction Association, and took effect on 1 March 2016.

Structure and Coverage of the Specification

The specification is arranged in 13 chapters and one appendix, followed by the explanatory back matter. The code prints both a Chinese table of contents and an English Contents, and the English headings reproduced below are those printed in the code itself.

Chapter 1, General Provisions, begins on page 1 and sets out the purpose of the code, its field of application, the promotion of new processes and materials, the requirement for technical archives, and the relationship of the code to other current national and industry standards.

Chapter 2, Terms, begins on page 2 and defines the eighteen terms used throughout the code, from the coal preparation plant itself to the individual structural elements of silos and trough bunkers and the high-strength bolt assembly.

Chapter 3, Basic Requirements, begins on page 4 and is divided into eleven sections covering the building trades common to the whole plant.

The sections of Chapter 3 are 3.1 General Part (page 4), 3.2 Building Foundation (page 5), 3.3 Main Project (page 5), 3.4 Building Decoration (page 6), 3.5 Roof Engineering (page 6), 3.6 Water Supply Drainage and Heating Works (page 6), 3.7 Ventilation and Air Conditioning Works (page 6), 3.8 Electrical Installation in Building (page 6), 3.9 Intelligent Building Systems (page 6), 3.10 Energy Efficient Building (page 7) and 3.11 Escalators and Passenger Conveyors (page 7).

Chapter 4, Coal Storage Yard, begins on page 8 and is divided into four sections dealing with the yard and the works beneath it.

The sections of Chapter 4 are 4.1 General Requirements (page 8), 4.2 Coal Storage Yard Ground and Retaining Structure Engineering (page 8), 4.3 The Coal Pit and Tunnel Engineering (page 8) and 4.4 Coal Drop Tube (page 10).

Chapter 5, Silo, begins on page 11 and is the longest chapter of the code, divided into seven sections that follow the silo from its foundation up to the observation of slip-forming.

The sections of Chapter 5 are 5.1 General Requirements (page 11), 5.2 Foundation Works (page 11), 5.3 Supporting Wall (page 13), 5.4 Hopper Construction (page 15), 5.5 Silo-top Construction (page 18), 5.6 Liner Construction (page 19) and 5.7 Observation of Slip-forming (page 21).

Chapter 6, Trough Bunker, begins on page 22 and is divided into eight sections covering the semi-underground V-shaped bunker defined in clause 2.0.7.

The sections of Chapter 6 are 6.1 General Requirements (page 22), 6.2 Tunnel Wall Construction (page 22), 6.3 Wall of Silo Construction (page 23), 6.4 Liner Construction (page 26), 6.5 Coal Isolation Wall and Coal Retaining Wall Construction (page 27), 6.6 Coal Drop Tube Construction (page 27), 6.7 Steel Trestle Construction (page 27) and 6.8 Envelope Construction (page 28).

Chapter 7, Screening Broken Workshop, Main Machine Hall, Filter Workshop, begins on page 29 and is divided into three sections treating the three principal process buildings together.

The sections of Chapter 7 are 7.1 General Requirements (page 29), 7.2 Steel Structures Construction (page 29) and 7.3 Reinforced Concrete Construction (page 33).

Chapter 8, Coal Belt Conveyor Gallery, begins on page 34 and is divided into three sections following the same steel and concrete division as Chapter 7.

The sections of Chapter 8 are 8.1 General Requirements (page 34), 8.2 Steel Structures Construction (page 34) and 8.3 Reinforced Concrete Construction (page 36).

Chapter 9, Concentrated Tank, begins on page 37 and is divided into five sections covering the thickener tank from its foundation to its wall.

The sections of Chapter 9 are 9.1 General Requirements (page 37), 9.2 Foundation Works (page 38), 9.3 Pipe Ditch Construction (page 38), 9.4 Concentrated Tank Floor Construction (page 38) and 9.5 Supporting Wall Construction (page 39).

Chapter 10, Loading Bunker, begins on page 41 and is written as a single undivided chapter dealing with the loading station.

Chapter 11, Additional Building, begins on page 42 and likewise forms a single undivided chapter covering the auxiliary buildings of the plant.

Chapter 12, Quality Acceptance, begins on page 43 and is divided into 12.1 Classification of Quality Acceptance (page 43) and 12.2 Acceptance of Project Quality (page 46).

Chapter 13, Green Construction, begins on page 49 and is divided into six sections covering environmental protection and the saving of materials, water, energy and land.

The sections of Chapter 13 are 13.1 General Requirements (page 49), 13.2 Environmental Protection (page 49), 13.3 Material-saving and Material Utilization (page 50), 13.4 Water-saving and Water Resources Utilization (page 51), 13.5 Energy-saving and Energy Utilization (page 51) and 13.6 Land-saving and Land Utilization (page 51).

Appendix A, Division of Unit Project, Part and Sub-item Project, begins on page 53 and sets out how the architectural engineering of a coal preparation plant is divided into unit projects, parts and sub-parts, and sub-item projects for the purposes of quality acceptance.

The Explanation of Wording in This Code begins on page 57 and states how the auxiliary verbs used in the mandatory and recommended provisions are to be understood.

The List of Normative Standard begins on page 58 and enumerates the national and industry standards referred to by the code.

The Addition: Explanation of Provisions begins on page 60 and contains the clause-by-clause commentary issued together with the code.

Chapters 4 to 11 follow the process sequence of a coal preparation plant, running from the coal storage yard through the silo, the trough bunker, the screening, main and filter workshops, the conveyor gallery, the thickener tank and the loading bunker to the auxiliary buildings, while Chapters 3, 12 and 13 apply across the whole of the works.

The Chinese and English tables of contents correspond section by section, although a small number of English headings render the Chinese loosely; the Chinese wording governs in case of divergence.

Publication and Administrative Data

International classification: ICS 73.020, mining and minerals.

Chinese Standard Classification code printed on the cover: P 00/09.

Record (filing) number printed on the cover: J2111-2016.

The specification was issued on 27 October 2015 by the National Energy Administration of the People's Republic of China as an energy industry standard.

The specification entered into force on 1 March 2016.

The chief editing department is the China Coal Construction Association and the approving department is the National Energy Administration.

The code was published by the Coal Industry Publishing House, No. 35 Shaoyaoju, Chaoyang District, Beijing, postcode 100029.

Printing was carried out by the Beijing Zhengzhuang Hongwei Printing Factory and distribution by the Xinhua Bookstores nationwide.

Book format 850 mm by 1168 mm, 1/32; 2 and 3/4 printed sheets; approximately 64 thousand characters.

First edition March 2016, first printing March 2016; internal number 7879; cover price 20.00 yuan.

The foreword names 39 chief drafters and 17 chief reviewers drawn from the chief editing and participating units.

Title as printed on the cover: the Chinese title, followed by the official English title, with the designation NB/T 51042-2015.

1 Scope

NB/T 51042-2015 covers the construction and acceptance of the building works of a coal preparation plant. A washery is an industrial building of a particular kind: heavy vibrating equipment on elevated floors, thickener and flotation tanks holding slurry, conveyor galleries running between structures at a slope, silos and bunkers carrying stored coal, and everything exposed to coal dust and to water. The specification sets the general provisions and the defined terms, then works through the trades. Earthworks and foundations come first, followed by concrete and reinforcement, masonry, steel structures and their erection, precast elements, roofing and waterproofing, floors and their wear-resistant finishes, doors and windows, plastering and painting, insulation, and lifts and conveying installations. Structures specific to the plant have their own chapters: silo and bunker construction including slipformed shells, the conveyor galleries and transfer towers, and the tanks and basins with their walls and linings. For each item of work the specification gives the construction requirements, the materials and their acceptance, the permitted dimensional deviations with the method and number of measurements, and the checks that constitute acceptance of the inspection lot. The division of the works into inspection lots, sub-items and sub-projects, the treatment of non-conforming work, and the records and documentation required at handover complete the document. It applies to coal preparation plants built in China.

Chapter 1, General Provisions, begins on page 1 of the specification and comprises five clauses numbered 1.0.1 to 1.0.5.

1.0.1 This specification is formulated in order to further standardize the construction of architectural engineering in coal preparation plants, to unify the standards for the construction and acceptance of architectural engineering in coal preparation plants, to guarantee engineering quality and to achieve safe, civilized and green construction.

1.0.2 This specification applies to the construction and acceptance of the principal architectural engineering works of newly built, extended and reconstructed coal preparation plants.

1.0.3 New processes, new technologies, new equipment and new materials should be promoted and applied in the construction of architectural engineering in coal preparation plants.

1.0.4 Technical archives shall be established during the construction of architectural engineering in coal preparation plants, and the collection and arrangement of the various records, as-built drawings and other documentary material shall be properly carried out. The as-built documentation shall be truthful, complete and integral, and shall be traceable.

1.0.5 In addition to complying with the provisions of this specification, the construction and acceptance of architectural engineering in coal preparation plants shall also comply with the provisions of the relevant current national and industry standards.

2 Terms

Chapter 2, Terms, begins on page 2 and establishes eighteen defined terms, numbered 2.0.1 to 2.0.18, each given in Chinese with its English equivalent and a full definition.

2.0.1 coal preparation plant. A plant which reduces the content of impurities in raw coal, such as ash and sulphur, and which processes the coal by separation in order to produce products of different qualities and specifications so as to satisfy different industrial uses.

2.0.2 silo. An upright container for the storage of bulk material whose plan shape is circular, rectangular, polygonal or of another geometric form; the part of it that accommodates the stored material is the silo body.

2.0.3 top of silo. The structure that closes the top of the silo body.

2.0.4 building above top of silo. A building erected on the top of the silo in accordance with the requirements of the process.

2.0.5 hopper. The container in the lower part of the silo body used for discharging the stored material.

2.0.6 cylinder structure. The collective designation of the lower wall beneath the hopper, including the buttress columns, together with the silo wall.

2.0.7 trough. A semi-underground V-shaped storage bunker made up of an underground wall or pile slab type coal return tunnel, the bunker walls, the upper coal distribution trestle, the internal coal isolation walls, the coal retaining walls and the enclosure structure.

2.0.8 normal construction method for trough. Construction carried out in the normal construction sequence: the earthwork is first excavated in layers and the slope support is constructed in layers, after which the ground foundation, the tunnel, the upper structure and the enclosure structure are built from the bottom upwards at the positions predetermined in the design drawings within the foundation pit.

2.0.9 reverse construction method for trough. Construction carried out in a sequence other than the normal one: the earthwork is first excavated in layers and the slope support is constructed in layers, then the engineering piles are constructed so as to form the supporting structure for the roof slab of the tunnel, and the roof slab of the coal return tunnel is then built using ground formwork; at that point the earthwork and bottom slab of the coal return tunnel and the upper structure may be built at the same time, until the works are completed.

2.0.10 abrasion resistant layer. The protective, wear-resisting structural layer applied at those parts, such as the silo bottom, the hopper and the silo wall, which are in direct contact with the stored material.

2.0.11 cone. The conical top slab at the top of a silo.

2.0.12 reinforcing steel bar supporting rack. Commonly known as a bar stool, used mainly in the reinforcement work of foundations and of cast-in-situ slabs with two or more layers of bars to support the upper layer of reinforcement; it is generally fabricated from section steel, reinforcing bar, plastic and similar materials.

2.0.13 mold method. A method in which, at the end of the buttress column attached to the wall of an unbonded prestressed silo, a recess is formed with timber formwork or formwork of another material so that the tensioning end and the fixed-end anchorage can be placed inside the recess; after the prestressing tendons have been tensioned the anchorage is sealed with concrete.

2.0.14 foundation pile construction by interval. In the construction of piles arranged in rows or at close spacing, a method in which the piles are built in batches with one or several piles skipped between them; once the first batch of piles has reached a certain strength the next batch is built following the same sequence.

2.0.15 bracket trough silo wall. A trough bunker wall formed by the combination of reinforced concrete beams, column brackets and wall slabs.

2.0.16 spray anchor trough silo wall. A trough bunker wall formed by the combination of soil nails, anchor rods and sprayed concrete.

2.0.17 hanging plate trough silo wall. A trough bunker wall formed by the combination of precast slabs and reinforced earth.

2.0.18 set of high strength bolt. The collective designation of a high-strength bolt together with the nut and washer matched to it.

Remaining clauses in the full document

  • 3 Basic Requirements
  • 4 Coal Storage Yard
  • 5 Silo
  • 6 Trough Bunker
  • 7 Screening Broken Workshop, Main Machine Hall, Filter Workshop
  • 8 Coal Belt Conveyor Gallery
  • 9 Concentrated Tank
  • 10 Loading Bunker
  • 11 Additional Building
  • 12 Quality Acceptance
  • 13 Green Construction

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 66 pages — is available in the English PDF.

Similar standards

GB 50300|GB 50204|GB 50205|GB 50202|GB/T 50640

How to Buy NB/T 51042-2015

  1. 1Add to cart. Click the "Buy NB/T 51042-2015" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
66 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

NB/T 51042-2015

$1,440.00

$1,225.00for partners