NB/T 10515-2021Standard for quality of surface coal mine installation engineering (English PDF)
露天煤矿建矿安装工程质量验收标准
This is a limited preview
Buy now to download the full PDF (43 pages)
Need quotation for your management?
Get a formal quotation for NB/T 10515-2021 in 30 minutes.
Issued by
NEA
Level / Type
Industry · Recommended
Issue date
January 7, 2021
Implementation date
April 1, 2021
Scope
NB/T 10515-2021 is the English-translated version of 露天煤矿建矿安装工程质量验收标准.
NB/T 10515-2021 governs the quality acceptance of installation works at open-pit coal mines, within the pit and the dump areas.
After setting out the data to prepare before acceptance, the division into acceptance units and the pass criteria, it gives mechanical and electrical installation requirements for fixed and semi-mobile crushers, belt conveyors, drying system equipment, drainage system equipment and power supply and distribution equipment, including pipe work and overhead lines.
Annexes list the sub-item, division and unit project names and provide the acceptance record forms, the divisional quality summary, the quality control data check and the appearance quality inspection record.
Mine owners, installers and supervisors use it at handover. Issued on 7 January 2021, it has applied since 1 April 2021.
Found what you need?
Document preview — NB/T 10515-2021
National Standard of the People's Republic of China
- Classification
- D 09
Issued by: National Energy Administration of the People's Republic of China
Contents
- Preface
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
- 4 Acceptance Subject Requirements
- 4.1 Data preparation before acceptance
- 4.2 Basic Provisions
- 4.3 Division of Acceptance Units
- 4.4 Acceptance Qualification Judgment
- 5 Installation of stationary and semi-mobile crushers
- 5.1 General provisions
- 5.2 Mechanical installation
- 5.3 Electrical installation
- 6 Belt conveyor installation
- 6.1 General provisions
- 6.2 Mechanical installation (main control item)
- 6.3 Electrical installation
- 7 Installation of drying system equipment
- 7.1 General provisions
- 7.2 Mechanical installation
- 7.3 Electrical installation
- 7.4 Pipe installation
- 8 Installation of drainage system equipment
- 8.1 General provisions
- 8.2 Mechanical installation
- 8.3 Electrical installation
- 8.4 Pipe installation
- 9 Installation of power supply and distribution system equipment
- 9.1 General provisions
- 9.2 Overhead line installation
- 9.3 Electrical installation
- Appendix A (Normative Appendix) List of Sub-items, Divisions and Unit Project Names of Open-pit Mine Installation Works
- Appendix B (Normative Appendix) Acceptance Records of Acceptance Units at All Levels
- Appendix C (Normative Appendix) Summary of Quality Acceptance of Subdivisional Engineering
- Appendix D (Normative Appendix) Inspection of Quality Control Data for Unit Projects
- Appendix E (normative appendix) Unit Project Perspective Quality Inspection Record
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
1 Scope
This standard specifies the main acceptance requirements for the acceptance of open-pit coal mine installation projects, the installation of fixed and semi-mobile crusher equipment, the belt conveyor Technical requirements for engineering quality acceptance of installation of air-delivery equipment, installation of drying system equipment, installation of drainage system equipment, and installation of power supply and distribution system equipment.
This standard applies to the quality acceptance of installation works within the scope of open-pit coal mine excavations and dumps.
2 Normative references
The following documents are essential for the application of this document. For dated references, only the dated version applies to this document. For undated references, the latest edition (including all amendments) applies to this document.
GB 50150-2006 Electrical Equipment Handover Test Standard for Electrical Installation Installation Engineering
GB 50168-2018 Code for construction and acceptance of electrical installation engineering cable lines
GB 50171-2012 Code for construction and acceptance of electrical installation engineering panels, cabinets and secondary circuit wiring
GB 50184-2011 Code for acceptance of construction quality of industrial metal pipeline engineering
GB 50204-2015 Code for acceptance of construction quality of concrete structure engineering
GB 50231-2017 General Specification for Construction and Acceptance of Mechanical Equipment Installation Engineering
GB 50268-2008 Code for construction and acceptance of water supply and drainage pipeline works
GB 50270-2010 Specification for construction and acceptance of conveying equipment installation engineering
GB 50661-2011 Specification for welding of steel structures
GB 50683-2011 Code for acceptance of construction quality of field equipment and industrial pipeline welding works
GB 51062-2014 Code for construction of coal mine equipment installation engineering
GB J149-1990 Specifications for construction and acceptance of busbar installations in electrical installations
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1 Open-pit coal mine installation works
It reflects the production system equipment, dredging and drainage system equipment, power supply and distribution system equipment within the scope of open-pit coal mines and dumps.
The main contents of the installation works within the scope of the open-pit coal mine excavation and dumping yard.
3.2 Quality of installation works
It reflects that the installation works within the excavation site and dump site of the open-pit coal mine meet the requirements of the relevant standards or the contract, including its installation.
Total, production use functions and indicators and the characteristic sum of all apparent and implied capabilities in terms of durability performance.
3.3 Inspection lot
The smallest unit that is accepted by different parts or batches of the same sub-project.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 43 pages — is available in the English PDF.
Referenced standards
Normative references
- GB 50150-2006Electric equipment installation engineering-standard for hand-over test of electric equipment
- GB 50168-2018Standard for construction and acceptance of cable line electric equipment installation engineering
- GB 50171-2012Erection works of electrical installations Code for construction and acceptance of switchboard outfit,complete cubicle and secondary circuit
- GB 50184-2011Code for acceptance of construction quality of industrial metallic piping enguneering
- GB 50204-2015Code for quality acceptance of concrete structure construction
- GB 50231-2017General code for construction and acceptance of mechanical equipment installation engineering
GB J149-1990
Similar standards
How to Download NB/T 10515-2021
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB 50168-2018 — Standard for construction and acceptance of cable line electric equipment installation engineering
GB 50171-2012 — Erection works of electrical installations Code for construction and acceptance of switchboard outfit,complete cubicle and secondary circuit
GB 50184-2011 — Code for acceptance of construction quality of industrial metallic piping enguneering