Scope
JB/T 10499-2005 is the English-translated version of 透平型发电机非正常运行工况设计和应用导则.
JB/T 10499-2005 is the Chinese standard "Guide for design and application of turbine generators under abnormal operating conditions". Its scope clause reads: This Standard specifies the operating range and degree of turbo generators under various abnormal operating conditions.
This Standard is applicable to turbo synchronous generators of which the capacity range is greater than 100 MW. This Standard can be used as the basis by user and manufacturer when signing technical agreement.
Special requirements for specific products shall be agreed by both supplier and buyer. Its clauses include terms and definitions.
Found what you need?
Document preview — JB/T 10499-2005
National Standard of the People's Republic of China
Issued by: Ministry of Industry and Information Technology of the People's Republic of China
Contents
- Foreword3
- 1 Scope4
- 2 Normative references4
- 3 Terms and definitions4
- 4 Technical requirements5
1 Scope
This Standard specifies the operating range and degree of turbo generators under various abnormal operating conditions.
This Standard is applicable to turbo synchronous generators of which the capacity range is greater than 100 MW.
This Standard can be used as the basis by user and manufacturer when signing technical agreement. Special requirements for specific products shall be agreed by both supplier and buyer.
2 Normative references
The following standards contain the provisions which, through reference in this
Standard, constitute the provisions of this Standard. For dated references, the subsequent amendments (excluding corrections) or revisions do not apply to this Standard. However, the parties who enter into agreement based on this
Standard are encouraged to investigate whether the latest versions of these documents are applicable. For undated reference documents, the latest versions apply to this Standard.
GB 755-2000 Rotating electrical machines - Rating and performance (idt IEC 60034-1: 1996)
GB/T 7064-2002 Requirements for turbine type synchronous machine (IEC 60034-3: 1988, NEQ)
3 Terms and definitions
The following terms and definitions apply to this document.
3.1 asynchronous operation
Asynchronous operation state caused by excitation-loss.
3.2 out-of-step operation
4.8 Water-break operation
The allowable water-break operation duration time of water cooled motor is 30 s. If the backup pump cannot restore the water supply within the aforementioned time, it must be power-trip.
4.9 Out-of-phase synchronization
It shall ensure that the power generator can withstand 180° out-of-phase synchronization for 5 times or 120° out-of-phase synchronization for 2 times during its life time.
4.10 Single-phase reclosing-switch
The power generator shall have the capability of withstanding single-phase high-voltage line reclosing-switch, which shall not affect its reliability.
4.11 Start and stop times of generator set
Two-shift peak-adjustment set is allowed to start and stop for 10000 times during its life time.
Non two-shift set shall withstand start and stop for 3000 times during its life time.
4.12 Examination on turbo generator after large system disturbance
The turbo synchronous generator shall withstand sudden short circuit of stator winding outlet end under rated voltage, rated active power and rated power factor.
Generator shutdown inspection shall be conducted for direct cooling or indirect cooling turbo generator after withstanding large system disturbance. The abnormal operation working conditions requiring post inspection are as follows:
- Generator outlet; in some cases, it also includes three-phase or two- phase sudden short circuit of high-pressure side of step-up transformer of electrical transformer unit;
- Sudden short circuit of generator transformer unit and system networking when they are operating near generator transformer proximal end;
- Generators and network operation failure, e.g., out-of-phase synchronization reclosing-switch;
- Asynchronous operation that exceeds the allowable limit (especially high rotating-difference rate) and out-of-step operation;
- High negative sequence current operation is not allowed;
- Abnormal rise in rotational speed caused by turbine.
After serious abnormal operation, visual inspection and some tests shall be conducted based on specific abnormal operating conditions. For example, inspections on heating of rotor surface, stator end windings and structural parts, coupling screws and voltage resistance test and dye penetration test, etc.
4.13
Matters not specified in this Standard shall comply with the provisions of
GB/T 7064.
__________ END __________ […]
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Similar standards
How to Download JB/T 10499-2005
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
JB/T 106-2024 — Valves marking and coating
JB/T 14540-2024 — Sanitary cam rotor pumps
JB/T 14754-2024 — Equipment for disposal of dead and diseased livestock and poultry
Secure payment via Stripe
Payments accepted
JB/T 10499-2005
$40.00