HJ 408-2021Technical specifications for acceptance of environmental protection facilities for completed construction projects - Paper industry (English PDF)

Preview PDF

This is a limited preview

Buy now to download the full PDF (20 pages)

Need quotation for your management?

Get a formal quotation for HJ 408-2021 in 30 minutes.

Issued by

Ministry of Ecology and Environment

Level / Type

National · Mandatory

Issue date

January 1, 1970

Implementation date

January 1, 1970

Scope

HJ 408-2021 (Technical specifications for acceptance of environmental protection facilities for completed construction projects - Paper industry) is available as an English-translated PDF.

HJ 408-2021 — This standard specifies the working procedures and general requirements for the acceptance check of completed environmental protection facilities for paper industry construction projects, and proposes the start-up acceptance, Technical requirements for acceptance self-inspection, preparation of acceptance monitoring plan, implementation of acceptance monitoring and inspection, and preparation of acceptance monitoring report (table).

This standard is applicable to the acceptance check of completed environmental protection facilities for construction projects of the paper industry.

The acceptance check of the completed environmental protection facilities for the self-provided thermal power generating units (plants) in the construction projects of the paper industry shall be carried out in accordance with HJ/T 255.

Other contents not stipulated in this standard shall be in accordance with the Pollution Impact Category of the Technical Guidelines for Environmental Protection Acceptance of Construction Projects (Ministry of Ecology and Environment) Report No. 9 of 2018) Annex implementation.

Found what you need?

Document preview — HJ 408-2021

National Standard of the People's Republic of China

Classification
Z 01

Issued by: Ministry of Ecology and Environment

Contents

  • Foreword
  • 1 Scope
  • 2 Normative references
  • 3 Terms and Definitions
  • 4 Acceptance work procedures
  • 5 Start acceptance
  • 6 Acceptance self-inspection
  • 7 Compile the acceptance monitoring plan
  • 8 Implement acceptance monitoring and inspection
  • 9 Prepare the acceptance monitoring report (table)
  • 10 Follow-up acceptance work
  • Appendix A (Informative Appendix) Acceptance Workflow Flowchart
  • Appendix B (informative appendix) Checklist of materials
  • Appendix C (informative appendix) Acceptance self-examination content table
  • Appendix D (informative appendix) Contents of the acceptance monitoring plan
  • Appendix E (informative appendix) Recommended monitoring and analysis methods
  • Appendix F (informative appendix) Recommended method for follow-up acceptance work

1 Scope of application

This standard specifies the working procedures and general requirements for the acceptance check of completed environmental protection facilities for paper industry construction projects, and proposes the start-up acceptance, Technical requirements for acceptance self-inspection, preparation of acceptance monitoring plan, implementation of acceptance monitoring and inspection, and preparation of acceptance monitoring report (table).

This standard is applicable to the acceptance check of completed environmental protection facilities for construction projects of the paper industry.

The acceptance check of the completed environmental protection facilities for the self-provided thermal power generating units (plants) in the construction projects of the paper industry shall be carried out in accordance with HJ/T 255.

Other contents not stipulated in this standard shall be in accordance with the Pollution Impact Category of the Technical Guidelines for Environmental Protection Acceptance of Construction Projects (Ministry of Ecology and Environment) Report No. 9 of 2018) Annex implementation.

2 Normative references

This standard refers to the following documents or clauses thereof. For dated references, only the dated version applies to this standard.

For undated references, the latest edition (including all amendments) applies to this standard.

GB 3096 Acoustic Environment Quality Standard GB 3544 Pulp and Paper Industry Water Pollutant Discharge Standard GB 5085.7 General Rules for Identification Standard of Hazardous Waste GB 9078 Industrial Furnace Air Pollutant Emission Standard GB 12348 Industrial Enterprise Boundary Environmental Noise Emission Standard GB 13271 Boiler Air Pollutant Emission Standard GB 14554 Emission Standard of Odor Pollutants GB 16297 Comprehensive Emission Standard of Air Pollutants GB 18484 Standard for Pollution Control of Hazardous Waste Incineration GB 18485 Standard for Pollution Control of Domestic Waste Incineration GB 18597 Hazardous Waste Storage Pollution Control Standard GB 18599 General Industrial Solid Waste Storage and Landfill Pollution Control Standard GB 34330 General Rules for the Identification Standard of Solid Waste GB/T 8170 Numerical Rounding Rules and Representation and Judgment of Limit Values GB/T 14581 Technical Guidelines for Sampling of Water Quality in Lakes and Reservoirs GB/T 16157 Determination of particulate matter in exhaust gas from stationary pollution sources and sampling methods for gaseous pollutants HJ/T 52 Technical Guidance for Water Quality River Sampling HJ/T 55 Technical guidelines for monitoring fugitive emissions of air pollutants HJ 75 Technical Specification for Continuous Monitoring of Flue Gas (SO2, NOx, Particulate Matter) Emissions from Stationary Pollution Sources HJ 76 Technical requirements and testing methods for continuous monitoring system for emission of flue gas (SO2, NOx, particulate matter) from stationary sources HJ/T 91 Technical Specification for Surface Water and Sewage Monitoring HJ 91.1 Technical Specification for Wastewater Monitoring HJ/T 92 Technical Specifications for Monitoring Total Discharge of Water Pollutants HJ 164 Technical Specification for Groundwater Environmental Monitoring HJ 194 Technical Specification for Manual Monitoring of Ambient Air Quality HJ/T 255 Technical Specifications for Environmental Protection Acceptance of Completion of Construction Projects for Thermal Power Plants HJ 353 Technical Specification for Installation of Water Pollution Source Online Monitoring System (CODCr, NH3-N, etc.) HJ 354 Technical Specification for Acceptance of On-Line Monitoring System for Water Pollution Sources (CODCr, NH3-N, etc.) HJ 355 Technical Specifications for Operation of Online Monitoring System for Water Pollution Sources (CODCr, NH3-N, etc.) HJ 356 Technical Specification for Data Validity Judgment of Water Pollution Source Online Monitoring System (CODCr, NH3-N, etc.) HJ/T 397 Technical Specification for Stationary Source Waste Gas Monitoring HJ 493 Technical Regulations for the Preservation and Management of Water Quality Samples HJ 494 Water Quality Sampling Technical Guide HJ 495 Technical Regulations for Design of Water Quality Sampling Scheme HJ 630 Environmental Monitoring Quality Management Technical Guidelines HJ 640 Environmental Noise Monitoring Technical Specifications Routine Monitoring of Urban Acoustic Environment HJ 664 Technical Specifications for Layout of Ambient Air Quality Monitoring Points (Trial) HJ 819 General Principles of Technical Guidelines for Self-Monitoring of Pollutants HJ 905 Technical Specification for Environmental Monitoring of Odor Pollution "Announcement on Issuing the Pollution Impact Category of Technical Guidelines for Environmental Protection Acceptance of Completion of Construction Projects" (Announcement of the Ministry of Ecology and Environment no. 9 of 2018) Regulations on the Administration of Pollution Discharge Permits (Order No. 736 of the State Council of the People's Republic of China)

3 Terms and Definitions

The following terms and definitions apply to this standard.

paper industry

Use plants (wood, other plants) or waste paper as raw materials to produce pulp, use pulp as raw materials to produce paper, cardboard and other products, and an enterprise or production facility that processes paper products from paper and cardboard.

pulp and paper enterprise Enterprises with pulping or papermaking processes, including pulping enterprises, papermaking enterprises, and pulp and paper joint enterprises. Paper with pulp or paper production processes Product processing enterprises are also regarded as pulp and paper enterprises.

paper products processing enterprises Enterprises that use paper and cardboard as raw materials to process paper products.

environmental protection facilities Prevent and control environmental pollution and ecological damage, and carry out installations, equipment and engineering facilities required for environmental monitoring.

4 Acceptance work procedures

The acceptance work includes acceptance self-inspection, acceptance monitoring and subsequent acceptance work. The acceptance monitoring work can be divided into the preparation of acceptance monitoring plans, There are three stages of implementation of acceptance monitoring and inspection, and preparation of acceptance monitoring report (table). The follow-up acceptance work includes putting forward acceptance opinions, compiling "their Matters that he needs to explain", forming and making public acceptance reports, registration on the national construction project completion environmental protection acceptance information platform, and file retention Wait. See Appendix A for the acceptance work procedure diagram.

5 Start acceptance

5.1 Collect acceptance data

The collected acceptance data includes environmental protection data, engineering data related to environmental protection, and drawing data. For the list of acceptance documents, please refer to the attached Record B.

5.2 Develop an acceptance work plan

Formulate the acceptance work plan, clarify the acceptance monitoring method of the enterprise's self-test or entrust the technical organization to monitor, and the acceptance work schedule.

6 Acceptance self-check

6.1 Purpose of self-examination

Self-inspection of the implementation of environmental protection procedures, the completion of projects and environmental protection facilities, and the environmental impact report (table) and its the consistency of the approval decision of the approval department, to determine whether the conditions for the acceptance work as planned; self-inspection of the distribution of pollution sources and pollutant discharge the situation and the setting of the discharge outlet, etc., are used as the basis for formulating the acceptance monitoring plan.

6.2 Self-inspection content

6.2.1 Implementation of environmental protection procedures

The performance of environmental protection formalities includes the project environmental impact report (form) and its approval by the approval department; if there is a major change, the the completion of the corresponding approval procedures; the implementation of the project supervision, inspection and rectification requirements by the national and local ecological environment authorities;

Permit application or pollution discharge registration, etc.

6.2.2 Construction of the project

Comparing with the environmental impact report (table) and the approval decision of the approval department, self-examination of the main project, storage and transportation projects, public and auxiliary projects and compliance Construction of supporting projects, etc. See Table C.1 to Table C.4 in Appendix C for the content of self-inspection.

6.2.3 Completion of environmental protection facilities
6.2.3.1 Pollution control/disposal facilities

Comparing with the environmental impact report (form) and the approval decision of the approval department, self-examination of waste water, waste gas, noise, solid waste pollution control/the completion of disposal facilities shall be used as the basis for determining the monitoring contents such as monitoring points and factors in the acceptance monitoring plan. See Appendix C for the content of the self-examination Middle Table C.5 ~ Table C.8.

6.2.3.2 Construction of other environmental protection facilities

Comparing with the environmental impact report (form) and the approval decision of the approval department, self-inspect the completion of other required supporting environmental protection facilities, as the basis for determining the inspection content in the acceptance monitoring plan. See Table C.9 in Appendix C for the content of self-check.

6.3 Self-examination results

Or the environmental impact report (form) has not been approved, and the environmental impact report (form) and the approval decision of the approval department have not been approved.

Environmental protection facilities, those who should have obtained but have not obtained a pollutant discharge permit or registered pollutant discharge, shall go through relevant procedures or be rectified before continuing to operate.

Exhibition acceptance work.

The self-inspection found that the location of the pollutant discharge outlet or the pollutant discharge method, the discharge destination, the number of pollutant discharge outlets or the type of pollutant discharge.

If the pollutant discharge permit is inconsistent with the pollutant discharge permit, a new pollutant discharge permit shall be applied in accordance with the provisions of the Regulations on the Administration of Pollutant Discharge Permits.

If the discharge outlet does not meet the monitoring conditions, such as the sampling platform and sampling hole setting are not standardized, it should be rectified in time to ensure the quality of the on-site monitoring data.

Quantity and monitoring personnel safety.

7 Prepare the acceptance monitoring plan

7.1 Compilation principle of acceptance monitoring plan

The paper industry should determine the content of acceptance monitoring according to the results of the acceptance self-inspection, and the construction project including the pulping section should formulate an acceptance monitoring plan.

For projects with small modules and simple renovation and expansion content, the content of the acceptance monitoring plan can be simplified appropriately, but it should include acceptance execution standards, monitoring points, Monitoring factors, monitoring frequency and other main contents.

7.2 Contents and requirements of acceptance monitoring plan

7.2.1 Contents of acceptance monitoring plan

The content of the acceptance monitoring plan generally includes the project overview, acceptance basis, project construction, environmental protection facilities, acceptance implementation standards, Acceptance monitoring content, quality assurance and quality control, etc. Please refer to Appendix D for the content of the acceptance monitoring plan, and the recommended monitoring and analysis methods for acceptance monitoring.

See Appendix E.

7.2.2 Acceptance Execution Criteria

Acceptance and implementation standards include pollutant discharge standards and ecological environment quality standards.

The relevant requirements of the annex to the Technical Guidelines for Pollution Impacts" shall be implemented.

The discharge of water pollutants in paper industry construction projects shall comply with GB 3544.Boiler (non-thermal power generation unit) exhaust gas pollutant discharge implementation GB 13271; GB 9078 for the emission of waste gas pollutants from lime kilns; for incinerators incinerating general solid waste, the emission of waste gas pollutants shall be carried out with reference to GB 18485; For incinerators incinerating hazardous wastes, the emission of waste gas pollutants shall comply with GB 18484; Waste gas pollution from alkali recovery furnaces and paper processing sections the emission standards of pollutants shall be implemented in accordance with the environmental impact report (form) and the approval decision of the approval department; the emission of odor pollutants shall be implemented in accordance with GB 14554;

The exhaust emission of chemical preparation mainly implements GB 16297.The environmental noise at the factory boundary shall comply with GB 12348.Identification, utilization and disposal of solid waste Use GB 5085.7, GB 34330, GB 18597, GB 18599, etc. Environmental impact report (form) and its approval decision by the approval department, If the standards or limit values required by the pollutant discharge permit or pollutant discharge registration are stricter than the above-mentioned standards, the provisions thereof shall prevail.

The environmental quality assessment surrounding the construction projects of the paper industry shall implement the currently valid ecological environment quality standards.

The treatment efficiency of environmental protection facilities shall be implemented in accordance with the relevant standards and the approval decision of the environmental impact report (form) approval department.

7.2.3 Contents of acceptance monitoring
7.2.3.1 Effect monitoring of commissioning and operation of environmental protection facilities

a) Pollutant emission monitoring

1) Pollutant discharge monitoring of workshop or production facility waste water discharge outlet, waste water discharge outlet, rainwater discharge outlet (when there is flowing water), Wastewater monitoring with reuse or indirect discharge requirements in the environmental impact report (form) and its approval decision by the approval department.

2) Monitoring of organized waste gas emissions, and monitoring of unorganized waste gas emissions at the factory boundary.

7.2.3.2 Environmental quality monitoring

Environmental quality monitoring is mainly aimed at the environmentally sensitive targets required in the environmental impact report (form) and its approval decision by the approval department, including Monitoring of surface water, groundwater, ambient air, acoustic environment, etc., the monitoring factors can be reviewed according to the environmental impact report (table) and its approval department.

The selection is decided by batch, and the monitoring results can be used as the basic data for analyzing the impact of the project on the surrounding environmental quality. Surface water monitoring should meet GB/T 14581, HJ/T 52, HJ/T 91, HJ 493, HJ 494, HJ 495 and other requirements, groundwater monitoring should meet HJ 164 and other requirements, environmental Air monitoring should meet the requirements of HJ 194 and HJ 664, and acoustic environment monitoring should meet the requirements of GB 3096 and HJ 640.

8 Implement acceptance monitoring and inspection

8.1 On-site monitoring and inspection Carry out on-site monitoring according to the acceptance monitoring plan, do a good job of quality control and quality assurance of on-site monitoring according to relevant technical specifications, and conduct on-site monitoring the construction and operation of other environmental protection facilities involved shall be further inspected on site.

8.2 Requirements for working condition records

The actual working conditions during monitoring and the key parameters that determine or affect the working conditions are truthfully recorded, and the truthful recording can reflect the operation of environmental protection facilities Main indicator of status.

a) Record the amount of raw and auxiliary materials and product output during the monitoring period of each major production unit.

b) The operating load of the supporting furnaces and kilns, record the steam generation, fuel consumption, and the names of the chemicals consumed by the supporting environmental protection facilities during the monitoring period Weighing and dosage, etc.

c) The operating load of sewage treatment facilities, record the amount of sewage treatment, sewage recycling, sewage discharge, and sludge production during the monitoring period (recorded water content), the name and dosage of the main chemicals used in sewage treatment, etc.

8.3 Monitoring data collation

Organize monitoring data in accordance with relevant evaluation standards and technical specifications, and pay special attention to the following when analyzing.

a) According to the evaluation standard, some air pollutants should be converted into the benchmark emission concentration of the benchmark oxygen content according to the measured concentration before reaching the standard.

If there is no need for conversion, the measured concentration will be used for evaluation.

b) The exhaust gas emission rate assessment shall be calculated using the measured concentration.

c) The exhaust gas monitoring data should list the standard exhaust gas flow rate, oxygen content (when conversion is required), measured concentration, and converted concentration (when conversion is required).

d) The waste gas pollutants are calculated based on the single effective evaluation data for the efficiency of treatment facilities, and the efficiency of treatment facilities is calculated according to the amount of pollutants imported and exported.

(exhaust gas flow × pollutant concentration) to calculate.

e) If the actual water discharge per unit product exceeds the benchmark water discharge per unit product, the measured water pollutant concentration shall be determined according to GB 3544.

The formula is converted into the benchmark water discharge concentration of water pollutants, and the benchmark water discharge concentration of water pollutants is used to determine whether the discharge is basis for compliance.

f) The efficiency of the treatment facility is calculated based on the daily average concentration of wastewater pollutants; if the inlet and outlet of the treatment facility are not in one-to-one correspondence, the amount of pollutants entering and exiting the treatment facility (water volume × pollutant concentration) is used to calculate the treatment efficiency; when the treatment unit enters and exits the water when the amount is the same, the concentration value can be directly used to calculate the treatment efficiency.

g) According to the requirements of GB/T 8170 and HJ 630, the judgment, processing and data revision of abnormal values shall be carried out.

9 Prepare acceptance monitoring report (table)

9.1 Main content of acceptance monitoring report (table)

The main contents of the acceptance monitoring report (table) should include project overview, acceptance basis, project construction, environmental protection facilities, acceptance Implementation standards, acceptance monitoring content, quality assurance and quality control results, acceptance monitoring results and acceptance monitoring conclusions. Acceptance monitoring report (table) for the recommended format, please refer to Appendix 2 in the Appendix of the "Technical Guidelines for Environmental Protection Acceptance of Construction Projects Completion and Pollution Impacts".

9.2 Quality Assurance and Quality Control Results

On the basis of the "Quality Assurance and Quality Control" chapter of the acceptance monitoring plan, supplement the ability of the personnel participating in the acceptance monitoring.

Indicate the quality assurance and quality control measures taken for measurement, gas monitoring, noise monitoring, etc., and list the names, models, number, corresponding calibration, quality assurance and quality control results, etc.

9.3 Acceptance monitoring results

9.3.1 Production conditions

The list describes the actual working conditions during the monitoring period, the key parameters that determine or affect the working conditions, and the main parameters that reflect the operating status of the environmental protection facilities.

To index.

9.3.2 Effect of commissioning and operation of environmental protection facilities
9.3.2.1 Pollutant discharge monitoring results

According to the acceptance monitoring data, evaluate whether the monitoring results of waste water, waste gas, and boundary environmental noise meet the requirements of relevant standards.

According to the monitoring results of the "new and old" facilities, evaluate whether the pollutant discharge meets the requirements of relevant standards.

9.3.2.2 Monitoring results of treatment efficiency of environmental protection facilities

Calculate the treatment efficiency of major pollutants and evaluate the treatment efficiency of environmental protection facilities according to the monitoring results of the inlet and outlet of waste water and waste gas treatment facilities Whether the rate complies with the relevant standards and the approval decision requirements of the environmental impact report (form) approval department. If it does not meet the requirements, the reasons should be analyzed.

If the monitoring conditions are not monitored, the reasons shall be explained.

9.3.3 Impact of project construction on environmental quality

According to the acceptance monitoring data, the environmental quality monitoring results of surface water, groundwater, ambient air, acoustic environment and other environmental sensitive targets are evaluated as follows.

meet the relevant standard requirements. If it exceeds the standard, the reasons should be analyzed. For monitoring factors without evaluation criteria, only the monitoring results need to be listed.

Evaluation.

9.4 Acceptance monitoring conclusion

9.4.1 Effect of commissioning and operation of environmental protection facilities
9.4.1.1 Pollutant discharge monitoring results

Briefly describe whether the monitoring results of various pollutants such as waste water, waste gas, and boundary environmental noise meet the requirements of relevant standards.

9.4.1.2 Monitoring results of treatment efficiency of environmental protection facilities

Briefly describe whether the treatment efficiency of major pollutants in environmental protection facilities such as waste water and waste gas complies with relevant standards, and review the environmental impact report (form).

Approval decision requirements of the approval department.

9.4.2 Impact of project construction on environmental quality

If environmental quality monitoring is involved, evaluate the monitoring results of surface water, groundwater, ambient air, and acoustic environmental quality of sensitive targets surrounding the project.

Whether it complies with the relevant standards.

9.4.3 Implementation of environmental protection facilities

Briefly describe whether the environmental impact report (form) and the approval decision of the approval department have implemented the waste water, waste gas, noise treatment facilities, solid Waste utilization and disposal facilities, environmental risk prevention facilities, groundwater pollution prevention and control facilities, soil pollution prevention and control facilities, online monitoring facilities, the requirements of various environmental protection facilities such as "new and old" facilities.

9.5 Attachment of acceptance monitoring report (table)

The annex to the report is the main proof or supporting materials involved in the content of the acceptance monitoring report (table), mainly including the environmental impact of the approval department Approval decision of report (table), monitoring data report, description of project changes, agreement on entrusted utilization and disposal of hazardous waste and disposal unit Qualification certificate, etc.

10 Follow-up acceptance work

After the acceptance monitoring report is completed, enter the follow-up acceptance work procedure, put forward acceptance opinions, and prepare "other matters that need to be explained".

Form an acceptance report and disclose it to the public, log in to the National Construction Project Completion Environmental Protection Acceptance Information System Platform to fill in relevant information, and establish a file case. Refer to Appendix F for the recommended method for subsequent acceptance work.

Acceptance opinions shall include the basic situation of project construction, project changes, implementation of environmental protection facilities, commissioning and operation of environmental protection facilities.

The effect of the project, the impact of the project construction on the environment, the main problems existing in the project, the acceptance conclusion and the follow-up requirements.

"Other Items to be Explained" should truthfully record the design, construction, and acceptance process of the project's environmental protection facilities, as well as the pollutant discharge permit.

The implementation of the certificate and the implementation of the regional reduction plan, the environmental impact report (form) and the environmental protection requirements proposed in the approval decision of the approval department the implementation of other environmental protection measures outside the protection facility and the rectification work.

For the compilation content and requirements of the acceptance opinions and "other matters that need to be explained", please refer to the "Technical Guidelines for Environmental Protection Acceptance of Construction Projects Completion" Appendices 4 and 5 in the "Pollution Impact Category" annex.

The acceptance report is a summary document that records the environmental protection acceptance process and results of the completed construction project, including the acceptance monitoring report and acceptance opinions.

and "other matters that need to be explained".

Appendix D

(informative appendix) Acceptance monitoring plan content D.1 Project Overview Briefly describe the project name, nature, scale, location, the process of environmental impact assessment, design, construction, approval and other information, as well as the approval document number, etc.

Project start, completion, commissioning time, application for pollutant discharge permit or pollutant discharge registration, actual total project investment and environmental protection investment.

Clarify the scope of acceptance, such as phased acceptance, the scope of this acceptance shall be stated; the organization and implementation plan of acceptance monitoring work shall be described.

D.2 Acceptance basis

a) Laws, regulations and rules and regulations related to environmental protection of construction projects.

b) Technical specifications for acceptance of environmental protection (facilities) upon completion of construction projects.

c) The environmental impact report (form) of the construction project and the approval decision of the approval department.

d) Other relevant documents of the competent department of ecological environment.

D.3 Project Construction Situation D.3.1 Geographical location and layout Briefly describe the construction site and surrounding environment of the project, and attach the actual location map and floor plan of the project.

The geographic location map indicates the distribution of environmental protection sensitive targets around the project, and the relative position of the sensitive targets to the factory boundary or major pollution sources.

location and distance.

The floor plan highlights the main production facilities, waste water and storm water discharge outlets, organized exhaust gas stacks, solid waste storage sites, thing...

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 20 pages — is available in the English PDF.

Referenced standards

How to Download HJ 408-2021

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
20 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

HJ 408-2021

$554.00