Valid

HJ 406-2021Technical specifications for acceptance of environmental protection facilities for completed construction projects - Ethylene engineering (English PDF)

Preview PDF

This is a limited preview

Buy now to download the full PDF (23 pages)

Need quotation for your management?

Get a formal quotation for HJ 406-2021 in 30 minutes.

Issued by

Ministry of Ecology and Environment

Level / Type

National · Mandatory

Issue date

January 1, 1970

Implementation date

January 1, 1970

Scope

HJ 406-2021 (Technical specifications for acceptance of environmental protection facilities for completed construction projects - Ethylene engineering) is available as an English-translated PDF.

HJ 406-2021 — This standard specifies the work procedures and general requirements for the acceptance of environmental protection facilities for the completion of ethylene projects, and proposes start-up acceptance, self-inspection, Technical requirements for compiling acceptance monitoring plans, implementing acceptance monitoring and inspection, and compiling acceptance monitoring reports (tables).

This standard applies to the acceptance of environmental protection facilities for ethylene projects completed.

In the ethylene project, the completed environmental protection facility acceptance work of the self-provided thermal power generating unit (plant) shall be carried out in accordance with HJ/T 255, and the dock and other ecological the acceptance check of the completed environmental protection facilities for the impacted projects shall be carried out in accordance with HJ/T 394.

Other contents not stipulated in this standard shall be in accordance with the Pollution Impact Category of the Technical Guidelines for Environmental Protection Acceptance of Construction Projects (Ministry of Ecology and Environment) Report No. 9 of 2018) Annex implementation.

Found what you need?

Document preview — HJ 406-2021

National Standard of the People's Republic of China

Classification
Z 01

Issued by: Ministry of Ecology and Environment

Contents

  • Foreword
  • 1 Scope
  • 2 Normative references
  • 3 Terms and Definitions
  • 4 Acceptance work procedures
  • 5 Start acceptance
  • 6 Acceptance self-inspection
  • 7 Compile the acceptance monitoring plan
  • 8 Implement acceptance monitoring and inspection
  • 9 Prepare the acceptance monitoring report (table)
  • 10 Follow-up acceptance work
  • Appendix A (Informative Appendix) List of Ethylene Engineering Products
  • Appendix B (informative appendix) Acceptance work procedure diagram
  • Appendix C (informative appendix) Checklist of materials
  • Appendix D (informative appendix) Acceptance self-examination content table
  • Appendix E (informative appendix) Contents of the acceptance monitoring plan
  • Appendix F (informative appendix) Recommended monitoring and analysis methods
  • Appendix G (informative appendix) Recommended method for follow-up acceptance work

1 Scope of application

This standard specifies the work procedures and general requirements for the acceptance of environmental protection facilities for the completion of ethylene projects, and proposes start-up acceptance, self-inspection, Technical requirements for compiling acceptance monitoring plans, implementing acceptance monitoring and inspection, and compiling acceptance monitoring reports (tables).

This standard applies to the acceptance of environmental protection facilities for ethylene projects completed.

In the ethylene project, the completed environmental protection facility acceptance work of the self-provided thermal power generating unit (plant) shall be carried out in accordance with HJ/T 255, and the dock and other ecological the acceptance check of the completed environmental protection facilities for the impacted projects shall be carried out in accordance with HJ/T 394.

Other contents not stipulated in this standard shall be in accordance with the Pollution Impact Category of the Technical Guidelines for Environmental Protection Acceptance of Construction Projects (Ministry of Ecology and Environment) Report No. 9 of 2018) Annex implementation.

2 Normative references

This standard refers to the following documents or clauses thereof. For dated references, only the dated version applies to this standard.

For undated references, the latest edition (including all amendments) applies to this standard.

GB 3096 Acoustic Environment Quality Standard GB 5085.7 General Rules for Identification Standard of Hazardous Waste GB 12348 Industrial Enterprise Boundary Environmental Noise Emission Standard GB 13271 Boiler Air Pollutant Emission Standard GB 14554 Emission Standard of Odor Pollutants GB 16297 Comprehensive Emission Standard of Air Pollutants GB 18484 Standard for Pollution Control of Hazardous Waste Incineration GB 18597 Hazardous Waste Storage Pollution Control Standard GB 18599 General Industrial Solid Waste Storage and Landfill Pollution Control Standard GB 31571 Pollutant discharge standard for petrochemical industry GB 34330 General Rules for the Identification Standard of Solid Waste GB/T 8170 Numerical Rounding Rules and Representation and Judgment of Limit Values GB/T 14581 Technical Guidelines for Sampling of Water Quality in Lakes and Reservoirs GB/T 16157 Determination of particulate matter in exhaust gas from stationary pollution sources and sampling methods for gaseous pollutants HJ/T 52 Technical Guidance for Water Quality River Sampling HJ/T 55 Technical guidelines for monitoring fugitive emissions of air pollutants HJ 75 Technical Specification for Continuous Monitoring of Flue Gas (SO2, NOx, Particulate Matter) Emissions from Stationary Pollution Sources HJ 76 Technical requirements and testing methods for continuous monitoring system for emission of flue gas (SO2, NOx, particulate matter) from stationary sources HJ/T 91 Technical Specification for Surface Water and Sewage Monitoring HJ 91.1 Technical Specification for Wastewater Monitoring HJ/T 92 Technical Specifications for Monitoring Total Discharge of Water Pollutants HJ 164 Technical Specification for Groundwater Environmental Monitoring HJ/T 166 Technical Specification for Soil Environment Monitoring HJ 194 Technical Specification for Manual Monitoring of Ambient Air Quality HJ/T 255 Technical Specifications for Environmental Protection Acceptance of Completion of Construction Projects for Thermal Power Plants

5 Start acceptance

5.1 Collect acceptance data

The collected acceptance data includes environmental protection data, engineering data related to environmental protection, and drawing data. For the list of acceptance documents, please refer to the attached Record C.

5.2 Develop an acceptance work plan

Formulate the acceptance work plan, clarify the acceptance monitoring method of the enterprise's self-test or entrust the technical organization to monitor, and the acceptance work schedule.

6 Acceptance self-check

6.1 Purpose of self-examination

Self-inspection on the implementation of environmental protection procedures, the completion of projects and environmental protection facilities, and the environmental impact report (form) and its the consistency of the approval decision of the approval department, to determine whether it has the conditions to carry out the acceptance work as planned; self-check the distribution of pollution sources and pollutant discharge the situation and the setting of the discharge outlet, etc., are used as the basis for formulating the acceptance monitoring plan.

6.2 Self-inspection content

6.2.1 Implementation of environmental protection procedures

The performance of environmental protection formalities includes the project environmental impact report (form) and its approval by the approval department; if there is a major change, the the completion of the corresponding approval procedures; the implementation of the project supervision, inspection and rectification requirements by the national and local ecological environment authorities;

License application, etc.

6.2.2 Construction of the project

Comparing with the environmental impact report (table) and the approval decision of the approval department, self-examination of the main project, storage and transportation projects, public and auxiliary projects and compliance Construction of supporting projects, etc. See Table D.1 to Table D.4 in Appendix D for the content of self-inspection.

6.2.3 Completion of environmental protection facilities
6.2.3.1 Pollution control/disposal facilities

Comparing with the environmental impact report (form) and the approval decision of the approval department, self-examination of waste gas, waste water, noise, solid waste pollution control/the completion of disposal facilities shall be used as the basis for determining the monitoring contents such as monitoring points and factors in the acceptance monitoring plan. See Appendix D for the content of the self-examination in Table D.5 to Table D.8.

6.2.3.2 Construction of other environmental protection facilities

Comparing with the environmental impact report (form) and the approval decision of the approval department, self-inspect the completion of other required supporting environmental protection facilities, as the basis for determining the inspection content in the acceptance monitoring plan. See Table D.9 in Appendix D for the content of self-inspection.

6.3 Self-examination results

Or the environmental impact report (form) has not been approved, and the environmental impact report (form) and the approval decision of the approval department have not been approved.

Environmental protection facilities, and those who should have obtained but have not obtained a pollutant discharge permit, should go through relevant procedures or rectify before continuing the acceptance work.

The self-inspection found that the location of the pollutant discharge outlet or the pollutant discharge method, the discharge destination, the number of pollutant discharge outlets or the type of pollutant discharge.

If the pollutant discharge permit is inconsistent with the pollutant discharge permit, a new pollutant discharge permit shall be applied in accordance with the provisions of the Regulations on the Administration of Pollutant Discharge Permits.

If the discharge outlet does not meet the monitoring conditions, such as the sampling platform and sampling hole setting are not standardized, it should be rectified in time to ensure the quality of the on-site monitoring data.

Quantity and monitoring personnel safety.

7 Prepare the acceptance monitoring plan

7.1 Compilation principle of acceptance monitoring plan

Ethylene engineering enterprises should determine the project acceptance monitoring content according to the results of the acceptance self-inspection, and formulate an acceptance monitoring plan.

For a project with a simple content, the content of the acceptance monitoring plan can be appropriately simplified, but it should include acceptance execution standards, monitoring points, monitoring factors, monitoring frequency, etc.

7.2 Contents and requirements of acceptance monitoring plan

7.2.1 Contents of acceptance monitoring plan

The content of the acceptance monitoring plan generally includes the project overview, acceptance basis, project construction, environmental protection facilities, acceptance implementation standards, Acceptance monitoring content, quality assurance and quality control, etc. See Appendix E for the content of the acceptance monitoring plan, and the recommended monitoring and analysis methods for acceptance monitoring refer to See Appendix F.

7.2.2 Acceptance Execution Criteria

Acceptance and implementation standards include pollutant discharge standards and ecological environment quality standards.

The relevant requirements of the annex to the Technical Guidelines for Pollution Impacts" shall be implemented.

The emission and control of air pollutants and water pollutants in ethylene engineering projects and their production facilities mainly implement GB 31571, Odor Pollutants GB 14554 for emissions, GB 13271 for supporting power boilers (non-thermal power generating units), and tail gas from hazardous waste incinerators GB 18484, GB 12348 for environmental noise at factory boundaries, GB 5085.7, GB 34330, GB for solid waste identification, utilization and disposal 18597, GB 18599, etc. The environmental impact report (form) and the approval decision of the approval department or the standards or limits required by the pollutant discharge permit If the value is stricter than the above-mentioned standard, its stipulation shall prevail.

The environmental quality assessment around the ethylene project shall implement the currently valid ecological environment quality standards.

The treatment efficiency of environmental protection facilities shall be implemented in accordance with the relevant standards and the approval decision of the environmental impact report (form) approval department.

7.2.3 Contents of acceptance monitoring
7.2.3.1 Effect monitoring of commissioning and operation of environmental protection facilities

a) Pollutant emission monitoring

1) Monitoring of organized waste gas emissions, and monitoring of unorganized waste gas emissions at the factory boundary.

2) Pollutant discharge monitoring of workshop or production facility waste water discharge outlets, total waste water discharge outlets, and rainwater discharge outlets (when there is flowing water), Wastewater monitoring with reuse or indirect discharge requirements in the environmental impact report (form) and its approval decision by the approval department.

3) Monitoring of environmental noise at the factory boundary.

b) Monitoring of treatment efficiency of environmental protection facilities Relevant standards, environmental impact reports (forms) approval departments have requirements for the treatment efficiency of environmental protection facilities in the approval decision, should be carried out.

When the amount is the same, the concentration value can be directly used to calculate the treatment efficiency.

f) According to the requirements of GB/T 8170 and HJ 630, the judgment, processing and data revision of abnormal values shall be carried out.

9 Prepare acceptance monitoring report (table)

9.1 Main content of acceptance monitoring report (table)

The main contents of the acceptance monitoring report (table) should include the project overview, acceptance basis, project construction, environmental protection facilities, acceptance Implementation standards, acceptance monitoring content, quality assurance and quality control results, acceptance monitoring results and acceptance monitoring conclusions. Acceptance monitoring report (table) for the recommended format, please refer to Appendix 2 in the Appendix of the "Technical Guidelines for Environmental Protection Acceptance of Construction Projects Completion and Pollution Impacts".

9.2 Quality Assurance and Quality Control Results

On the basis of the "Quality Assurance and Quality Control" chapter of the acceptance monitoring plan, supplement the ability of the personnel participating in the acceptance monitoring.

Indicate the quality assurance and quality control measures taken, and list the names, models, number, corresponding calibration, quality assurance and quality control results, etc.

9.3 Acceptance monitoring results

9.3.1 Production conditions

The list describes the actual working conditions during the monitoring period, the key parameters that determine or affect the working conditions, and the main parameters that reflect the operating status of the environmental protection facilities.

To index.

9.3.2 Effect of commissioning and operation of environmental protection facilities
9.3.2.1 Pollutant discharge monitoring results

According to the acceptance monitoring data, evaluate whether the monitoring results of waste gas, waste water, and boundary environmental noise meet the relevant standards.

According to the monitoring results of the "new and old" facilities, evaluate whether the pollutant discharge meets the requirements of relevant standards.

9.3.2.2 Monitoring results of treatment efficiency of environmental protection facilities

Calculate the treatment efficiency of major pollutants and evaluate the treatment efficiency of environmental protection facilities according to the monitoring results of the inlet and outlet of waste gas and wastewater treatment facilities Whether the rate complies with the relevant standards and the approval decision requirements of the environmental impact report (form) approval department. If it does not meet the requirements, the reasons should be analyzed.

If the monitoring conditions are not monitored, the reasons shall be explained.

9.3.3 Impact of project construction on environmental quality

According to the acceptance monitoring data, evaluate the environmental quality of environmental sensitive targets such as ambient air, surface water, groundwater, seawater, acoustic environment, soil, etc.

Whether the monitoring results meet the relevant standards. If it exceeds the standard, the reasons should be analyzed. For monitoring factors without evaluation criteria, just list Monitoring results, not evaluation.

9.4 Acceptance monitoring conclusion

9.4.1 Effect of commissioning and operation of environmental protection facilities
9.4.1.1 Pollutant discharge monitoring results

Briefly describe whether the monitoring results of various pollutants such as waste gas, waste water, and boundary environmental noise meet the requirements of relevant standards.

9.4.1.2 Monitoring results of treatment efficiency of environmental protection facilities

Briefly describe whether the treatment efficiency of major pollutants in environmental protection facilities such as waste gas and waste water complies with relevant standards, and the environmental impact report (form) review Approval decision requirements of the approval department.

9.4.2 Impact of project construction on environmental quality

If environmental quality monitoring is involved, evaluate the ambient air, surface water, groundwater, seawater, acoustic environment, soil and other sensitive targets surrounding the project.

Whether the results of environmental quality monitoring such as soil meet the relevant standards.

9.4.3 Implementation of environmental protection facilities

Briefly describe whether the environmental impact report (form) and the approval decision of the approval department have implemented the waste gas, waste water and noise treatment facilities, solid Waste utilization and disposal facilities, environmental risk prevention facilities, groundwater pollution prevention and control facilities, soil pollution prevention and control facilities, online monitoring facilities, the requirements of various environmental protection facilities such as "new and old" facilities.

9.5 Attachment of acceptance monitoring report (table)

The annex to the report is the main proof or supporting materials involved in the content of the acceptance monitoring report (table), mainly including the environmental impact of the approval department Approval decision of report (table), monitoring data report, description of project changes, agreement on entrusted utilization and disposal of hazardous waste and disposal unit Qualification certificate, etc.

10 Follow-up acceptance work

After the acceptance monitoring report is completed, enter the follow-up acceptance work procedure, put forward acceptance opinions, and prepare "other matters that need to be explained".

Form an acceptance report and disclose it to the public, log in to the National Construction Project Completion Environmental Protection Acceptance Information System Platform to fill in relevant information, and establish a file case. Refer to Appendix G for the recommended method for subsequent acceptance work.

Acceptance opinions shall include the basic situation of project construction, project changes, implementation of environmental protection facilities, commissioning and operation of environmental protection facilities.

The effect of the project, the impact of the project construction on the environment, the main problems existing in the project, the acceptance conclusion and the follow-up requirements.

"Other Items to be Explained" should truthfully record the design, construction, and acceptance process of the project's environmental protection facilities, as well as the pollutant discharge permit.

The implementation of the certificate and the implementation of the regional reduction plan, the environmental impact report (form) and the environmental protection requirements proposed in the approval decision of the approval department the implementation of other environmental protection measures outside the protection facility and the rectification work.

For the compilation content and requirements of the acceptance opinions and "other matters that need to be explained", please refer to the "Technical Guidelines for Environmental Protection Acceptance of Construction Projects Completion" Appendices 4 and 5 in the "Pollution Impact Category" annex.

The acceptance report is a summary document that records the environmental protection acceptance process and results of the completed construction project, including the acceptance monitoring report and acceptance opinions.

and "other matters that need to be explained".

Appendix E

(informative appendix) Acceptance monitoring plan content E.1 Project Overview Briefly describe the project name, nature, scale, location, the process of environmental impact assessment, design, construction, approval and other information, as well as the approval document number, etc.

Project start, completion, commissioning time, application for pollutant discharge permit, actual total project investment and environmental protection investment.

Clarify the scope of acceptance, such as phased acceptance, the scope of this acceptance shall be stated; the organization and implementation plan of acceptance monitoring work shall be described.

E.2 Acceptance basis

a) Laws, regulations and rules and regulations related to environmental protection of construction projects.

b) Technical specifications for acceptance of environmental protection (facilities) upon completion of construction projects.

c) The environmental impact report (form) of the construction project and the approval decision of the approval department.

d) Other relevant documents of the competent department of ecological environment.

E.3 Project construction situation E.3.1 Geographical location and layout Briefly describe the construction site and surrounding environment of the project, and attach the actual location map and floor plan of the project.

The geographic location map indicates the distribution of environmental protection sensitive targets around the project, and the relative position of the sensitive targets to the factory boundary or major pollution sources.

location and distance.

The floor plan highlights the main production units, organized exhaust stacks, waste and storm water outlets, solid waste storage sites, the location of the accident pool, etc., the noise monitoring point, and the monitoring point of fugitive emission waste gas can also be marked on the map.

E.3.2 Project construction content Briefly describe the project's production scale, project composition, construction content, products, and actual total investment; for renovation, expansion and technological transformation projects, the original project and public and auxiliary facilities should be briefly introduced, as well as the relationship between the project and the original project, and the requirements of "bringing the old with the new";

Periodic acceptance items need to clearly state the content of the periodical acceptance.

E.3.3 Main raw and auxiliary materials and fuel the list shows the name, source, design consumption, and consumption during commissioning of main raw materials, auxiliary materials, and fuels.

For coal-fired boilers, the fuel design and the ash content, sulfur content, volatile content and calorific value of the actual coal shall be listed.

E.3.4 Water source and water balance Briefly describe the sources of water for production and domestic use, the amount of fresh water, the amount of circulating water, the amount of waste water reused and the amount of discharge.

The water balance of a construction project is mainly represented by a diagram.

E.3.5 Production process Briefly describe the main production process principles and processes, and attach a schematic diagram of the actual production process and the production and discharge links of the project.

E.3.6 Project changes the list shows the main changes of the project, including the environmental impact report (table) and the approval decision requirements of the approval department, the actual Explanation of whether there are relevant changes that are significant changes.

E.4 Environmental Protection Facilities E.4.1 Pollution control/disposal facilities E.4.1.1 Waste gas treatment facilities

a) List the exhaust gas name, source, pollutant type, process and scale of treatment facilities, design indicators, and emission methods (there are groups of woven, unorganized), the height and inner diameter of the exhaust pipe, the direction of the discharge, the setting of monitoring points or openings of the treatment facilities, etc.

b) Briefly describe the process flow of the waste gas treatment facilities, attach a schematic diagram of the main waste gas treatment process flow, attach the waste gas sampling platform, Photos of sample wells, discharge outlets, online monitoring facilities, etc.

E.4.1.2 Wastewater treatment facilities

a) List the types of wastewater, sources, types of pollutants, process and treatment capacity of treatment facilities, design indicators, amount of wastewater reuse, Emission amount, emission law (continuous, intermittent), emission destination, etc.

b) Briefly describe the process flow of the wastewater treatment facilities, with the main wastewater treatment process flow chart, the whole plant wastewater (including polluted rainwater) Schematic diagram of the flow direction, with photos of wastewater treatment facilities, total wastewater outlets and online monitoring facilities.

E.4.1.3 Noise control facilities/measures the list describes the name, source intensity, quantity, location, operation mode and treatment facilities/measures of noise source equipment (such as sound insulation, noise reduction, vibration reduction, equipment selection, setting protective distance, layout, etc.), with photos of noise control facilities.

E.4.1.4 Solid waste treatment and disposal facilities

a) List the name, source, nature, category code of solid (liquid) waste (if it is a hazardous waste, it should be listed), production volume, profit Disposal quantity, storage quantity, utilization and disposal method, etc.; with entrusted utilization and disposal contract, entrusting unit qualification, hazardous waste transfer Forms and other related information.

b) Explain the setting of temporary storage sites for solid (liquid) waste, and attach relevant photos.

c) In the case of a solid (liquid) waste storage site, state the location of the storage site, the distance from the plant, and the type (such as valley type or flat type).

prototype), storage method, design scale and service life, conveying method, conveying distance, site water collection and drainage system, site area Anti-seepage system, pollutants and pollution prevention and control facilities, environmental sensitive points around the site, etc.

E.4.2 Other environmental protection facilities E.4.2.1 Environmental risk prevention facilities

a) Atmospheric environment risk prevention facilities. automatic control and leak detection system setup, toxic and harmful gas leak monitoring and early warning system and emergency disposal measures for leakage, flare handling capacity, and ignition method.

b) Water environment risk prevention facilities. accident sewage (including polluted fire water and polluted rainwater) and emergency storage facilities for leaked materials, including Including the cofferdam of the production unit and the setting of the fire dike in the tank area, the number, location and effective volume of the accident pool. Accident emergency cut-off facility, Including the switching valve of rainwater system and sewage treatment facilities, accident sewage (including polluted fire water and polluted rainwater) entering sewage the switching valve of the management facility, the shut-off facility between the main waste water discharge outlet and the external water body, etc. Environmental risks related to park/regional accident sewage the construction and status of the communication facilities of the prevention and control facilities.

c) Groundwater and soil environmental risk prevention facilities. seepage prevention in key areas, construction of groundwater monitoring wells, etc.

d) Emergency equipment, supplies, material allocation, etc.

E.4.2.2 Standardize sewage outlets, monitoring facilities and online monitoring systems Briefly describe the standardization of waste gas and waste water discharge outlets and the construction of monitoring facilities, such as the construction of waste gas sampling platforms, passages leading to sampling platforms, Sampling holes, etc.; installation location, quantity, model, monitoring factor, monitoring data, etc. of online monitoring facilities.

E.4.2.3 Other facilities Briefly describe the environmental impact report (form) and the approval decision of the approval department to "bring the old with the new", shut down or demolish existing facilities process (old units or installations), and the implementation of outdated production installations.

E.4.3 Investment in environmental protection and implementation of the "Three Simultaneities" List the actual total investment, environmental protection investment and environmental Conservation investment as a percentage of total investment.

The list shows the environmental impact report (form) of each environmental protection facility and its approval decision, design, and actual construction.

E.5 Acceptance Execution Criteria According to the monitoring content category and monitoring factors, etc., the acceptance standards and limits are listed in a list.

E.6 Acceptance monitoring content According to the monitoring content category, list the acceptance monitoring points, factors, frequency, etc.

E.7 Quality Assurance and Quality Control Acceptance monitoring should be carried out under the condition that the main project is stable and the environmental protection facilities are operating normally, to ensure the generation of monitoring data.

surface.

Acceptance monitoring sampling methods, monitoring analysis methods, monitoring quality assurance and quality control measures are implemented in accordance with HJ 819.

Appendix G

(informative appendix) Recommended method for follow-up acceptance work G.1 Put forward acceptance opinion G.1.1 Establish acceptance working group Building...

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 23 pages — is available in the English PDF.

Referenced standards

How to Download HJ 406-2021

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
23 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

HJ 406-2021

$624.00