GB/Z 35031.8-2021Customer energy management system - Part 8: Use cases (English PDF)
用户端能源管理系统 第8部分:用例
This is a limited preview
Buy now to download the full PDF (16 pages)
Need quotation for your management?
Get a formal quotation for GB/Z 35031.8-2021 in 30 minutes.
Issued by
State Administration for Market Regulation; Standardization Administration of China
Level / Type
National · Recommended
Issue date
March 9, 2021
Implementation date
March 9, 2021
Scope
GB/Z 35031.8-2021 is the English-translated version of 用户端能源管理系统 第8部分:用例.
GB/Z 35031.8-2021 is the Chinese standard "Customer energy management system - Part 8: Use cases".
Its scope clause reads: This part of GB/T 35031 defines the main participants, energy service items, use case codes and use cases of the user-side energy management system The scenario code, use case layout and use case template include the use cases of the client energy management system (CEMS) compiled accordingly.
This part is compiled for the understanding and design of the user-side energy management system, and is suitable for analyzing the actual application field of the user-side energy management system.
Participants in the scene, the connection between participants and participants, information interaction, and the sequence of information interaction. Its clauses include terms, definitions and abbreviations.
Found what you need?
Document preview — GB/Z 35031.8-2021
National Standard of the People's Republic of China
- ICS
- 29.020
- Classification
- K00
Issued by: State Administration for Market Regulation; Standardization Administration of China
Contents
- Foreword
- 1 Scope
- 2 Normative references
- 3 Terms, definitions and abbreviations
- 3.1 Terms and definitions
- 3.2 Abbreviations
- 4 Major CEMS Participants
- 4.1 Diagram of CEMS Participants
- 4.2 CEMS participant description
- 5 Client Energy Service Project (CEMS-SP)
- 6 Use case code and scenario code
- 6.1 Use Case Code (Use Case ID)
- 6.2 Scene code (scene ID)
- 7 CEMS use case layout
- 7.1 CEMS use case classification
- 7.2 CEMS use case layout
- 8 CEMS use case template
- 9 CEMS use case collection
- Appendix A (normative appendix) CEMS use case template
- Appendix B (informative appendix) CEMS use case collection
1 Scope
This part of GB/T 35031 defines the main participants, energy service items, use case codes and use cases of the user-side energy management system
The scenario code, use case layout and use case template include the use cases of the client energy management system (CEMS) compiled accordingly.
This part is compiled for the understanding and design of the user-side energy management system, and is suitable for analyzing the actual application field of the user-side energy management system.
Participants in the scene, the connection between participants and participants, information interaction, and the sequence of information interaction.
2 Normative references
The following documents are indispensable for the application of this document. For dated reference documents, only the dated version applies to this article
Pieces. For undated reference documents, the latest version (including all amendments) is applicable to this document.
GB /Z 32500-2016 General requirements for data interface of smart grid user-end systems
GB /Z 32501-2016 General requirements for smart grid user-side communication systems
GB/T 35031.1-2018 User-side energy management system Part 1.Guidelines
GB/T 35031.2-2018 User-side energy management system Part 2.Master station function specification
GB/T 35031.301-2018 User-side Energy Management System Part 3-1.General Requirements for Subsystem Interface Gateway
GB/T 35031.6-2019 User-side Energy Management System Part 6.Management Index System
GB/T 39260.2-2020 Use Case Method Part 2.Definition of Use Case Template, Participant List and Requirements List
3 Terms, definitions and abbreviations
3.1 Terms and definitions
The following terms and definitions defined in GB/T 39260.2-2020 and GB/T 35031.6-2019 apply to this document. in order to
For ease of use, some terms and definitions in GB/T 39260.2-2020 and GB/T 35031.6-2019 are repeatedly listed below.
3.1.1 Usecase
Description of a series of activities completed by the system, the significant results that these activities can produce are usually one or more participation in the system
Parties or other stakeholders have value.
[GB/T 39260.2-2020, definition 3.1]
3.1.2 Usecasetemplate
A table for structured description of use cases in predefined fields.
[GB/T 39260.2-2020, definition 3.4]
3.1.3 Actor
The entity of communication and interaction.
Note. Rewrite GB/T 39260.2-2020, definition 3.2.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 16 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 35031.1-2018Customer energy management system—Part 1: Guideline
- GB/T 35031.2-2018Customer energy management system—Part 2: Functional specification of master station
- GB/T 35031.301-2018Customer energy management system—Part 3-1: General requirements for subsystem gateway
- GB/T 35031.6-2019Customer energy management system—Part 6: Management indicator system
- GB/T 39260.2-2020Use case methodology - Part 2: Definition of the templates for use cases, actor list and requirements list
Similar standards
Editions of GB/Z 35031.8
| Edition | Title | Revision | Status |
|---|---|---|---|
| GB/Z 35031.8-2021 | Customer energy management system - Part 8: Use cases | current edition | Current |
This page sells the current edition, GB/Z 35031.8-2021. Earlier editions are listed for reference only.
How to Download GB/Z 35031.8-2021
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 35031.1-2018 — Customer energy management system—Part 1: Guideline
GB/T 35031.2-2018 — Customer energy management system—Part 2: Functional specification of master station
GB/T 35031.301-2018 — Customer energy management system—Part 3-1: General requirements for subsystem gateway
Secure payment via Stripe
Payments accepted
GB/Z 35031.8-2021
$2,585.00