GB/T 8117.4-2017Rules for steam turbine thermal acceptance test—Part 4: Method D—Simplified performance test rules for steam turbine and its thermal cycle (English PDF)
汽轮机热力性能验收试验规程 第4部分:方法D 汽轮机及其热力循环简化性能试验
This is a limited preview
Buy now to download the full PDF (34 pages)
Need quotation for your management?
Get a formal quotation for GB/T 8117.4-2017 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
November 1, 2017
Implementation date
May 1, 2018
Scope
GB/T 8117.4-2017 is the English-translated version of 汽轮机热力性能验收试验规程 第4部分:方法D 汽轮机及其热力循环简化性能试验.
GB/T 8117.4-2017 is the Chinese standard "Rules for steam turbine thermal acceptance test—Part 4: Method D—Simplified performance test rules for steam turbine and its thermal cycle".
Its scope clause reads: This part of GB/T 8117 applies to wide-area steam turbine performance test running in superheated steam zone or saturated steam zone, applicable Turbines for various types, capacity classes and uses.
This section is mainly used for turbine performance monitoring test can be used before and after the turbine overhaul test can also be used in accordance with the implementation of this section small Turbine's guaranteed value verification, but not for large-scale steam turbine thermal performance acceptance test.
This section includes all types of thermal performance test is as follows. a) The whole machine cycle thermal efficiency or heat rate; b) the maximum output or output under the specified conditions; c) steam consumption rate; d) cylinder efficiency; e) pressure and temperature characteristics; f) the relationship between power and steam flow; g) Flow capacity; h) Feedwater heater performance monitoring; i) Condenser Performance Monitoring (etc).
This section does not include an analysis of the uncertainty of steam quality measurements. The purpose of this section is to give simple and practical test methods with different accuracies to provide the required tests for performance monitoring and diagnosis result.
If you take some of the measures highlighted in this section can also be used to verify the manufacturer's warranty value. Its clauses include scope and purpose.
Found what you need?
Document preview — GB/T 8117.4-2017
National Standard of the People's Republic of China
- ICS
- 27.040
- Classification
- K 54
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Foreword
- 1 Scope and purpose
- 1.1 Scope
- 1.2 Purpose
- 2 Normative references
- 3 Terms and definitions, symbols and definitions
- 3.1 Terms and definitions
- 3.2 Symbols and definitions
- 4 guidelines
- 4.1 The establishment of the thermal system boundary
- 4.2 Type of thermal performance test
- 4.3 Uncertainty Analysis
- 4.4 Pre-test plan
- 4.5 Test Outline
- 4.6 Test time
- 4.7 Preparation before testing
- 4.8 Preliminary test
- 4.9 Test Tuning
- 4.10 Test conditions
- 5 Measurement Technology and Measuring Instruments
- 5.1 General
- 5.2 Power Measurement
- 5.3 Traffic Measurement
- 5.4 Pressure Measurement
- 5.5 Temperature Measurement
- 5.6 Steam quality measurement
- 5.7 Speed Measurement
- 5.8 Time Measurement
- 6 Calculation of test results
- 6.1 Preparation before calculation
- 6.2 Calculation of the results
- 7 Correction of test results and comparison with benchmark performance or guaranteed value
- 7.1 Benchmark Performance
- 7.2 Guaranteed value and guaranteed conditions
- 7.3 Main Steam Flow Correction
- 7.4 maximum output correction
- 7.5 Thermal efficiency and thermodynamic efficiency of the amendment
- 7.6 Definition and Application of Correction Values
- 7.7 Amendment
- 7.8 amendments to be considered parameters
- 7.9 Test tolerance
- 7.10 Turbine Performance Aging
- 7.11 Guaranteed value comparison
- Appendix A (informative) steam turbine and its thermodynamic simplified basic performance testing
- Appendix B (informative) Guidance for the choice of test type
- Appendix C (Informative) Example of Multiple Measures
1 Scope and purpose
1.1 Scope
This part of GB/T 8117 applies to wide-area steam turbine performance test running in superheated steam zone or saturated steam zone, applicable
Turbines for various types, capacity classes and uses.
This section is mainly used for turbine performance monitoring test can be used before and after the turbine overhaul test can also be used in accordance with the implementation of this section small
Turbine's guaranteed value verification, but not for large-scale steam turbine thermal performance acceptance test.
This section includes all types of thermal performance test is as follows.
a) The whole machine cycle thermal efficiency or heat rate;
b) the maximum output or output under the specified conditions;
c) steam consumption rate;
d) cylinder efficiency;
e) pressure and temperature characteristics;
f) the relationship between power and steam flow;
g) Flow capacity;
h) Feedwater heater performance monitoring;
i) Condenser Performance Monitoring (etc).
This section does not include an analysis of the uncertainty of steam quality measurements.
1.2 purpose
The purpose of this section is to give simple and practical test methods with different accuracies to provide the required tests for performance monitoring and diagnosis result.
If you take some of the measures highlighted in this section can also be used to verify the manufacturer's warranty value.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version applies to this article
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 8117.1-2008 Steam turbine thermal performance acceptance test procedures - Part 1. Method A Large condensing steam turbine high
Accuracy test
GB/T 8117.2-2008 Steam turbine thermal performance acceptance test procedures - Part 2. Method B Steam turbine of various types and capacities
Machine width accuracy test
GB/T 8117.3-2014 Steam turbine thermal performance acceptance test procedures - Part C. Method C steam turbine thermal performance test
Card test
Power station boiler performance test code […]
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 34 pages — is available in the English PDF.
Referenced standards
Similar standards
How to Download GB/T 8117.4-2017
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 8117.1-2008 — Rules for steam turbine thermal acceptance tests -- Part 1: Method A -- High accuracy for large condensing steam turbines
GB/T 8117.2-2026 — Rules for steam turbine thermal acceptance tests - Part 2: Wide range of accuracy for various types and sizes of turbines
GB/T 8117.2-2008 — Rules for steam turbine thermal acceptance tests - Part 2: Wide range of accuracy for various types and sizes of turbines
Secure payment via Stripe
Payments accepted
GB/T 8117.4-2017
$510.00