Obsolete

GB/T 50378-2006Green Building Evaluation Standard (English PDF)

绿色建筑评价标准

Preview PDF

GB/T 50378 | Evolution and historical versions

Std IDTitleStatus
GB/T 50378-2019Assessment standard for green buildingObsolete
GB/T 50378-2014Assessment Standard for Green BuildingObsolete
GB/T 50378-2006Green Building Evaluation StandardObsolete

GB/T 50378-2006 is obsolete. It has been replaced by GB/T 50378-2014. This page sells the obsolete edition, for projects and contracts that still cite it.

This is a limited preview

Buy now to download the full PDF

Need quotation for your management?

Get a formal quotation for GB/T 50378-2006 in 30 minutes.

Issued by

Ministry of Construction

Level / Type

National · Recommended

Issue date

March 7, 2006

Implementation date

June 1, 2006

Scope

GB/T 50378-2006 is the English-translated version of 绿色建筑评价标准.

GB/T 50378-2006 is the Chinese national standard "Green Building Evaluation Standard". It was issued on March 7, 2006 by the Ministry of Construction, and took effect on June 1, 2006. It is obsolete: it has been replaced by GB/T 50378-2014.

Found what you need?

Document preview — GB/T 50378-2006

National Standard of the People's Republic of China

Issued by: Ministry of Construction

Contents

  • Document data
1 Document data

Sector: National standard (Recommended).

Issuing body: Ministry of Construction.

Date of issue: 2006-03-07.

Date of implementation: 2006-06-01.

Status: obsolete, replaced by GB/T 50378-2014.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.

Referenced standards

How to Download GB/T 50378-2006

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 50378-2006

$135.00