Valid

GB/T 50378-2019Assessment standard for green building (English PDF)

Also coversGBT50378-2019

Open the GB/T 50378-2019 preview as PDF

Preview — first pages of GB/T 50378-2019

This is a limited preview

Buy now to download the full PDF

Issued by

MOHURD

Level / Type

National · Recommended

Issue date

March 20, 2019

Implementation date

March 20, 2019

Scope

GB/T 50378-2019 (Assessment standard for green building) is available as an English-translated PDF.

GB/T 50378-2019 — This standard applies to the assessment of the green performance of civil buildings.

Document preview — GB/T 50378-2019

National Standard of the People's Republic of China

Issued by: MOHURD

Contents

  • Foreword5
  • 1 General provisions7
  • 2 Terms7
  • 3 Basic requirements8
  • 4 Safety and durability12
  • 5 Health and comfort15
  • 6 Occupant convenience20
  • 7 Resource saving24
  • 8 Environment livability33
  • 9 Promotion and innovation38
  • Explanation of wording in this standard40
  • List of quoted standards41

1 General provisions

1.0.1 In order to implement the concept of green development, promote the

high-quality development of green buildings, save resources, protect the environment, meet the people's growing needs for a better life, this standard is formulated.

1.0.2 This standard applies to the assessment of the green performance of civil

buildings.

1.0.3 The assessment of green buildings shall follow the principle of adapting

measures to local conditions, combining the characteristics of the climate, environment, resources, economy and culture of the area where the building is located, to make comprehensive assessment of such performances as safety, durability, health and comfort, living convenience, resource conservation, and environmental livability.

1.0.4 The site design and architectural layout of green buildings shall be

combined with the topography and geomorphology; the architectural layout shall be adapted to the climatic conditions and geographical environment of the site; the wind environment, light environment, thermal environment, acoustic environment of the site shall be organized and utilized.

1.0.5 In addition to complying with the provisions of this standard, the

assessment of green buildings shall also comply with the provisions of relevant national standards.

2 Terms

2.0.1 Green building

A high-quality building which, during the whole life cycle, saves resources, protects the environment, reduces pollution, provides people with healthy, applicable and efficient use of space, maximizes the realization of harmonious coexistence between man and nature.

2.0.2 Green performance

It involves the comprehensive performance of building safety and durability, health and comfort, living convenience, resource saving (land saving, energy saving, water saving, material saving) and environmental livability.

2.0.5 Green building material

The building materials which, during the whole life cycle, can reduce the consumption of resources and reduce the impact on the ecological environment, has the characteristics of energy saving, emission reduction, safety, health, convenience and recyclability.

3 Basic requirements

3.1 General requirements

3.1.1 The green building assessment shall take a single building or a group of

buildings as the assessment object. The assessment object shall implement and deepen the green development requirements as put forward by the upper-level statutory planning and related special plans; the systematic and holistic indicators shall be evaluated based on the overall situation of the engineering project to which the building belongs.

3.2 Assessment and rating

3.2.1 The green building assessment index system shall be composed of five

types of indicators, including safety and durability, health and comfort, living convenience, resource conservation, environmental livability; each type of index includes prerequisite items and scoring items. The assessment index system also sets bonus item uniformly.

3.2.2 The assessment results of prerequisite items shall be up to standard or

not up to standard; the assessment results of scoring items and bonus items shall be scores.

4 Safety and durability

4.1 Prerequisite items

4.1.1 The site shall avoid geologically dangerous areas such as landslides and

mudslides. The flood-prone areas shall have reliable flood control infrastructure;

the site shall be free from threats of hazardous chemicals, flammable and explosive sources; it shall be free from hazards of electromagnetic radiation and radon-containing soil.

4.1.6 The floor of the toilet and bathroom shall be provided with a waterproof

layer; the wall and ceiling shall be provided with a moisture-proof layer.

4.1.7 Passage spaces such as corridors and evacuation passages shall meet

the requirements of emergency evacuation and emergency care; it shall be kept unblocked.

4.1.8 There shall be a warning and guidance marking system for safety

protection.

4.2 Scoring items

I Safety

4.2.8 Improve the durability of building structure materials. The total

assessment score is 10 points, which are scored based on the following rules.

4.2.9 Reasonably use durable and easy-to-maintain decoration building

materials. The total assessment score is 9 points, which are respectively scored and accumulated according to the following rules.

5 Health and comfort

5.1 Prerequisite items

5.1.1 The concentration of pollutants such as ammonia, formaldehyde, benzene, total volatile organic compounds and radon in the indoor air shall comply with the relevant requirements of the current national standard "Indoor air quality standard" GB/T 18883.Smoking shall be prohibited inside the building and at the main entrance and exit of the building; no smoking signs shall be set up in prominent locations.

5.1.4 The indoor noise level and sound insulation performance of the main

functional rooms shall meet the following requirements.

5.1.7 The thermal performance of the enclosure structure shall meet the

following requirements.

5.1.8 The main function room shall have a thermal environment adjustment

device independently controlled on site.

5.1.9 The underground garage shall be equipped with a carbon monoxide

concentration monitoring device linked with the exhaust equipment.

5.2 Scoring items

I Indoor air quality

5.2.1 Control the concentration of major indoor air pollutants. The total

assessment score is 12 points, which are scored and accumulated according to the following rules.

5.2.3 The water quality of direct drinking water, centralized domestic hot water, swimming pool water, heating and air-conditioning system water, landscape water meets the requirements of the current national standards. The assessment score is 8 points.

5.2.7 The sound insulation performance of the main functional rooms is good.

The total assessment score is 10 points. They are respectively scored and accumulated according to the following rules.

5.2.10 Optimize the building space and plane layout, improve the natural

ventilation effect. The total assessment score is 8 points. The scoring is made according to the following rules.

5.2.11 Set up adjustable shading facilities to improve indoor thermal comfort.

The total assessment score is 9 points. It is scored according to the ratio of the area of adjustable shading facilities to the transparent part of the outer window, according to the rules in Table 5.2.11.

6 Occupant convenience

6.1 Prerequisite items

6.1.1 Buildings, outdoor venues, public green spaces, urban roads shall have

a coherent barrier-free walking system.

6.1.5 The construction equipment management system shall have automatic

monitoring and management functions.

6.1.6 The building shall be equipped with an information network system.

6.2 Scoring items

I Transit and accessibility

6.2.1 The connection between the venue and the public transportation station

is convenient. The total assessment score is 8 points, which are scored and accumulated according to the following rules.

6.2.2 The indoor and outdoor public areas of the building meet the full-age

design requirements. The total assessment score is 8 points, which are scored and accumulated according to the following rules.

6.2.3 Provide convenient public services. The total assessment score is 10

points. It is scored according to the following rules.

6.2.4 Open spaces such as urban green spaces, squares and public sports

venues can be reached on foot. The total assessment score is 5 points, which are scored and accumulated according to the following rules.

6.2.8 Set up a water remote metering system and an online water quality

monitoring system. The total assessment score is 7 points, which are scored and accumulated according to the following rules.

6.2.9 It has an intelligent service system. The total assessment score is 9 points, which are scored and accumulated according to the following rules.

7 Resource saving

7.1 Prerequisite items

7.1.1 The energy-saving design of the building's shape, plane layout, spatial

scale, envelope structure shall be combined with the natural conditions of the site and the functional requirements of the building. Meanwhile it shall comply with the relevant national energy-saving design requirements.

7.1.4 The lighting power density value of the main function room shall not be

higher than the current value specified in the current national standard "Standard for lighting design of building" GB 50034; the lighting system in the public area shall adopt energy-saving control such as partition, timing, induction;

7.1.5 The energy consumption of various parts such as cold and heat sources, transmission and distribution systems, lighting shall be measured independently and item by item.

7.1.8 Building structures with severely irregular shapes and layouts shall not be

used.

7.1.9 The architectural modeling elements shall be simple, without a large

number of decorative components; meanwhile it shall meet the following requirements.

7.2.3 Use mechanical parking facilities, underground parking garages or ground

parking buildings, etc. The total assessment score is 8 points. The score is based on the following rules.

8 Environment livability

8.1 Prerequisite items

8.1.1 The planning and layout of the building shall meet the sunshine standard, meanwhile it shall not lower the sunshine standard of surrounding buildings.

8.1.2 The outdoor thermal environment shall meet the requirements of relevant

national standards.

8.1.6 There shall be no pollution sources with excessive discharge in the site.
8.1.7 Domestic garbage shall be collected separately. The arrangement of

garbage containers and collection points shall be reasonable and coordinated with the surrounding landscape.

8.2 Scoring items

I Site ecology and landscape

8.2.3 Make full use of site space to set up greening land. The total assessment

score is 16 points. It is scored according to the following rules.

8.2.4 The layout of the outdoor smoking area is reasonable. The total

assessment score is 9 points, which are scored and accumulated according to the following rules.

8.2.7 Building and lighting design avoid light pollution. The total assessment

score is 10 points. They are scored and accumulated according to the following rules.

9 Promotion and innovation

9.1 General requirements

9.1.1 When evaluating green buildings, improvement and innovation items shall

be evaluated in accordance with the provisions of this chapter.

9.2 Bonus points

9.2.1 Take measures to further reduce the energy consumption of building

heating and air conditioning system. The total assessment score is 30 points.

The energy consumption of the heating and air-conditioning system of the building is reduced by 40% compared with the current national energy-saving standards for buildings. 10 points. For each reduction of 10%. another 5 points, at most 30 points.

9.2.5 Use structural systems and building components that meet the

requirements of industrialized construction. The assessment score is 10 points.

It is scored based on the following rules.

9.2.6 Apply building information modeling (BIM) technology. The total

assessment score is 15 points. Apply this technology in one stage of the planning, design, construction, operation and maintenance of the building. 5 points. Apply this technology in two stages. 10 points. Apply this technology in three stages. 15 points.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.

Referenced standards

How to Buy GB/T 50378-2019

  1. 1Add to cart. Click the "Buy GB/T 50378-2019" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 50378-2019

$280.00

$240.00for partners