GB/T 45019-2024Basalt fiber modified asphalt mixture for road engineering (English PDF)

道路用玄武岩纤维沥青混合料

Open the GB/T 45019-2024 preview as PDF

Preview — first pages of GB/T 45019-2024 (full document: 11 pages)

This is a limited preview

Buy now to download the full PDF (11 pages)

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

November 28, 2024

Implementation date

June 1, 2025

Scope

GB/T 45019-2024 is the English-translated version of 道路用玄武岩纤维沥青混合料.

GB/T 45019-2024 covers asphalt mixtures reinforced with basalt fibre. Adding short fibres to asphalt addresses the two ways a pavement fails: rutting, where the mix deforms permanently under wheel loads in hot weather, and cracking, where it becomes brittle in cold weather and under repeated loading. Fibres bridge microcracks and hold the binder in place, improving both at once - which conventional binder modification struggles to do, since making a mix stiffer against rutting usually makes it more brittle against cracking. Basalt fibre is drawn from melted volcanic rock, which makes it cheap, chemically stable, and unproblematic at the temperatures asphalt is mixed and laid at. What decides whether it works is dispersion: fibres that clump rather than distribute do nothing for the mix and create weak points instead. This document specifies the types and specifications, the constituent materials, the technical requirements, the inspection rules and the transport requirements for basalt fibre asphalt mixtures for roads, and applies to their production, inspection and use. Under ICS 93.080.20 and CCS Q20, it is written for asphalt producers, paving contractors and road authorities.

Document preview — GB/T 45019-2024

National Standard of the People's Republic of China

ICS
93.080.20
Classification
Q20

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • 1 Scope ...1
  • 2 Normative references ...1
  • 3 Terms and Definitions ...1
  • 4 Types and specifications ...2
  • 4.1 Type ...2
  • 4.2 Specifications ...2
  • 4.3 Identification ...2
  • 5 Materials ...2
  • 5.1 Asphalt ...2
  • 5.2 Aggregates ...2
  • 5.3 Filling ...2
  • 5.4 Basalt fiber ...2
  • 6 Technical requirements ...3
  • 6.1 Mix design requirements ...3
  • 6.2 Mixture performance requirements ...4
  • 7 Inspection Rules ...5
  • 7.1 General Provisions5
  • 7.2 Inspection categories ...5
  • 7.3 Sampling and batching6
  • 7.4 Decision Rules6
  • 6 Appendix A (Normative) Design and production requirements for basalt fiber asphalt mixture ratio ... 7 A.1 Design requirements for basalt fiber asphalt mixture ratio ... 7 A.2 Production requirements for basalt fiber asphalt mixture ratio ...7

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part

1.Structure and drafting rules for standardization documents" Drafting is required. Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents. This document was proposed by the Ministry of Housing and Urban-Rural Development of the People's Republic of China. This document is under the jurisdiction of the National Technical Committee on Concrete Standardization (SAC/TC 458). This document was drafted by: Henan Jiaotong Engineering Technology Group Co., Ltd., Ministry of Transport Science Research Institute, Henan Transportation Vocational and Technical College Institute, Shandong Transportation Planning and Design Institute Group Co., Ltd., China Academy of Building Research Co., Ltd., China Construction Seventh Engineering Bureau Co., Ltd. China Railway 12th Bureau Group Fourth Engineering Co., Ltd., Ningxia Communications Construction Co., Ltd., Henan Sitong Engineering Testing Co., Ltd., Sichuan Juyuan Basalt Fiber Technology Co., Ltd., China Communications Construction Second Highway Engineering Bureau Fourth Engineering Co., Ltd., Shenzhen Haichuan New Materials Technology Co., Ltd. Co., Ltd., Qingdao Basalt Composite Materials Research Institute, Henan Anluo Expressway Co., Ltd., and Henan Highway Engineering Bureau Group Co., Ltd. The main drafters of this document are. Shao Jinggan, Zhang Hongchun, Luo Kai, Wang Junchao, Liu Xiaowei, Liu Bo, Yang Jianqiang, Huang Yunjun, Cao Kangjun, Liu Jiaqi, Wu Zhishen, Wang Xiangang, Duan Defeng, Fu Leifeng, Hui Yingxin, Shu Xiaorui, Gong Xiongwen, Xia Jingliang, Wei Baojun, Chen Jiuan, Wu Gengshang, Li Xiaochi, Zhao Pu, Pan Yiqiang, Li Wenkai, Li Yuhai, Hou Qingfeng, Liu Jun, Wang Zhaolun, He Haiying, Chen Hongkui, Ye Yushan, Wu Jingjiang, Fan Xiaohu, Zhang Daolin, Zhang Lei, Gao Yanlong, Wang Baolin. Basalt fiber asphalt mixture for roads

1 Scope

GB/T 45019-2024 covers asphalt mixtures reinforced with basalt fibre. Adding short fibres to asphalt addresses the two ways a pavement fails: rutting, where the mix deforms permanently under wheel loads in hot weather, and cracking, where it becomes brittle in cold weather and under repeated loading. Fibres bridge microcracks and hold the binder in place, improving both at once - which conventional binder modification struggles to do, since making a mix stiffer against rutting usually makes it more brittle against cracking. Basalt fibre is drawn from melted volcanic rock, which makes it cheap, chemically stable, and unproblematic at the temperatures asphalt is mixed and laid at. What decides whether it works is dispersion: fibres that clump rather than distribute do nothing for the mix and create weak points instead. This document specifies the types and specifications, the constituent materials, the technical requirements, the inspection rules and the transport requirements for basalt fibre asphalt mixtures for roads, and applies to their production, inspection and use. Under ICS 93.080.20 and CCS Q20, it is written for asphalt producers, paving contractors and road authorities.

This document specifies the types and specifications, materials, technical requirements, inspection rules and transportation of basalt fiber asphalt mixtures for roads. This document applies to the production, inspection and use of basalt fiber asphalt mixtures for roads.

2 Normative references

The contents of the following documents constitute the essential clauses of this document through normative references in this document. For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies. in this document.

GB/T 42280 Chopped basalt fiber for road asphalt mixture CJJ

3 Terms and definitions

The following terms and definitions apply to this document.

3.1 Basalt fiber Continuous fibers are made from basalt ore through key processes such as high-temperature melting, high-speed wire drawing and surface infiltration treatment.

3.2 Chopped basalt fiber Basalt fiber raw yarn segments or basalt fiber roving segments cut to a certain length.

3.3 Content of basalt fiber The mass fraction of basalt fiber in asphalt mixture.

3.4 Basalt fiber modified asphalt mixture A mixture made by mixing mineral materials, basalt fiber and asphalt binder in a certain proportion.

3.5 Basalt fiber modified dense graded asphalt mixture Dense graded asphalt mixture with added basalt fiber.

3.6 Basalt fiber modified stone mastic asphalt mixture Asphalt mastic macadam mixture with basalt fiber as fiber stabilizer.

20 Test procedures for asphalt and asphalt mixtures in highway engineering JTG F

40 Technical Specifications for Highway Asphalt Pavement Construction

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 11 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Buy GB/T 45019-2024

  1. 1Add to cart. Click the "Buy GB/T 45019-2024" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
11 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 45019-2024

$260.00

$220.00for partners