Valid

GB/T 44710-2024Guidelines for construction of pilot base in chemical industry park (English PDF)

化工园区中试基地建设导则

Open the GB/T 44710-2024 preview as PDF

Preview — first pages of GB/T 44710-2024 (full document: 15 pages)

This is a limited preview

Buy now to download the full PDF (15 pages)

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

October 26, 2024

Implementation date

May 1, 2025

Scope

GB/T 44710-2024 is the English-translated version of 化工园区中试基地建设导则.

GB/T 44710-2024 is the Chinese national standard covering the pilot base where a chemical process is scaled up between laboratory and plant — the site selection and the external distance that keeps a trial reactor away from what a park has already built around it, the layout with its roads and pipe corridors, the zoning into management, pilot, auxiliary and storage areas, the public works, the safety, environmental and fire provisions, and the reuse or scrapping of a unit. A pilot unit runs chemistry that is not yet proven at a scale that already reaches its neighbours. First edition, in force from 1 May 2025. Issued on 26 October 2024, it has been in force since 1 May 2025.

Document preview — GB/T 44710-2024

National Standard of the People's Republic of China

ICS
13.300
Classification
G 00

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Preface... III 1 Scope1
  • 2 Normative references1
  • 3 Terms and Definitions2
  • 4 General Requirements2
  • 5 Site Selection2
  • 5.1 Site Selection Requirements2
  • 5.2 External distance2
  • 6 Overall layout2
  • 6.1 General Layout3
  • 6.2 Vertical Design3
  • 6.3 Roads within the pilot plant3
  • 6.4 Comprehensive Pipeline Layout4
  • 6.5 Greening Design4
  • 7 Architecture and Structure4
  • 7.1 General Provisions4
  • 7.2 Architectural Design4
  • 7.3 Structural Design4
  • 8 Zoning facilities4
  • 8.1 Management Facility Area4
  • 8.2 Pilot Plant Area5
  • 8.3 Public Auxiliary Facilities Area5
  • 8.4 Storage facilities area5
  • 9 Public Works5
  • 9.1 Water Supply and Drainage5
  • 9.2 Heating, Ventilation and Air Conditioning5
  • 9.3 Electrical6
  • 9.4 Heating and Cooling6
  • 9.5 Gas Supply6
  • 10 Safety, Environmental Protection and Fire Protection7
  • 10.1 Security7
  • 10.2 Environmental Protection7
  • 10.3 Firefighting7
  • 11 Informatization7
  • 11.1 General Provisions8
  • 11.2 Requirements for Information Construction8
  • 12 Pilot plant reuse and scrapping8
  • References9

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1: Structure and drafting rules for standardization documents". Drafting is required.

Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents.

This document is proposed and coordinated by the National Technical Committee for Standardization of Hazardous Chemicals (SAC/TC 251).

This document was drafted by: China Chemical Economic and Technological Development Center, China National Chemical Engineering Group Co., Ltd., Donghua Engineering Technology Co., Ltd.

Co., Ltd., China Tianchen Engineering Co., Ltd., Ningxia Ningdong Technology Venture Capital Co., Ltd., PetroChina Co., Ltd.

Chemical Research Institute, China Wuhuan Engineering Co., Ltd., Zhejiang Tianzheng Design Engineering Co., Ltd., Shanghai Huanqiu Engineering Co., Ltd., Dalian Li University of Science and Technology Civil Engineering and Architectural Design Institute Co., Ltd., Nanjing University of Science and Technology, Liaoning Fine Chemical Industry Technology Development Co., Ltd., China Construction Installation Group Co., Ltd., Maoming Green Chemical Research Institute, Saifeite Engineering Technology Group Co., Ltd., and Zhejiang Wansheng Co., Ltd.

The main drafters of this document are: Yang Ting, Zhou Wei, Yao Dayuan, Liu Xinwei, Feng Yuanyuan, Ma Congyue, Wang Yu, Li Zhenhao, Guo Guoqing, Zhu Shenggan, Xu Hanghang, Hu Wei, Chang Yi, Jiang Juncheng, Zhang Jianguo, Liu Fujian, Zhou Rujin, Gao Jian, Qu Jingbo, Wei Tao, Zhao Jinsong, Wu Hao, Wang Cong, Yang Si, Huang Yiping, Li Di, and Li Xufeng.

Guidelines for the Construction of Pilot Plants in Chemical Parks

1 Scope

This document specifies the overall requirements, site selection, overall layout, building and structure, zoning facilities, and public works for the pilot plant construction in the chemical park.

Requirements on process, safety, environmental protection, fire protection, informationization, and reuse and scrapping of pilot plants.

This document applies to the construction, reconstruction and expansion of pilot bases in chemical parks.

2 Normative references

GB 5749

GB 12348

GB 15603

GB 50016

GB/T 50046

GB/T 50050

GB 50052

GB 50057

GB 50058

GB/T 50065

GB 50140

GB 50160

GB 50351

GB 50453

GB 50462

GB/T 50483

GB 50489

GB/T 50779

GB 50914

GB/T 50934

GB 50974

GB 51283

GB 51309

GB 55001

GB 55016

GB 55030

GB 55036

GB 55037

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Normative references

GB 12348 · GB/T 50046 · GB/T 50050 · GB 50052 · GB 50057 · GB 50058 · GB/T 50065 · GB 50140 · GB 50160 · GB 50351 · GB 50453 · GB/T 50483 · GB 50489 · GB/T 50779 · GB 50914 · GB/T 50934 · GB 50974 · GB 51283 · GB 51309 · GB 55001 · GB 55016 · GB 55030 · GB 55036 · GB 55037

Editions of GB/T 44710

EditionTitleRevisionStatus
GB/T 44710-2024Guidelines for construction of pilot base in chemical industry parkcurrent editionCurrent

This page sells the current edition, GB/T 44710-2024. Earlier editions are listed for reference only.

How to Buy GB/T 44710-2024

  1. 1Add to cart. Click the "Buy GB/T 44710-2024" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 44710-2024

$260.00

$220.00for partners