GB/T 41996-2022Guide of operation management model for the digital workshop of switchgear (English PDF)
开关设备数字化车间运行管理模型指南
This is a limited preview
Buy now to download the full PDF (30 pages)
Need quotation for your management?
Get a formal quotation for GB/T 41996-2022 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
October 14, 2022
Implementation date
May 1, 2023
Scope
GB/T 41996-2022 is the English-translated version of 开关设备数字化车间运行管理模型指南.
GB/T 41996-2022 is the Chinese national guide to the operation management models of a digital switchgear assembly workshop.
After the basis on which such a model is built, it describes eight models in turn - production planning and scheduling, production line operation, material distribution, equipment management, quality inspection, product manufacturing, process and safety - and treats each one the same way, through its running model, its drive data, its running process and the output of its results.
It is written to guide the digital assembly workshops of gas-insulated metal-enclosed switchgear rated 72.5 kV and above and of 3.6 kV~40.5 kV metal-enclosed switchgear and controlgear, and says other switchgear can apply it by reference. Issued on 14 October 2022, it has applied since 1 May 2023.
Found what you need?
Document preview — GB/T 41996-2022
National Standard of the People's Republic of China
- ICS
- 29.130.10
- Classification
- K 43
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Preface
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
- 4 Abbreviations
- 5 Construction basis of operation management model of switchgear digital workshop
- 5.1 Analysis of operation management model of switchgear digital workshop
- 5.2 Basic requirements of the operation management model
- 6 Production Planning Scheduling Model
- 6.1 Running Model
- 6.2 Drive data
- 6.3 Running the process
- 6.4 Running result output
- 7 Production line running model
- 7.1 Running the model
- 7.2 Drive data
- 7.3 Running the process
- 7.4 Running result output
- 8 Material distribution model
- 8.1 Running the model
- 8.2 Drive data
- 8.3 Running the process
- 8.4 Running result output
- 9 Device Management Model
- 9.1 Running the model
- 9.2 Drive data
- 9.3 Running the process
- 9.4 Running result output
- 10 Quality Inspection Model
- 10.1 Running the model
- 10.2 Drive data
- 10.3 Running the process
- 10.4 Running result output
- 11 Product Model
- 11.1 Running the Model
- 11.2 Drive data
- 11.3 Running the process
- 11.4 Running result output
- 12 Process Model
- 12.1 Running the Model
- 12.2 Drive data
- 12.3 Running the process
- 12.4 Running result output
- 13 Security Model
- 13.1 Running the Model
- 13.2 Drive data
- 13.3 Running the process
- 13.4 Running Results Output
- Reference
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1: Structure and Drafting Rules of Standardization Documents" drafted.
1 Scope
This document provides the basis for the construction of the digital workshop operation management model of switchgear, the production planning and scheduling model, the production line operation model, the material Guides such as material distribution model, equipment management model, quality inspection model, product manufacturing model, process model and safety model.
This document is applicable to guide 72.5kV and above gas-insulated metal-enclosed switchgear and 3.6kV~40.5kV metal-enclosed switchgear The operation management model of the digital assembly workshop of equipment and control equipment is built, and other switchgear can be implemented by reference.
2 Normative references
The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, dated citations documents, only the version corresponding to that date applies to this document; for undated references, the latest edition (including all amendments) applies to this document.
GB/T 3906-2020 3.6kV~40.5kV AC metal-enclosed switchgear and control equipment
GB/T 7674-2020 Gas-insulated metal-enclosed switchgear with rated voltage of 72.5kV and above
GB/T 18725-2008 Manufacturing Information Technology Terminology
3 Terms and Definitions
The terms and definitions defined in GB/T 18725-2008 and the following terms and definitions apply to this document.
3.2 Switchgear and controlgear that are fully assembled and enclosed in a grounded metal enclosure, except for external connections. [Source: GB/T 3906-2020, 3.102, with modifications]
3.1 Gas-insulated metal-enclosed switchgear
Metal-enclosed switchgear and control switches employing at least part of the gas above atmospheric pressure as the insulating medium. [Source: GB/T 7674-2020, 3.2]
3.3 Digitalization
Representing (or representing) data in numerical form that is not otherwise discrete data. Specifically, it is to convert images or sounds into digital code so that the information can be processed and stored by the computer system. In the information age, digitization has become an indicator of the degree of informatization. an important indicator. [Source: GB/T 18725-2008, 3.83]
3.4 Digital workshop
Based on the physical workshop and using information technology as a method, data is used to connect different units of the production and operation process to plan and manage production. management, diagnosis and optimization to achieve high efficiency, low cost and high quality of product manufacturing.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 30 pages — is available in the English PDF.
Referenced standards
Normative references
Similar standards
How to Download GB/T 41996-2022
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 18725-2008 — Manufacturing information - Technical terminology
GB/T 3906-2020 — Alternating-current metal-enclosed switchgear and controlgear for rated voltages above 3.6 kV and up to and including 40.5 kV
GB/T 7674-2020 — Gas-insulated metal-enclosed switchgear for rated voltages of 72.5kV and above
Secure payment via Stripe
Payments accepted
GB/T 41996-2022
$455.00