Valid

GB/T 40058-2021Coding specification for the national fixed assets investment projects (English PDF)

全国固定资产投资项目代码编码规范

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for GB/T 40058-2021 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

April 30, 2021

Implementation date

August 1, 2021

Scope

GB/T 40058-2021 is the English-translated version of 全国固定资产投资项目代码编码规范.

GB/T 40058-2021 sets the rules for the code that identifies each fixed asset investment project in China. Generated by the national online approval and supervision platform for investment projects, the code serves as the unique identifier of a project over its whole construction cycle.

The standard defines its structure, made of a time code, an area code, a central business guidance department code, a project type code, a random code and a check code, and the project types: capital construction, technological transformation, pure purchase, informatization and other projects.

It covers how codes are applied for, assigned and identified, where they are used in approval, supervision and information sharing, how they are maintained, and a separate management code for PPP projects. It was issued on 30 April 2021 and has applied since 1 August 2021.

Found what you need?

Document preview — GB/T 40058-2021

National Standard of the People's Republic of China

ICS
03.160
Classification
A 24

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Foreword
  • Introduction
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions
  • 4 Project code structure
  • 4.1 Structural requirements
  • 4.2 Time code
  • 4.3 Area code
  • 4.4 Central Business Guidance Department Code
  • 4.5 Item type code
  • 4.6 Random code
  • 4.7 Check code
  • 5 Project code generation
  • 5.1 Application project code
  • 5.2 Assign project code
  • 5.3 Project code identification
  • 6 Project code application
  • 6.1 Application scope of project code
  • 6.2 Project code verification
  • 6.3 Collecting approval information
  • 6.4 Sharing approval results
  • 6.5 Collecting project supervision information
  • 6.6 Query project handling information
  • 6.7 Submit project construction information
  • 6.8 Other applications
  • 7 Project code maintenance
  • 7.1 Project code and logo management
  • 7.2 Project code processing for approval document extension
  • 7.3 Project information management after coding
  • 7.4 Handling of project code for re-approval, approval, and filing
  • 7.5 Handling of project codes with incorrect codes
  • 7.6 Handling of invalid project code
  • 7.7 Handling of project code separately demonstrated by multiple feasibility study reports
  • 7.8 Project code processing for new project types
  • 7.9 Code Maintenance Organization
  • 8 PPP project management code
  • 8.1 Basic requirements
  • 8.2 PPP project management code structure
  • 8.3 PPP project management code generation
  • 8.4 Application of PPP project management code
  • Appendix A (informative) Code coding example of national fixed asset investment projects
  • Appendix B (informative) PPP project management code coding example
  • Reference

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1: Structure and Drafting Rules of Standardization Documents" Drafting.

Introduction

The code system for fixed asset investment projects is the "Opinions of the Central Committee of the Communist Party of China and the State Council on Deepening the Reform of the Investment and Financing System" (Zhongfa (2016) 18 No.), "Government Investment Regulations" (Order No. 712 of the State Council) and "Administrative Regulations on the Approval and Filing of Enterprise Investment Projects" (Order No. 673 of the State Council) A clearly defined basic system for investment management. Good use of the project code is the legal obligation of the project unit and the legal responsibility of the relevant departments. Nationwide The project code generated by the online approval and supervision platform for investment projects (referred to as the online platform) serves as the unique identifier for the entire construction cycle of the project.

It is a basic means used by relevant departments to strengthen collaborative management and improve service levels, and it is also a convenient way for project units to obtain government management service credit.

An important tool for efficient and efficient project work has strongly supported the approval, supervision and service work of government departments.

This document is designed in accordance with the basic principles and methods of information coding related to national standards, and is filled with code structure design and code type selection.

Considering various application requirements in project management, enhancing the scalability and compatibility of coding, and reserves expansion space for future optimization.

1 Scope

This document specifies the code composition, code assignment procedures, coding rules, application fields and maintenance methods of fixed asset investment projects.

This document is applicable to the standardized management of various fixed asset investment project codes.

2 Normative references

The contents of the following documents constitute the indispensable clauses of this document through normative references in the text. Among them, dated quotations Only the version corresponding to that date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to this document.

GB/T 10113-2003 General terminology for classification and coding

3 Terms and definitions

The following terms and definitions defined in GB/T 10113-2003 apply to this document. For ease of use, the following is repeated Certain terms and definitions in GB/T 10113-2003.

3.1 Coding

The process of assigning code to things or concepts. [Source: GB/T 10113-2003, 2.2.1]

3.2 Code

A character or group of characters that represents a specific thing or concept. [Source: GB/T 10113-2003, 2.2.5]

3.3 Fixed asset investment projects

Fixed asset investment projects invested and constructed in China.

Note: There is a main function, an overall design, economically independent accounting, in accordance with the "Government Investment Regulations" "Enterprise Investment Project Approval and Record Management Regulations" Example "The construction unit (activity) managed.

3.4 Project type

Determine the project type according to whether the project is classified or not and the main construction content of the project, and divide the project into basic construction according to the main construction content of the project Projects, technological transformation projects, pure purchase projects, informatization projects and other projects.

Note 1. The capital construction project is composed of one or several individual projects within the scope of an overall design or preliminary design. Fixed asset investment projects under unified management in politics.

Note 2. Technological transformation projects are the use of new technologies, new processes, new equipment, and new materials to transform and upgrade existing facilities, process conditions, and production services, etc. Post-production capacity, realizing fixed asset investment projects for the purpose of connotative development.

Note 3. Purchasing projects simply means that government departments or enterprises simply purchase equipment, tools, and appliances in accordance with regulations, including vehicles, ships, airplanes, exploration equipment, and construction machinery Etc., fixed asset investment projects managed in accordance with the "Government Investment Regulations" and "Enterprise Investment Project Approval and Filing Management Regulations".

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download GB/T 40058-2021

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 40058-2021

$285.00